Re 10 to Hope Creek Generating Station Event Classification Guide
ML20067D790
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/11/1991
From:
Public Service Enterprise Group
To:
References
PROC-910111, NUDOCS 9102130246
Download: ML20067D790 (53)


Text

.. - -

PUBLIC SERVICE ELECTRIC & GAS COMPANY 02/04/93 DOCUMENT DISTRIBUTION NOTICE PAGE 1 OF 1

TRANSMITTAL: DDG 0170843 TO NUCLEAR REGULATORY COMMISSION 1

DOCUMENT CONTROL DESK COPYHOLDER: HECG0065 WASHINGTON, DC 20555 DESCRIPTION: LAH UPDATE HCEG PLEASE INSERT THE FOLLOWING DOCUMENTS INTO YOUR CONTROLLED FILE / MANUAL.

SUPERCEDED DOCUMENTS MUST BE SO MARKED AND PHYSICALLY REMOVED OR DESTROYED.

SHT/

CLASS DOCUMENT ID VOL INST REV STAT TYPE FORMAT QTY PROC HECG-TOC 000 010 A HECG H

001 l-bk$[O$ojg4

{

PDR PLEASE SIGN AND DATE THIS NOTICE TO ACKNOWLEDGE RECEIPT i

l AND RETURN WITHIN 5 WORKING DAYS TO:

l

?$

DOCUMENT DISTRIBUTION NDAB, N04

..s C' COPYHOLDER SIGNATURE:

DATE:

(.C bk DDG USE ONLY:

DATA ENTRY COMPLETED:

l m

,m

BOPE CREEK CENERATING STATION EVENT CLASSIFICATION GUIDE JANUARY 11, 1991

()

CHANGE PAGED FOR REVISION fic The Table of Contents forms a general guide to the current rev.ision of each section of the Hope Creek ECG.

The changes that are made in this TOC Revision #10 are shown below.

Please check that your revision packet is complete and remove the outdated material listed

.below.

ADD REMOVE Eggg Descriotion Rev.

EgLgg Qggerioti.pl1 Eph 1 of 2 TOC 10 1 of 2 TOC 9

thru thru 2 of 2 2 of 2 1 of 2 Sec. Sig. Page 7

1 of 2 Sec. Sig Page 6

thru-thru 2 of 2 2 of 2 1 of 2 Att. Sig. Page 8

l'of 2 Att. Sig. Phge 7

thru thru 2 of 2 2 of 2

(~h 1 of 9 Section 11 1

1 of 9 Section 11 0

(_)

thru thru 9 of 9 9 of 9 1 of 1 Section lii 4

1 of 1 Section lii 3

1 of 2 Section 4 1

1 of 2 Section 4 0

thru thru 2 of 2 2 of 2 lof 5 Section 7 1

1 of 5 Section 7 0

thru thru 5 of 5 5 of 5 1 of 2 Section 10 1

1 of 2 Section 10 0

thru thru 2 of 2 2 of 2 1 of 2 Section 15 1

1 of 2 Sectioa 15 0

2 thru-thru 2 of 2 2 of 2 1 of 5 Section 18 4

1 of 5' Section 18 3

thru thru 5 of 5 5 of 5 1 of 6 Att. 6 6

1 of 6 Att. 6 5

O thru thru 6 of 6 6 of 6 9

HC-ECG 1 of 2

l-

\\

Page Descriptig.D Rev..

Page DJscriotinD Esrc 1 of 7 Att. 7 6

1 of 7 Att. 7 5

thru thicu 7 of 7 7 of '

1 of 5 Att. 12 2

1 of 5

.Ttt. 12 1

thru t:bru 5 of 5

?

A*

O 4

e

\\

/D HC-ECG 2 of 2 l

ECG 4

y 1.0.C CONTROL COPY #* 19 1 oe 2 HOPE CRENK EVENT CLASSIFICA*ctON GUIDE

() 6 5 TABLE OF CONTENTE l

s January 11,1991 l

_IEFTTOTIVE SECTIOl{

TITLE EE17.

PAGES

,Db'UIS T.O.C.

Table of Contents 10 2

Jan 11, 1991 Sig. 1-18 Section Identification / Signature Page 7

2 Jan 11, 1991 Sig. Att.

ECG Attachments / Signature Page 8

2 Jan 11, 1991 i..

Introduction 0

6 May 26, 1989 11.

Cross Reference - Event to Requirement 1

9 Jan II, 1991 111.

Cross Refcrence - Attachment to Events 4

-1 Jan 11, 1991 1.

REACTOR COOLAN7 LEAV. AGE /LOCA 1

1 Mar 2,

A990 2.

STEAM BREAK OR SRV FAILED OPEN O

2 May 26, 1989 f

3.

FAILURE TO SCRAM 0

1 May 26, 19'19

4.

LOSS OF DECAY HEAT REMOVAL 1

2 Jan 11, 1991 5.

FliF.L DAMAGE / DEGRADED CORE 2

2 Nov 17, 1989.

6 6.-

. FISSION PRODUCT BOUNDARY FAILURE 2

1 Mar 2,-1990 7.

RADIOLOGICAL RELEASES / OCCURRENCES 1

5 Jan 11, 1991 8.

HON-RADIOACTIVE LEAK / SPILL 1

2 Sept 15, 1989 (toxic gas, oil spill, hazmat) 9.

ELECTRICAL POWER FAILURE 2

2 Mar 2,

1990 10.

LO9S OF INTRUMENTS/ ALARMS / COMMUNICATIONS 1

-2 Jan 11, A991 11.

CONTROL ROOM EVACUATION 0

1

-May 26, 1989 12.

. QUAKE / STORMS (earthquake, vind, 0

6 May 26,-1989 floods,-etc) 13.

SITE HAZARDS 0-5 May 26, 1989

-(aircraft crash, missiles, explosions, etc.)

14.

FIRE 1

1 Sept 15, 1989

.15.

PERSONNEL EMERGENCIES / MEDICAL 1

2 Jan 11, 1991 16.

SECURITY EVENTS /FFD 3

3 July 27, 1990 17.

PUBLIC. INT". REST ITEMS 1

3 Sept 29, 1989-18.

TECH SPECS / PLANT STATUS CHANGES 4

5 Jan 11, 1991 HCGS-Rev. 10.

lJ

i ECG T.O.C I['

HOPE lCittEK Pg. 2 of 2 EVENT CLASSIFICATION GUIDE t

TABLE OF CONT 5NTS - (Continued)

January 11,.991 EFFECTIVE ATTACHMENT TITLE

REV, PAGES DATE 1.

