Discusses Issue That Pilgrim EPZ Has No Reception Center to North
ML20067C819
Person / Time
Site: Pilgrim
Issue date: 02/04/1994
From: Fleming J
AFFILIATION NOT ASSIGNED
To: The Chairman
NRC COMMISSION (OCM)
Shared Package
ML20064C377 List:
References
NUDOCS 9403040248
Download: ML20067C819 (2)


Text

-

/5'//h 6

L Feb.

4, 7994 chairma.it S et4rt,

The. " resp onsLv eness" "iutp" holds, bu.t tek me. clarlfy Lt.

You do stot have. to re4 pond to me. persona 44y, th44.istt'4 an ego thirtg, hat as Chauuna.rt of the. NRC you. da have 40 resportd to my issu.cs.

Tlte f a.ct the PLLgrim EPZ at this mometyt has n.o re.ceptlon center 40.the. North. Ls a. very serLous artd vnid issu.c..

It is etearly C. vlotatLort of 10 CFR S 0 : 47 13 &.

Et is, I assu.me, paA.t of your oa th of of fice. to u ph.old tite. peAtittettt reguAatto rts.

Pu.blic Health and Saf ety are. bel.rtg threatert.d at th.v., moment.

If there. is a.ru a.ccident at PLLgrim or Seabrook., portiorts of the. pu.blic are. wLthout.the. mandated re. cept 4 ort certte4, I rt your stote you sta te. therc. was a. f ull re. vie.W artd

. i ItcarLrte of my complad.rtt ( 2. 2 0 6 P e.t i t L ort)

Dr. Thomas Murley a.n d i de.termLrte.d that was rtot the. case.

The. de.cisLort se.e.mirtgty ooertoohed two ycars of worh. pes.f owne.d by Jim partlow.

Th.c. Dire.ctor has a gresd to re. ope.ru the.e. ma.]or issu.es I tite. Welleste.y Re.ce.ptLort Cc' Ler, tite. lach. of compcrtment wLtit NUREG 0 6 54 A. 3., a.rtd the utLLLLLe.s ina.bLllty 4 o d c v et o p ar accura.te a.rtd tim e.t y P A R.

Irtde.e.d you. ptaye.d an a.ctive. part 4rt cituc4opLng the. takter two issu.es.that.the.

04re.c. tor's decis4 ort o v erto ohc.d.

1 agree, my originaA a.ccess to Lite. f omnes Chairmart i

a.rtd Commisslort wa.s u.rtprc ce dente.d, i urtdersta.rtd that 2 was the.

first rne.mbcr of thc. pu.blic to have. a. prLva.te. a.ppointment WLth titc. ClwJ.rma.rt of the,NRC.

A gal.rt, this 4s rtot a, persortal thirts. Tite issu.e.s I brou.sht to citairma.rt Carr were. va4Ld.

My de. sire to improve. e.mcrgency ptartrtLrtg was re.c.ogitite.d and my WLLlittgrtess to te.aArt a.rtd work throu. git the system Wa.s ap pre.ciate.d.

Artd my persLstertce paid of f.

I s tLlt a.ltempt to wod. throu.gli the system, but, it has be.come. 4nc.re.as4rtsty dif f Leutt.

I a.m quite. prou.d of th.e. f a.c.t tha.t I sea prec.e.dence. Lrt aAlowLrte " mere." me.mbcss of the. pu.blic a.cc.ess to tite.

Commiss4 ort.

Af ter ait it 4s the. Pu.bt4c 's He.a.Eth, a.itd Sa.f ety you cAc mattdatt d to prote.c.t. I know that my hitoW4e.dge, ist the, field of emea.gc.itcy pre. pare.dttes4, in part4ca4ar, P44grW4 emergercy prepare.dacas, Lerds me, the, cortfide.rtce, to pre.sen.t aceurate. c.itd tincip inf orma4Lort to.the. Commission.

I assu.me othes membcr of the. pu.blLc are e.qually futowle.dgcable.:Lrt titels fLetds.

The. resportse Rort Eatort pre.paA.ed f or you. was rtot resportsive. to the stateme.nt 1 ma.de. to you ort Jan. 18, 1994.

I w4tt enctose, the, sta.temert, a. gain, f or your cort 44deraAlort a.rtd re.me.d y.

Pcrita.ps you. c.ouAd e.x.plairt to Mr. EaLort.that I am stol tooh.trte f or a. sta.tus re. port of th.e. tra.rtsitiott of O

y

(\\M9c3cNM fafb w

~

rc.cc.p.tiort centca.4 I am tooM.4g f or a. 4c.ce.pt4 ort certe.4 c.rA.4tittg toda.y.

I do Ac.vc a 44mp4c 4e.mc.dy, tha.t c ctwa/.4y I am very su.rpn.Lse.d.th.c. Commissiott dLd rtot take..

I wLlt'be.

gtc.d 4o dLscass it with. you..

S4rtecac4y,

Ja.rtc. FLe.mLrt.g

?_>

l b

l I

2

/a4/44

r E0*d 10101 s

    • 'CQ

-t UNITED STATES

[

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055H001 f

3anuary 28, 1994

%g * * *. + j Hs. Jane A. Fleming 8 Oceanwood Drive Duxbury, Massachusetts 02332

Dear Hs. Fleming:

I am responding to your letter dated January 18, 1994. The Federal Emergency Management Agency (FEMA) and Massachusetts Emergency Management Agency (MEMA) are the responsible agencies in the area of offsite emergency preparedness.

They are both aware of the status of the reception centers that service the emergency preparedness zones (EPZ) for Pilgrim Nuclear Power Station (PNPS).

Both agencies are following the orderly, managed transition from the Wellesley reception conter to a new reception center at South Weymouth Naval Air Station in South Weymouth, Massachusetts, and find the process and progress acceptable.

I am enclosing a copy of the most recent monthly status report on the progress of establishing the new center. This report and the four previous reports are in the local public document room at the olymouth Public Library.

The U.S. Nuclear Regulatory Commission (NRC) _ dos nnt agree with your Qb[

assessment that PNPS and Seabrook Station are in violation of 10 CFR

/,

50.47(b)(8). Also, as you are aware NUREG-0654/ FEMA-REP-1, " Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," is not a compliance document but a guidance document for the NRC and FEMA to use to aid in evaluating emergency plans and preparedness of nuclear power plants and site environs.

A copy of your letter and my response is being provi.ded to FEMA and HEMA.

Sincerely, nald B. Eaton, Senior Project Manager Project Directorate 1-3 Division of Reactor Projects - I/II office of Nuclear Reactor Regulation

Enclosure:

Monthly Status Report E}LfDk

~

A

/(

-