ML20067D670

From kanterella
Jump to navigation Jump to search
Amend 129 to License DPR-75,revises pressure-temperature Limit Curves for Heatup,Cooldown,Hydrostatic Tests, & Criticality for 15 Effective Full Power Years
ML20067D670
Person / Time
Site: Salem 
Issue date: 02/22/1994
From: Chris Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20067D673 List:
References
NUDOCS 9403080360
Download: ML20067D670 (5)


Text

-

f UNITED STATES

/

NUCLEAR REGULATORY COMMISSION

E WASHINGTON, D.C. 20566-0001 o..

G Y+,

,o PUBLIC SERVICE ELECTRIC & GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION. UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.129 License No. DPR-75 1.

The Nuclear Regulatory Comission (the Comission or the NRC) has found that:

A.

The application for amendment filed by the Public Service Electric &

Gas Company, Philadelphia Electric Company, Delmarva Power and Light a

Company and Atlantic City Electric Company (the licensees) dated January 25, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission;

)

C.

There is reasonable assurance: (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:

9403080360 940222 ADOCK0500g1 PDR P

, (2) Technical Soecifications' and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as.

revised through Amendment No.129, are hereby incorporated in the 1.i cense.. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION f%

Charles L. Miller, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

, Changes to the Technical Specifications Date of Issuance: February 22, 1994 l

i I

I

.....,.m...

i l

1 i

ATTACHMENT TO LICENSE AMENDMENT NO.129 FACILITY OPERATING LICENSE NO. DPR-75 4

4 i

DOCKET NO. 50-311 i

A i

Revise Appendix A as follows:

Remove Paaes Insert Paaes 1

i j

3/4 4-28 3/4 4-28 i

3/4 4-29 3/4 4-29

.[

A 9

0 i

f 1

4 i

e i

e l

2 j

i 4

t i

[

t d

4 4

i

e 1

l

3
  • i i

l LIMITING ART AFTER 15 EFPY:

1/4T, 151'F i-3/4T, 102*F i

2500 w

y s;,c t i i ttiilisiitti r

i i

)

i M TEST N i I

i I

i i

i l l j

2250 3

I I

I i

?

?

f1 1

1 4

+

t 6

ff r

r l

2000 l

l l#

)

/

l 4

i i

I

/

i l

I l

J i

l 1750 l

[

[

}

/

/

l j

j r

r i

7 1500 l UNACCEPTh 2

!/

/

ACCEPTABM l

3 OPERA 110N OMN l

t l

I g 1250 l

l 4

3 f

i l

l1000

/

l e

== nwur mEor i.

3 e609nat j

u 750 ---

E l

-~

CRITICA!JITIJbET i

a 500 BASED ONINSERVICE Q

HYDROSTATIC 1EST l

TEMPERATURE (2848F)

-~

250 FOR'nIE SERY1CE PERIOD--

UP1015 EFPY "C

i iiiI ! I I I I I I I iiii 0

O 50 100 150 200 250 300 350 400 450 500 i

lisolcATCO TEMPERATURE (DEG.P')

i i

i SALEM UNIT 2 REACTOR COOLANT SYSTEM HEATUP j

LIMITATIONS APPLICABL'E FOR THE FIRST 15 EFPY WITH MAXIMUM HEATUP RATE OF 60 F/HR.

CURVE i

CONTAINS NO MARGIN FOR INSTRUMENT ERROPS.

Figure 3.4-2 1

1 a

SALEM UNIT 2 3/4 4-28 AMENDMENT No.129

d

+

I

!ii' LIMITING AAT AFTER 15 EFPY:

1/4T, 151*F 3/4T, 102*F 1

l j

2500 sum-

! ii i

.i j

I i ii I

ii I

2250 i

i i,

l I

i6 I

s I

i j

4 2000

/

I 4

r i

i 1750 I'

UNACCEPTABLE

/

ll l

OPERATION y 1500

'l j

i.

r 6

/'

l g 1250

/

l' R

/

ACCEPTABLE

' +

i OPERATION i

j k1000 l

f o

i i

s f

i 6

6 5

F i

i j W

,a 0

750 : COOLDOWN RATES m/

i em

//;

a i j

[

g

'F/HR um 0

4 s

-aw l

500 E

-ur Y'

bann

,r 6

w q

ge i

s s

u t

(

250 IE" i !

a i

i 1

00 50 100 150 200 250 300 350 400 450 i

lNOICATED TChePERATURE (DEG.f) l SALEM UNIT 2 REACTOR COOLANT SYSTEM C00LDOWN LIMITATIONS APPLICABLE FOR THE FIRST 15 EFPY WITH MAXIMUM C00LDOWN RATE OF 100 F/HR.

CURVE CONTAINS NO MARGIN FOR INSTRUMENT ERRORS.

i.

5 Figure 3.4-3 e

a SALEM UNIT 2 3/4 4-29 AMENDMENT NO.129 m

  1. _.-._._...,__,.,m._,.~.

- - - -,.. -. -