Unusual, Event 4

10 July 27, 1990 2.

Alert 1

8 Mar 2,

1990

'3.

Site Area Emergency 1

8 Mar 2,

1990 4.-

General Emergency 1

10 Mar 2,

1990 5.

Reserved 6 '.

CM1 Ir.; (UE/A/SAE)_

6 6

Jan 11, 1991 7.

CM1 Log (GE)-

6 7

Jan 11, 1991 8.

CM2 Log-4 12 Oct 19, 199J 9.

Non-Emergency Notifications Reference 5

2 Oct 19, 1990 One Hour Report - NRC/ Region 1

July 27, 1990 10.

'-41 '.

One Hour Report - URC/ OPS (Security) 2 5

July 27, 1990-5 12.

One Hour Report - NRC/ OPS 2

5 Jan 11, 1991 13.

Reserv3d 14.

Four Hour Report - NRC/ OPS 2

5 July 27, 1990 15..

Four Hour Report - ELvironmental 2

5 July 27, 1990 16.

Four-Hour Rcport - Spill /Ha:n.at 1

6 July 27, 1990

'17.

Four Hour; Report Fatality / Medical 3

7 July 27, 1990 18. -

Four Hour Report - Transportation Accident 1

6 July 27, 1990

.19.

Twenty Four Hour Report - FFD 0

3 July 27, 1990

-- 2 0.

Twent, Four Hour Report - NRC/ OPS 2

5 July 27, 1990 H21.

Reportable Event - LACT /MOU 0

2 May 26, 1989 22.

Other/ Engineering 1

3 Mar 2,

1990 23.

Written Reports /LERS/Other 1

7 Apr 25, 1990' HCGS Rev. 10

.~...____.

~

f:

ECG Sig. 1-18 Pg. 1 of 2

' HOPE CREEK ftt EVENT CLASSIFICATION GUIDE SECTION SIGNATURE PAGES January 11, 1991 EFFECTIVE SECTION-TITLE BEM PAGES DATES i

1.

Introd,uction 0.

6 May 26, 1989 11.

Cross Reference-- Event to Requirement 1

9 Jan 11, 1991 111.

Cross Reference - Attachment to Events 4

1 Jan 11 ', 1991 1..

REACTOR-COOLANT LEAKAGE /LOCA 1

1 Mar 2,

1990 2.

STEAM BREAK OR SRV FAILED.OPEN O

2 May 26, 1989 3.-

FAILURE TO SCRAM 0

1

.May 26, 1989 4.-

LOSS OF DECAY HEAT REMOVAL 1

2 Jan 11, 1991 5.-

FUEL DAMAGE / DEGRADED CORE 2

2 Nov 17, 1989 6.

FISSION PRODUCT BOUNDARY FAILURE 2

1 Mar 2,

1990 7.

RADIOLOGICAL RELEASES / OCCURRENCES 1

5 Jan 11, 1991 8.

NON-RADIOACTIVE LEAK / SPILL 1

2 Sept 15, 1989 (toxic gas, oil-spill, hazmat)

9..

_ ELECTRICAL POWER FAILURE 2

2 Mar 2,

1990 10.

LOSS OF INTRUMENTS/ ALARMS / COMMUNICATIONS 1

2 Jan 11, 1991-11.

CONTROL-ROOM EVACUATION O

1 May 26, 1989 12.

QU?.KE/ STORMS (earthquake, wind,-floods,

-0 6

May 26, 1989 etc)'

13.

SITE HAZARDS 0

5 May

-26, 1989 f

(aircraft crash, missiles, explosions, etc.)

114.

FIRE, 0

1

-May 26, 1989 15.

PERSONNEL EMERGENCIES / MEDICAL 1

2 Jan 11, 1991

-16.

SECURITY EVENTS /FFD 3

3 July 27, 1990

(

17.

PUBLIC-INTEREST ITEMS 1

3 Sept 29, 1989 18.

TECH SPECS / PLANT STATUS CHANGES 4

5 Jan 11, 1991

.HCGS Rev. 7

~

~

ECG O

t SECTIONS i-18 Pg. 2 of 2 SIGNATURE PAGE j

Prepared ~By:

b <ftY D 5 O (If Editorial Revisions Only, Last Approved Revision)

.Date i

Reviewed By:-

G. lAs-%/

n t o-4 o 6tation Qualified Reviewer Date Significant Safety Issue f

l2 ~bl SD e

e L

Depart Managar j

Date

'Revi'ewed By:

be um R

h-7 s-%

Emergency Prepdfed/tess Manager Date O

Reviewed By:

  1. J f 4 General Manager - Quality Assurance /Safaty Review Datt (If Applicable)

SORC Review and Station, Approvals L

plp 9} -OG 2.-

E, Mtg..No.

Salem Chairman Mtg._No.

-Hope Croek Chairman

//$/9l Date Date

)

NI ft b!/ V General Manager -- Salem Ge nager - Hope Cre k

~

Date

/QAte O

HCGS Rev. 7 I

- + -.

__~.,,e..

--+i---

r

.g L

ECG Sig. Att.

L HOPE CREEK Pg. 1 of 2 L

EVENT CLASSIFICATION GUIDE ATTACHMENTS SIGNATURE PAGE Janutry 11, 1991 l-l EFFECTIVE L

h,TTACHMENT TITLE REV,.

PAGES DATE 1.

Unusual Event 4

10 July 27, 1990

(

'2.

Alert 1

8 Mar 2,

1990 3.

Site Area Emergency 1

8 Mar 2,

1990 4

4.

General Emergency 1

10 Mar 2,

1990 5.

Reserved 6.

CM1 Log (UE/A/SAE) 6 6

Jan 11, 1991 7.

CM1 Log (GE) 6 7

Jan 11, 1991 8.

CM2 Log 4

12 Oct 19, 1990 9.

Non-Emergency Notification 5

2 Oct 19, 1990 3(eference

} 10.

One Hour Report - NRC/ Region 1

5 July 27, 1990 11.

One Hour Report - NRC/ OPS 2

5 July 27, 1990 (Security)

L 12.

One Hour Report - NRC/ OPS 2

5 Jan 11, 1991

'13.

Reserved lI 14.

Four-Hour Report - NRC/ OPS 2

5 July 27, 1990 15.

Four Hour Report - Environmental 2

5 July 27, 1990

'16.

Four Hour Report - Spill /Hazmat-1 6

July 27, 1990 17' Four Hour-Report - Fatality / Medical 3

7 July 27,_1990

-18.

Four Hour Report - Transportation 1

6 July 27, 1990 h

Accident 119.

