Fifth Interim Rept of Significant Const Deficiency 35 Re Matl Properties of Jc White Co Tube Track & Welded Fittings. Corrective Action Will Be Completed by 830401.Final Rept Will Be Sent by 830508
ML20067D652
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/15/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3I82-0099, W3I82-99, NUDOCS 8212210066
Download: ML20067D652 (2)


Text

_ __ __ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _

s e

I OUISIANA 342 octAnoNoe smm POWER & LIGHT P O BOX 6008

  • NEW ORLEANS. L9UISIANA 70174 + (So4) 366 2345

'SE dvE u November 15, 1982 L V. MAURIN Voce Presodent Nuclear Operations W3182-0099 Q-3-A35.07[35 l

1 Mr. John T. Collins, Regional Administrator, Region IV v U. S. Nuclear Regulatory Commission ([ J 611 Ryan Plaza Drive, Suite 1C00 Mf k Arlington, Texas 76012 u I]

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency Report No. 35

" Material Properties of Tube Track and Welded Fittings" Fifth Interim Report

REFERENCE:

LP&L Letter W3K-82-0368 Dated June 24, 1982

Dear Mr. Collins:

Originally, SCD-35 involved an audit of Q. A. Program implementation and Quality Assurance documentation of James C. White Co. This company produces tubing support components for the instrumentation industry.

During the Engineering evaluation and following resolution of the original problem, it was established that an additional concern existed, which was the seismic qualification of tube track fittings and their utilization in '-

a seismically qualified installation. Each instrument line may fit one of the following cases:

1) If the cantilevered length from a support in a single direction is less than 6'6" total linear length without credit for fittings' length, it is a qualified installation pcr New York analysis and DCN 833, R2 and IC-155.
2) If the cantilevered length is over 6'6" and one or more fittings exist in that length, then the unqualified J. C. White fittings must be re-placed with qualified fittings. No such fittings exist on the market.

Ebasco has designed and qualified, and is building the same on site.

Presently, I&C Construction Engineering has identified approximately 1100 instrument lines to be evaluated against corresponding Mercury drawings and i applicable field work. They have assigned two senior engineers full time l to complete the engineering and it is estimated that it will take a month's l time to do so. l At the present time, none of the J. C. Wh1te tube track fittings can be qualified because of lack of traceability. Also, it is not known at this time how many lines must be second-supported or how many fittings must be 4y changed out per corrective action program. This program has been established 8212210066 821115 PDR ADOCK 05000382 S PDR

c- .

9

  • n l

Mr. John T. Collins W3I82-0099 l Page 2 l

to complete field review and subsequent acceptance / replacement prior to fuel load. Corrective action has been assigned to both Ebasco Force Account and the I&C contractor, Mercury. Corrective action is to be completed April 1, 1983.

In view of the above, a final report will be transmitted by May 8, 1983.

Very truly yours, M

L. V. Maurin LVM/ MAL:keh cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
3) E. Blake
4) W. Stevenson i