Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067D835 + (16:26:59, 16 December 2024)
- 05000331/LER-1982-077-03, /03L-0:on 821116,during Surveillance Testing,Rhr Svc Water Pump 1P-22D Failed to Meet Tech Spec Requirements. Caused by Loose Impeller on Shaft.Cause Under Investigation. Pump Rebuilt + (16:27:00, 16 December 2024)
- B10630, Forwards Revision to Physical Security Plan.Revision Withheld (Ref 10CFR2.790) + (16:27:01, 16 December 2024)
- L-82-538, Interim Deficiency Rept Re micro-switch Ptk Selector Switches.Initially Reported on 821110.Review Continuing. Final Rept Will Be Submitted by 830110 + (16:27:02, 16 December 2024)
- ML20067D819 + (16:27:02, 16 December 2024)
- 05000331/LER-1982-077, Forwards LER 82-077/03L-0 + (16:27:03, 16 December 2024)
- ML20067D811 + (16:27:04, 16 December 2024)
- L-82-539, Interim Deficiency Rept Re Insulation on Conax Ring Tongue Connectors.Initially Reported on 821110.Investigation Continuing.Final Rept Will Be Submitted by 821228 + (16:27:05, 16 December 2024)
- ML20067D802 + (16:27:05, 16 December 2024)
- ML20067D799 + (16:27:06, 16 December 2024)
- ML20067D791 + (16:27:07, 16 December 2024)
- ML20067D798 + (16:27:07, 16 December 2024)
- ML20067D790 + (16:27:08, 16 December 2024)
- ML20067D787 + (16:27:09, 16 December 2024)
- ML20067D774 + (16:27:09, 16 December 2024)
- ML20067D773 + (16:27:10, 16 December 2024)
- ML20067D762 + (16:27:14, 16 December 2024)
- ML20067D766 + (16:27:14, 16 December 2024)
- BSEP-91-0058, Monthly Operating Repts for Brunswick Steam Electric Plant Units 1 & 2 for Jan 1991 + (16:27:15, 16 December 2024)
- ML20067D744 + (16:27:15, 16 December 2024)
- ML20067D743 + (16:27:16, 16 December 2024)
- ML20067D737 + (16:27:17, 16 December 2024)
- ML20067D728 + (16:27:17, 16 December 2024)
- ML20067D727 + (16:27:18, 16 December 2024)
- 05000328/LER-1982-136-03, /03L-0:on 821115,inleakage Found to Be 340 Cubic Ft Per Minute to Annulus During Performance of Surveillance Instruction 264.Caused by Numerous Leaks Found Through Personnel Access & Equipment Doors & Other Areas + (16:27:19, 16 December 2024)
- ML20067D715 + (16:27:20, 16 December 2024)
- 05000328/LER-1982-136, Forwards LER 82-136/03L-0 + (16:27:22, 16 December 2024)
- ML20067D711 + (16:27:22, 16 December 2024)
- ML20067D706 + (16:27:23, 16 December 2024)
- ML20067D707 + (16:27:23, 16 December 2024)
- 05000321/LER-1982-093-03, /03L-0:on 821107,liquid Radwaste Discharge Monitor Auto Control to Discharge Isolation Valve Found Inoperable During Liquid Radwaste Discharge.Caused by Jumper Not Being Removed After Completion of Corrective Maint.Jumper Re + (16:27:25, 16 December 2024)
- ML20067D691 + (16:27:26, 16 December 2024)
- ML20067D689 + (16:27:27, 16 December 2024)
- 05000278/LER-1994-002-01, :on 940203,discovered Main Generator Ground Relay Status Light Out.Caused by Internal Rack Out Tab Not Installed on Alterex Field Breaker.Damaged Component Repaired & Breaker Replaced W/Spare + (16:27:29, 16 December 2024)
- 05000321/LER-1982-093, Forwards LER 82-093/03L-0 + (16:27:30, 16 December 2024)
- ML20067D676 + (16:27:30, 16 December 2024)
- ML20067D675 + (16:27:32, 16 December 2024)
- 05000331/LER-1982-079-03, /03L-0:on 821117,B Core Spray Sys Header to Top of Core Plate High Differential Pressure Switch Tripped at 2.1 Psid.Caused by Instrument Drift.Switch Recalibr & Tested Satisfactorily + (16:27:33, 16 December 2024)
- ML20067D670 + (16:27:35, 16 December 2024)
- 05000331/LER-1982-079, Forwards LER 82-079/03L-0 + (16:27:37, 16 December 2024)
- ML20067D658 + (16:27:38, 16 December 2024)
- ML20067D652 + (16:27:40, 16 December 2024)
- ML20067D654 + (16:27:40, 16 December 2024)
- ML20067D650 + (16:27:41, 16 December 2024)
- ML20067D643 + (16:27:41, 16 December 2024)
- 05000387/LER-1982-053-03, /03L-0:on 821111,during Startup Testing Program, Control Structure Heating & Ventilation Sys Chlorine Detector Determined Inoperable.Caused by Clogged Wick in Chlorine Detector.Equipment Repaired + (16:27:43, 16 December 2024)
- ML20067D631 + (16:27:44, 16 December 2024)
- 05000387/LER-1982-053, Forwards LER 82-053/03L-0 + (16:27:45, 16 December 2024)
- ML20067D629 + (16:27:45, 16 December 2024)
- ML20067D622 + (16:27:46, 16 December 2024)
- 05000317/LER-1982-071-03, /03L-0:on 821109,during Reactor Trip Recovery, Charging Pump 12 Breaker Would Not Close.Caused by Dirty Breaker Charging Motor Cutoff Switch Contacts.Coil Replaced & Cutoff Switch Contacts Cleaned + (16:27:48, 16 December 2024)
- ML20067D615 + (16:27:49, 16 December 2024)