Twenty Four Hour Report - FFD 0

3 July 27, 1990 2 0. -

Twenty Four Hour Report - NRC/ OPS-2 5

July 27, 1990 21.

Reportable Event - LACT /MOU 0-2 May 26, 1989 Other/ Engineering 1

3 Mar 2,

1990.

0 22.

l l

23.

Written Reports /LERS/Other 1

7 Apr 25, 1990 HCGS Rev. 8 L

4.

q

)

-..9

.ECG i

ATT. 1-23 Pg. 2 of 2 1

SIGNATURE PAGE Prepared By:

1Qw h6 11-2 7 9D (If tditorial Revisions Only, Last Approved Revision)

Date

' Reviewed By:

Jl4 5

[',

Station Qualified Reviewer Date significant safety Issue

(.) Yes (') no

- Reviewed By:

41A Department Manager Date m

Reviewed By:-

_-_--.C~ T.D.

nA r/w Emergency Preparedness Manager Oate Reviewed By:

d iA General Manager - -Qual'ity Assurance / Safety Review Date

-(If Applicable)

SORC. Review and Station Approvals MA dlA

- Mtg. No.

Salem: Chairman.

Mtg. No.

Hope" Creek Chairman Date Date N W M

General Manager - Salem General Manager - Hope Creek Date Date i

n HCGS Rev. 8

,m

- =... -

I o

ECG

'Section'11 Pg. 1 of 9 HOPE CREEK-EVENT CLASSIFICATION CROSS REFERENCE l

EVENTETO REQUIREMENT DOCUMENT

\\

SECTION ii NOTE: This-section is not to be used for Event Classification.

Refer to Sections 1 thru 18.

Initiatina tvent/ Condition Reference

  • 1.

Reactor Coolant Leakage Rate /LOCA A.

Exceeding reactor coolant leak rate technical UES specification B.

Reactor coolant leak rate greater than 50gpm AL5 C.

Loss of coolant accident greater than makeup SA1 capacity D.

' Loss of coolant accident with failure of ECCS GE6b,c systems to perform, or with potential contain-ment failure.

2.

Steam Break or Safety / Relief Valve Failed Open

()

A.

Failure of a safety / relief valve to close UE6 following a reduction of pressure B.

Steam line break outside drywell AL4 C.

Steam line break outside drywell with con-SA4 tinuing leakage 3.

Failure to Scram A.-

Failure of the reactor protection system to AL11 automatically initiate and complete a scram which brings the reactor subcritical.

B.

Conditions requiring operation of the standby SA9

' liquid control systen with subsequent failure to reduce power (continued power generation but no core damage evident).

  • Unless otherwise identified, references are as outlined in Appendix I, NUREG 0654.

Only initiating Event / Condition references for Emergency-Classes UE - GE are' listed here.

Non-emergency references

[

-are included in the sections themselves.

ll

<k

'HCGS Rev. 1 L

p h

ECG

.Section il l

~

Pg. 2 of 9 CROSS REFERENCE EVENT / REQUIREMENT (continued)

NOTE: This section is not to be used for Event Classification.

Refer to Sections 1 thru 18.

Initiating Event / Condition Reference

  • C.

Conditions requiring operation of the stand-GE6a by liquid control system with subsequent failure to reduce power (containment failure jmminent with significant core damage).

4.

Loss of Decay Heat Removal A.

Complete loas of any decay heat removal AL9 capabililty needed for plant cold shutdown.

AL10 B.

Complete loss o: any decay heat removal SA8 capability needed for plant hot shutdown.

C.

Continued loss of all conventional means of decay GE6d heat removal with core damage and containment failure possible if cooling not restored.

5.

. Fuel-Damage / Degraded Core A.

Fuel damage indications UE3a,b Severe loss of fuel cladding ALla,b B.

C.

Degraded core with indication of possible loss SA2 of coolable geometry D.

Fuel handling accident with radiological release AL12 to the Reactor Building from. irradiated fuel.

E.

Major irradiated-fuel damage with radiological SA10 release exceeding-(or projected to exceed) the threshold dose rates at the MEA for a Site Area Emergency.

6.

Fission Product Boundary Failures (2/3)

A.

Severe' loss of fuel _ cladding

'GE2 B.

Loss of RPV integrity GE2 C.

Loss of primary containment GE2 7.

Radiological Releases l

A.

Contaminated injured person transported from UE16 the site to an offsite medical facility.

O HCGS Rev. 1

1..

_. _... = -_ _

i 7

ECG

$b Section 11

_(,)_

Pg. 3 of 9 NOTE: This section is not to be used for Event Classification.

Refer to sections 1 thru 18.

Initiatina Event / Condition Reference 7.

Radi'ological Releases / Occurrences (cont'd)

B.

Loss, theft or diversion of any UE12

'}

special-nuclear material onsite 10CFR70.52 C.

Increase in measured or calculated A6 dose rates (mR/hr) or airborne activity levels by a factor of 2 1000 times

.(indication of degradation in control of radioactive materials)

D.

-. Liquid release that exceeds T/S limits UE2 for 1 15 minutes.

E.

Gaseous release that exceeds T/S limits.

UE2 F.

Gaseous release that exceeds 10 A15 times T/S limits.

G.

Dose Rate at Minimum Exclusion Area SAE13 (MEA - 0.56 miles from the affected unit) greater than or equal to 500 mR/hr Whole Body (WB) or 2500 mR/hr Thyroid.

EH.

Dose Rate at Minimum Exclusion Area GE1 (MEA) greater than or equal to 1R/hr WB or 5 R/hr thyroid.

8.

Nonradioactive Leak / Spill A.

Toxic or flammable-gas release UE14d

.that threatens plant personnel.

1B.

Toxic or flammable gas release A18d entering plant ~ structures.

C.

Toxic ~or flammable gas release SAE16c entering into vital areas where safe plant' operation is compromised.

HCGS Rev. 1 1

1

..l.,,

i' ECG Section 11 Pg. 4 of 9 NOTE:

-This section is not to be used for Event Classification.

Refer to sections 1 thru 18.

Initiating Event / Condition Reference 9.

Electrical / Power Failure A'.

Loss'of A.C.

Power capability UE7 that requires Unit Shutdown B.

Loss of all offsite power UE7 C.-Loss of all offsite power and A7 loss of most onsite A.C.

Power D.. Loss of all offsite power and SAE6 loss of,most onsite A.C.

Power for an extended period of time.

E. Total loss of.all.A.C. Power SAE6 F.

Loss of all vital onsite D.C.

A8 Power rY G.

Loss of all-vital onsite D.C.

SAE7 L

l Power for > 15 minutes.

-10.

Loss of Instruments / Alarms /

Communications.

.a A.

Indications or alarms on UE11 process or effluent parameters not functional in Control Room.

B.

Loss of:all or most OHAs A14 C.

Loss of all-or most OHAs SAE12 and plant transient

. initiated or in progress 11.

Control Room Evacuation

~

A.-Evacuation of Control Room A20 4 ::

anticipated or required.

1 B. Evacuation of Control. Room SAE18 completed with control of S/D systems not established at the

' r '-

-Remote S/D Panel within 15 minutes.

lO HCGS Rev. 1 l

m.

m-m.

u 44 p,-

t' ECG Section 11 Pg.'5'of 9

/^).

NOTE:

This section is not to be used for Event

+

.Q/g Classification.

Refer to sections 1 thru 18.

Initiating Event / Condition Reference 12.

Earthquake / Severe Weather A.

Earthquake / seismic event felt UE13a in-plant or instrument detected i

B. Earthquake / seismic event A17a

-greater than Operating

. Basis Earthquake (OBE)

'C. Earthquake / seismic event SAE15a gnaater than. Design Basis-Earthquake (DBE)-

' D -. Flood: -Water level in river UE13b high E.

Flood:

Water. level in river A17b high;.near design basis F.

Flood:

Water level in river SAE15b hight greater than design basis G.

Water level'^1n river low UE13b H. Water: level in river low near A17b design basis I. Water level in river lower SAE15b than design basis J. Hurricane / unusual' wind indicated UE13d by met tower instrumentation K. Hurricane / unusual wind indicated' A17d byLmet tower instrumentation-near design basis L. Hurricane / unusual wind indicated SAE15c by met tower instrumentation-greater' than design basis M. Tornado funnel-observed, within MEA UE13c HCGS Rev. 1

~...

- - ~. - -. - -.. -

f ECG Section il Pg. 6 of 9 NOTE:

This section is not to be used for Event Classification.

Refer to sections 1 thru 18.

' Initiating Event / Condition Reference 12.

, Earthquake / Severe Weather (cont #d)

N. Tornado funnel. observed within A17c the' protected area O.

Tornado funnel observed, SAE5c affecting plant structures P.

Any major internal or external GE7 event substantially beyond design basis.

13. Site Hazards (explosions, crashes, etc.)

A.

Aircraft unusual activity over UE14a Facility or crash within the MEA 1-B. Aircraft crash within the A18a

\\ '#

Protected Area C.-Aircraft crash affecting SAE16a Plant Structures

'D.

Turbine' rotating component UE14e failure E. Turbine rotating component A18e

. failure causing casing penetration F. Missile impact onsite A18b from any_ source within the Protected Area.

G. Missile-impact onsite SAE16b 4

damaging a Plant Struc-ture l -.

O HCGS-Rev. 1

a y

ECG Section 11 Pg. 7 of 9

\\~ /

NOTE:

This section is not to be used for event Classification.

Refer to sections 1 thru 18.

Initiating Event / Condition Reference 13.

Site Hazards (explosions, crashes, etc.) (cont'd)

~H. Unplanned explosion af-UE14c fecting plant operations I. Unplanned explosion A18c potentially compromising the function of one or more safety systems or normal operation of the plant J. Unplanned explosion com-SAE16b promising the function of one or more safety sytems K. Any major event substantially GE7 beyond design basis.

14.

Fire

[ ')

A.

Fire lasting > 10 min that UE10 affects plant operations B.

Fire potentially compromis-A13 ing the function of one or-more safety systems C.-Fire compromising the SAE11 function of one or more safety systems D.

Any major fire (substantially GE7 beyond design basis)-which could cause massive common damage to safety systems.

15.

Personnel Emergencies A.

Contaminated injured person UE16 transported from site to an offsite medical facility.

()i HCGS Rev. 1

f.

't.

ECG Section-il Pg. 8 of 9 O.

NOTE:

This section is not to be used for Event

. Classification.

Refer to sections 1-thru 18.

. Initiating Event / Condition Reference 16.' Security Events A.

Loss, theft or diversion UE12

~

of any special nuclear 10CFR70.52 material onsite B.

Substantiated threat, UE12 attempted entry or dis-covery of a suspected destructive device or evidence of.a malicious act.

C.

Security Alert UE12 D.

Substantiated threat, A16 attempted entry or dis-covery of a suspected destructive device or evidence of a malicious act with a Security Alert declared.

E.~ Ongoing security compromise A16 F.

Ongoing security compromise SAE14 with imminent loss of

. physical control of the plant.

G. Ongoing security compromise GE3 with in the loss of physical control of the plant.

17. Public Interest Items A.

Any plant conditions exist UE15 that warrant increased awareness on the part of STATE / LOCAL authori-ties.

B. Any plant conditions exist A19 that-warrant precautionary standby of STATE / Local authorities.

HCGS Rev. 1

s, R

J:

j 1

ECG

=

Section 11 f ";...

Pg. 9 of.9 I

NOTE:

This'section11s not to be used for Event Classification.

Refer to sections 11thru 18.

In'itiatina Event / Condition Reference C.

Any-' plant chnditions exist SAE17

,Lthat warrant precautionary f

activation of STATE / LOCAL authorities and notification to the general public.

18. Tech.-Specs / Plant Status Changes A.

Unit shutdown.to comply UE3, UE4, UE5, with the following T/S UE7, UE8 LCO's:

-1.:' Reactor Coolant System (RCS) leakage 2.; Specific activity of the Primary coolant 3.

A.C.' Electrical power sources

))

4. RCS pressure / temperature limits
5. Primary Containment Integrity 4

B.' Exceeding any T/S Safety UE4 Limit Tech. Spec 2.1 and-6.7.1 C.. Manual or automatic ECCS UE1 actuation with discharge to the vessel.

D.

Liquid release that exceeds UE2

- T/S limits for 2 15 luins.

-i E.

Gaseous release that exceeds UE2 T/S limits.

I HCGS Rev. 1

m._._

.m

~.

a__,

e.

ECG Sec. iii Pg. 1 of 1

~

O.

CPOSS REFERENCE ATTACHMENTS TO EVENTS

~

SECTION iii ATTACHMENT EVENT / INITIATING CONDITION

-1 1A, 2A, 5A, 7A, 7B, 7D, 7E, 8A, 9A, 9B, 10A, 12A, 12D, 12G, 12J, 12M, 13A, 13D, 13H, 14A, 15A, 16A,-16B, 16C, 17A, 18A, 18B, 18C, 18D, 18E 2

1D, 2B, 3A, 4A, SB, SD, 7C, 7F, 8B, 9C, 9F,

?,

10B, 11A, 12B, 12E, 12H, 12K, 12N, 13B, 13E, 13F, 13I, 14B, 16D, 16E-17B 3

1C, 2C, 3B, 4B, SC,-SE, 7G, 8C, 9D, 9E, 9G, 10C, 11B,'12C, 12F, 12I, 12L, 120, 13C, 13G, 13J, 14C, 16F, 17C

.t 4

1D, 3C, 4C, 6,

7H, 12P,_13K, 14D, 16G 10 7I,.7L, 7M 11 7I, 7K, 16H

'12 7N (2,4,6), 8D, 100, 15B, 17D, 18F, 18G, 18H 18I, 18J, 18K 14 7N (1,3,5), 15C, 17E, 18L, 18M, 18N, 180 15 17F, 17G

-16 8D, 8E 15D, 15E 18 7J 19 16I

.20 18P, 18Q 21 17H 22 18R, 18S, 18T 4

HCGS Rev. 4

o

,a

\\

\\%.s)

\\v)

'a

\\

ECG LOSS OF DECAY HEAT REMOVAL 4"f", *2 SECTION 4 A. ContP!.ETE LOSS OF ANY DECAY HEAT REMOYAL CAPABIUTY NEEDED FOR PLANT C_Ot3 SHUTDOWN INITIAT!NG CONDITIONS V~

w w

w Loss of A!temate Shutcoon SNSS determines that bdD

$NSS determines that beh Cooling copobEty, os RHR S/D Cochng loops A &

SACS subsystems are f

indicoted by:

8 ore not avoilable.

not ovoilable Alt (14) Sofety Relief Volves l

ore inoperable (i.e.. =ill not l

l open monuopy) l I

l l

AND AND AND AND Reoctor steam dome in OPERATIONAL in OPERA % SAL in OPERATIONAL 1

pressure 2 S0 psig.

CONDITON 4 or S CONP'.40N 3 CONDiTON 1 OR 2 EALS l THEN THEN l

AND AF D l

Heat losses to ambient are Tecnnical Specification 14 9.1 Mi sufficient to maintain Action Stctement c. connet OPERATOful CONDIT0N 4 be compfed with THEN l

I Technical Specification 3.4 9 2 l

Action Stctement b. connet be compted with.

l THEN g Continued g

On Pg. 2 l

V L_

REFER TO REFER TO REFER TO NOTiflCAT10N/

ATTACHW{NT 2 ATTACbMENT 2 ATTACHWENT 2 REPORTING ALERT AlpT AdRT HCGS REV. 1

~

r

.. t

~

q ECG LOSS OF: DECAY. HEAT REMOVAL y?'i",]

SECTION 4 IN!TIATING B. COMP 1.ETE thSS OF ANY DECAY EEAT REMOYAL CAPABluTY NEEDED FOR FIANT BOT SHUTDOWN CONDIT!ONS C. CONTLNUED IDSS OF All CONVENTIONAL MEANS OF

~ i

. DECAY BEAT REMOVA1. TITH CORE DAMACE ' -

AND CONTAINMENT FAILURE POSSIBLE IF C00uNG NOT RESTORED.'

p.__ Contmued L

F From Pg.1 gg

,g g

j g

Complete loss of.

Comotete 3 of..

Complete loss of g

l steem domOS coccbEty Circule'ino Oter Swstea'l operobeldy, mokeuo end cooline cofmbilitw o

os enocoted by tiMg as edkoted by-os inocated Dy g!l of i

l of the fonoey the fo5owing:

{

1 1

Alt MSVs fait to open when not running when required.

.HPCI inoperable and I

aequired RCIC inopercble, and g

OR Att (14) SRV'S inoperable l

All Turbine Bypass Valves THEN AND

  • fail to open when required Complete loss of the 4

i Feed and Condensate System THEN THEN i

^

l

)

  1. 4D t

EALS l Contmued toss of decoy beat removal cepob&ty os in6 coted by e of the foo.ing..

y Ru Press > 1037 psig and increosing CR l

Supp. Chamber Press Temp. & Level g

Are (JN$AFE per the Heat g

Copacity Limit Curves (EOP-102) l OR Ory.es Temperature ec<iaot l

be maintained below 340 F i

I MD MD SNSS/EDO determines that SNSS/E00 determines that:

l AN operationally sound rnethods

. Venting the Primary of decoy heat removat are Contemeneet to reduce ond meintain pressure j

E

9 l

Stondby injection Subsystems I

(Fire Water or Service Water)

.j ore required for RPV Level

.yg{g 5

e l

l Restoraten l

THEN L_

l HCGS REFER TO REFER TO NOTiftCATION/

ATTAcmsENT 3 ATTAC>anENT a REV. 1 Slft AREA tutacto ctNERAL (W(RC(C

]

REPORTLNG l

(,s i -

3 6

1

~

ECG RADIOLOGICAL RELEASES / 0CCURRENCES 4 '?" 's l SECTION 7

=

NOTE: Action levels fested are for valid RuS cnonnet indications.

~ The votid;ty of the indacation should be confa^ med by somp's onofysis or other eneons os necessory.

a a

A. C0!ffAMINATED INJURED B. IDSS. THEFT OR DIVERSION -

C. INCREASE IN MEASURED OR PERSON TRANSPokTED.

OF ANY SPECIAL NUC11AR CALCU1ATED DOSE RATES OR FROM THE SITE TO AN MATER!AL (SRM) ONSTTE AIRBORNE ACTIVITY tIVELS OFFSITE MEDICAL

- (MR/HR) BY A FACTOR OF NTIAilNG FACILITY.

> 1000 TIMES (INDICATION OF CONDITIONS DECRADATION IN CONTROL OF RADICACTIVE MATERIAtS)

I-r r

IF 1

4 Dose Rates or Aatporne Transportation of o Any loss, theft or Activity Levels have -

]

l contominated individual diversion of any SNM unenpectedty increased from the site to on (Wen or suspected)

> 1000 times normal I

offsite medr14 facility at this facibty (measured or calculated) by any of the follu*ing:

THEN THEN Radioiegical survey i

g results t

OR l

Votid RMS readings i

EALS _l

.g i

In the judgement of the l

$NSS/EDO. o toss of I

control of radioactive materiots has occurred se l

Refer to Section 16 for THEN I

escoloting conditions of security retoted events.

I I

L_ _

l REFER TO REFER TO REFER TO NOTFOTON/

ATTACHWCNT 1 ATTACHMENT I AITA& MENT 2 REPORTING unusual EvtNI UNUSUAL EVENT.

ALLAT l

MCGS REV. 1 I

l

d

(,

..~

i ECG' l

R'ADIOLOGICAL RELEASES / ' OCCURRENCES 4 ?"/si SECTION 7 NOTE: ActM levels listed ore for valid RuS chenr4 indcotss i

7 AND/OR confamed sample anotysis.

i D. IJQf!!D Inrf Fa 4E THAT EICEEDS E. G S as1FaqE THAT EECEZDS F. GAS _ Igg mFKE THAT EXCEEDS -

INITIATING T/S UMITS FOR 215 MINS.

S UNITS.

TEN TIMES T/S UMITS.

CONDIT10NS f

f f

f

.T l

8!! of the following are Bob of the foNowing are Dose ossessment projected Sam of the fogowing are Dose ossessment projected I

includet included-dose rates at or beyond the included; dose rates et or twyond the uEA equal or eveeet uEA equal or encese -

2.90E-02 mR/br wnote Body 2.90E-01 mR/hr whole Body f

l

1. Liquid release in
1. Vclid HCH 08cm L valid HICH otom progress recerved from ocy of the tweived fro n gay of the l

following RuS cnonnes:

OR following RuS chonnees:

OR

2. valia HICH olarm NPV EFFLUENT
  • N#

860E-02 mR/hr Thyrdd 860E-01 mR/hr Th 'dd SPV EFTLUENT 7

receWd from. LIQUID SPV EFFLUENT RELEASE CONCENTRATION FRVS EFFLUENT FRVS EFFLUENT LissTS EXCEEDED alorm l

2. Anotysis of weiid RMS
2. Anolysis of vesid RuS 4
3. Release isolor;on teosngs indicates o TOTAL readmns Indicates o TOTAL I

fcils plant reecse rcte (SPV +

plant reicose rate (SPV +

NPV + FRVS) overage vo6e

- NPV + FRYS) overage value

4. Sompte onelysis of tnot equois or etceeds-that equois or exceeds:

("8 1.20E+4 pCi/sec NG 1.20E+5 pG/sec NG ~

d entrh EALS l in e cess of TOCrR 20 oR OR l

gi= 816*

. i.70E+i pc/sec :-tai i.70E+2,Ci/.ec i-isi g

os determined by acy one es determined by ces one Ii l

cf the fonoeing metnods:

of the following enetnods:

AND JL RW11

.10 minute A. RM11 - 10 minute l

overaged values.

overaged values.

Release hos lasted or

' S. Rus/VAX - 15 minute B, Rus/VAx - 15 rninute l

is espected to ast for overaged values.

overaged vofues.

e 2 1S mins.

I

'I M Hett; Helg; I

Trus information should be Ytus information should be j

provided by the Shift Rod provided by the Shift Red p

l Peo Tech on Page 2 of Pro Tech on Page 2 of x

IHEN SSCL THEN SSCL -

t WRM ERM WRM

)

NOTTICATION/

ATTACHWENT I ATTACbHENT 1 ATTAChu[NT 2 REPORTING unusual tytNT tNusuAL EvtNT AERT 1

HCGS l

REV. 1

U, b,

U m

ECG RADIOLOGICAL RELEASES / OCCURRENCES TT"('s SECTION 7 NOTO Action less Ested are for vcGd RuS channel in6 cot.ons The voird*y of the indcotes shou'd be confirmed by sempie anctysis or other rneens as recessary.

C. DOSE RATE AT WINIMUM EICLUSION AREA (MEA-0.56 WILES FROW ATTECTED UNIT)

H. DOSE RATE AT MINIMtJM EXCLUSION AREA (MEA-0.56 AILES TROM AFFECTED UNIT)

WT!NG CREATER THAN OR EQUAL TO 500 mR/hr TH012 BODY (TB) OR 2500 mR/hr THYROID CREATER THAN OR EQUAL TO 1000 mR/hr TE012 BODY (TB) ce 5000 mR/hr THYROID l

LONDITIONS tF IF IF IF IF IF I

Fie4d team at or beyond the WEA 02t,t) of the following-M of the foRomirg' Field team at or beyond the WEA 22Lh of the following-Ajj of the foRomeg

}

I meosures-moosures:

i

1. Field team meosurements
1. Field team meosurements
1. F;eid team measurements
1. Field team measurements f

ll WB Dose Retes are rg ovoitable at or ore c21 ovoilable et or wB Dose Rotes are not ovoilable at or are not ovoilable at or

~

beyond tne wy no the O beyond the uEA beyond the WEA 2 50 mR/nr for 2 30 mm y 3 973, CR AND AND AND AND l.

2. Calculations based on EPP
2. Colculation of WB and/or U
2. Colculations based on EPP
2. Calculot.on of w9 and/or f

2 W d/N fw 2 3 6n i

g 309H. OR 602 ond using Tnyroid Commitment dose Thyrold Comm.tment Dose Rotes 309H. OR 602 and useg Thyroid Comm;t%nt dose

{.

octuo meteorolog; col coto rates based oft Emergency I

octuoi meteorciogkos data rates based,on Emergency (i-131 concentrations) s Thyroid Comen;trrent Dese Rates, have projected that et or Dose Projection proceNres have projected toot at or Dese Projecten procedures l

(F131 concentrot.ons) beyond the uEA have col been performed 5

beyond tne WEA be 021 been Perfor**d 2 250 mR/hr for 2 30 min WB Dose Retes AND WS Dose Retes AND (1.0E-7 pCi/cc)

3. Anol s;s of ysi d RMS l

2 500 mR/nr for 2 3 min

3. Anotysis of v2!id RMS 2 1 R/hr y

l readings indicates o TOTAL THEN reccings inceotes o TOTAL OR l

2 2500 mR/hr for 2 3 min E

plant refeose rate (SPV +

E plant reaeose rete (SN +

{1.0E-6 pCi/cc)

Thyroid Commitment Dose Rotes NPV + FINS) overage value Thyroid Commstmert Dese Rotes NPV + FRVS) everage value

'N "

'"0

inct e@ch or escee 2 5 R/hr 2 2500 mR/hr for 2 3 man THEN (1.0E-6 pCi/cc) 5.38E+6 pCi/sec NG (2 0E-6 pCi/cc) 1.02E+7 #Ci/sec NG OR CR

(

THEN 6.05E + 3 Ci/sec i-131 THEN 1.21E+4 gCi/see t-131 es determined by 0c3 one os determined by as one NOYD Fo.d Comm;tmeat Dose Ro+es of the fo!!caing metnods-of the foltoneg met %ds:

ore Dose Committed to the A. RM11 - 10 minute A. Ru11 - 10 minute l

Thyroid per mhototion hour.

overoged votees overaged values.

l 9 RMS/VAX - 15 minute

8. RMS/VAX - 15 minute overaged values.

overaged wolves.

THEN ThEN l

L_

REFER TO REFER TO NOTIFICATION /

ATTACl4WENT 3 ATTACHWENT 4 REPORIiNG

$;;E ARE4 Eu(RCENCY CIhERAL EutRCENCY hCGS REV. 1

b 4

ECG RADIOLOGICAL RELEASES / OCCURRENCES MS?"e d 7

SECTION 7 L LOSS AND INVESTICATION OF THE L ACCIDENT OCCliRING K. thSS OR THEFT OF-I. RECEIPT OF SNM MATERIAL M. EXCESSIVE CONTAMINATION LOSS OF SPECIAL NUCLEAR MATERIAL DURING TRANSPORTATION IJCENSED MATERIAL IN

[10CFR73.27 (b)]

AND/OR RADIATION 1DEIS

- [10CFR73.27 (c)}

[lGCFR73.71 (a)] -

0F IJCENSED MATERIAL SUCH CIRCUMSTANCES ON A PACKAGE

[10CrR71.s (axiXe)]

THAT IT APPEARS TO

[10CTR20.205]

(49CFR171.tS]

THE IJCENSEE THAT A INiinNG SUBSTANTIAI. HAZARD -

MAY RESULT TO PERSONS CONDITIONS IN UNRESTRICTED AREAS

~

[10CTR20 402 (a)(I)]

IF IF IF IF IF -

IF i

Shipment of Speciot Results of o trace Accidents during the Conditions, as stated Receipt of shipment Receipt survey in6 cates l

Nuclear Material (SNM) investigation of a transportation of otieve, appear to esist of strategic Special '

that package rodiction/

that is lost

' lost or unoccounted radioactive material in the ement of

%cteor potenot (SNM) contominatien levers for Speciot Eclear

.hich are reported to the S EDO OR

'M "

'"C"d

CR l

uoteriet (SNM)

PSE&C as the sh;pper Shipment to end

1. One of the feelo ing-unaccounted for ofter shipment are received that involve (or yggy l

the estimated time potentially involve) f*Cpt of SNW by I

of arrivot demoge to the cargo.

the consigne, 22.000 dpm/100 cm2 THEN OR THEN THEN 200 mR/hr on contact j

l OR to mR/hr et 3 feet i

AND I

2. Package does not N.97C N_QJ1; EALS l vehicle t>reckdo.ns escolating conddions of 10CFR20.205 meet any cf the Refer to Section 16 for esclusions of -

or detoys enroute

[

rney also be reported secunty reloted events.

by the driver, but THEN l

ore not reportebre to the NRC unless on l

cccident is 'wtwobed which may have g

domoged the cargo.

l I

I I

L_ _

REFER TO -

REFER TO REFER TO REFER TO REFER TO REFER TO NOTIFICATION /

ATTACHWENT 10 ATTACHWENT 11 ATTACHWENT 19 ATTACHWENT 11 ATTACHW(NT 10 ATTACHWENT to REPORTING CNE HOUR REPORT ONE HOUR REPORT FOUR HOUR REPORT CNE HOUR REPORT ONE HOUR REPuri ONE HOUR REPORT HCGS REV. 1

~

y

.n i.

ECG.

RADIOLOGICAL ' RELEASES. / OCCURRENCES Ai"afs SECTION 7 N. AW INCIDENT OR EVENT INY0 LYING BYPRODUCT, SOURCE. OR SPECIAL NUC11AR MATERIAL CAUSLNG ANY OF TEE IlSTED REStTLTS. [10CFR20.403] '

PERSONNEL OVEREDOSLTE LOSS OF OPERATION DORAGE TO PROPERTY MTM

t. LNCIDENT
2. EVENT
3. INCIDENT.
4. EVENT S. LNCIDENT
8. EVENT '

W W

W W

1F LF CONDm0NS I-Receipt by on in6vidool of:

Receipt by on indvidual of:

Loss of 2 one coy Loss of 2 one Demoge to property Demoge to prope<+y l

we exposure 2 $ Rem or WB esposwe 2 2S Rem. or of operation working =eek of 2 $2.000.'

2 $200.000 (totol}

Skin exposure 2 30 Rom, or Skin exposure 2150 Rem, or operaten (totor) l Estremity esposure 2 75 Rem Entremety esposure 2 375 Rem THEN THEN THEN TiEN THEN THEN I

I I

I EALS l 1

i i

I I

I I

L __

REFER TO REFER TO REFER TO REFER TO REFER TO REFER TO gg7 g yggj ATTAChufMT 14 ATTACHWNT f2

' ATTACHWNT 14 AUACHutNT 12 ATTACHMENT 14 ATTACMIENT 82 REPORTING FOUR m REPORY CW HOUR REPCRT F%'N HOUR REPORT C M HOUR REPORT FOUR HOUR EPORT ONE N REPORT HCGS:

REV. 1

6...

^

4 4

1-SECTION 10

' LOSS OF INSTRUMENTATION / ANNUNCIATION /COMM,UNICATIONS EEtionio Pg; 1 - of 2; I.

a

' L L4DICATIONS OR AIARMS ON PROCESS

- B. IDS 9 0F MOST OR ALL C. IASS OF MOST OR ALL OR EFFLUENT PARAMETERS NOT ANNUNCIATION ANT 4NCIAT10M IFffil A -

- NTmTM FUNCTIONAL IN CONTROL 200M.

PIANT TRLNSIENT CON 0m0NS LNmATED/IN PROGRESS -

4 IF IF indicctes or atorms Loss of mst or ait on process or effluent OWd Anewmur. ors.

g porometers are not functional in Contro*

t l

Room AND 4

i SNSS judgement tte l

i gg safe operation of plant hos been hindered.

I l

Extent of lost function f

requires plant shutdown is i

THEN EALS l I

I v

.3 i

A plant transient is

[

NOTE:

iriteted or iri progress.

Refer to Section 100 l

--~

if shutdown M THEN require 1 -

I l

I

\\

I L_

MR TO

. RE @ TO M R TO NOTiflCATION/

ATTACHtfENT 1 ATTACHasENT 2 ATTACHieEMY 3 MTM UNttSUAL EvCMT ALERT SfE AREA ender 2MCT

- i-HCGS REv. t m.,__

i:.,,h u.

A-

-E--u,-

-h

-]

"}]

.,A _

j;;

i iCC '

SECTION 10 LOSS OF INSTRUMENTATION / ANNUNCIATION / COMMUNICATIONS stCuow io Pg. 2 of 2 ~

i-l l

i D. MAJOR IDSS OF EMERGENCY AssrSSMElff CAPA9EJrY.

Onstre BesPO!sr CAPABEUTY. OE

. !NITMTWG COMktfNICATIONS CAPAB!UTY CONDITIONS

[10CFRSO.72 (b)(1)(v)]

{~

s SNS$/EDO judges that o -

l-major loss of nar of the r

i folloing hos occurred:

' (escluditwJ scheduled j

i mointenance er os part.

l.

of a preplanned test)

  • Errergency Not:fcetion I

System (ENS).

.g e Emergency Telephone I

System. (NETS) l Q[g g e Offsite sirens for >1 hour.

i i

e Emergency Responsa 4

Focilities.

. SPOS or CRIOS for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

e M Weteorological.dcto for

> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

. Other Control Room.

ind' ations or plant c

l monitors necessory for occident essessment I

THEN l

I 4

I.

1 L_

NOTflCATION/

m 12 REPORTING M w KPORT

+

HCGS REV. '1 l

.s.

=

y,

(

-y, ECG SECTION 15 PERSONNEL EMERGENCIES gcurgis INJURIES / OVEREXPOSURES A. CONTAMINATED INJtl RED PERSON CONDITIONS TRANSPORTED FROM THE Sir! TO AN OFFStrE MEDICAL FAGUTY.

F'-

r I

  • J,2%"dL I

"C?J' L'T&,

I THEN I

l l

EALS l 1

I I

I l

l I

I I

L_

l NOTiflCATION/

, E] (TO REPORTING UNUSUAL EvtNT p{y, j

y..

.I L,:

ECC' y

SECTION 15 PERSONNEL EMERGENCIES secta isJ :

Pg., 2 of-2.:

INJURIES / OVEREXPOSURES~

INITIATING B. ANY SIGNIFICANY C. ANY Pelt 90NNEL D. SERSOUS INJURY E. ' TATALITf f

CONDITIONS PEstSONNEL WEREIPOSURE M N IPOS M

[10CFM72 (bX2Xd)]

. [tOCFItSO,72 (bX2Xd))

[tocrit20.403 (ayaij

[tocrit20.403 (bXt F-ir ir ir ir l Any individues receives exposwe Any individuct receives exposure Any sesus Wury %s 3,y,,,,,;,7 p,,,,,,,,,

==cee6ng tne foo.ing Ernite exceeding tne sono.ing amts-occu,r'*d " -ste c4 _ I

  • 9 esposure 2 25 Rem. or.

WB esposure 2 $ Rom, or bmergency Response 3 4 Entrem;ty exposure 2 375 Rem Entremity exposure 2 75 Rem i Skin exposure 2150 Rem. or Sidn esposure 2 30 Rem. or Team secoer. I THEN THEN i I t

i j

EALS l c} I l 'i I I I i i l i l l i 1-l. l L_ i ' l ArtAcatur 12 j REFER TO l REFER 70 t REFER TO NOT m iu / f2fACmEN1 14 ATTACtekNT 17 'HCGS-lTOURmEPORY gj: nEPORT!NG j ONE N KPORT 2%R m E. PORT i F i . ~ k t- -r --=--- m

J :] q : _ f.. 7 t ~~ J :g ( s. T;.. 7, I g ECr TECHNICAL SPECIFICATION / PLANT STATUS CHANGES sECnoN is Pg. 1 of 5 SECTION 18 A. !! NIT SdUTDOWN INITIATED TO COMPLY WIT!! THE FOUhw1NC TCCff. SPEC. If01i: NT!AT!NG

t. REACTOR C00flaNT
2. SPECIFIC ACTTVPY OF
3. A.C. EIICTRICAL.
4. REACTOR Cf'01)LNT
5. PRIMARY CONTAINWENT CONDm0NS SYSTEM FFAYACE THE PRIMARY C00!JLNT POWER SOURCES SYSTEM PRESSURE /

INTECRITY TEMPuATURE LIMITS If !f If If If l tMt shutdown is t,ht shutdown is Urut snutdown is Unit eutdown :s Ur.1 shutdown is l 'rstacted es o result inithted as a result initicted es a result l Wt,oted as o resott irst;oted es o result e of exceed.nq eny of of escoeding cny of of exceeong any of of exceedse ony of of anceeding ony of l rne fonowsg T/S the todowing T/S the fo!!owing T/S the fc. owing T/S tne fclosing T/S Acton Steements-Act.on Staternents-Acton St:#ements Acton Statemeets: Actum Sectements: l A. Any Presue T/S LCO 3 4 5 T/S LOO 3 8 1.1 T/S LOO 3 4 * ' I T/S LCO 3 61.1 Boundary Leagoge, T/S LCO 3 8.11 l e g.. a non-.sosebie 3 fou!t in on RCS g cornponent. pipe THEN THEN DTF THEN I wen. or pressure i EALS vesset l I 1 B. 5 gom or more t)rdoentdied Leckage. l C. 25 gpm or more l Identified Lackage everage over any l 24-nour period. T/S LCO 3.4.3 2 j l THEN l tLTI: HCII; i MCII: NQII: prior to efess4f.ceten for prior to class 4 cation for Refer to ECG SECTION 9 Refer to ECG SECTCN 6 Refer to ECG SECT:0N 1 Refer to ECC SECTION $ prior to classification for prior to class 4;cetsen for poss.ble esccksting poss; ole esconoting possde eses!cteg l poss.bse escolating conditions. condsons. cordtione conctions. Ii i t_ _ ((TO, NOTlflCATON/ j c USUAL EVENT 4 REPORING HCOS REV. 4

O .. O.. ~ J' .l, $CG TECHNICAL SPECIFICATION / PLANT STATUS-CH,ANGES stCum is. SECTION 18 Pg; 2 of 5 B. EICEEDING ANY T/S SAFETY C. MANUAL 02 AlfTOW4T!c ' D. IJet.9 Brf ra*IE TilAT ZICE DS E. REI. EASE THAT EXCEEDS ' F. THE INITIATION OF ANY i r UM!T ECCS ACTUATION IIDi T/S UMITS FOR 215 MINS. LIMITS. PLET SitUTDOWN l REQUIRED BY THE . g 7gg DISOfAROE TO THE VESSEL TECl!NICAL SPECIFICAT10*JS. CONDITIONS (10CERSO.72 (b){t)(1)(A)] . incfudes-F- r r r e r r Exceeding any T/S ECCS ectivation, manual or fil of the tohowing are - Ekt.b of the following are cose essessment projected t> nit shutdo.n is irutiote! Safety Lims automatic. Ses occurred as included: incteded dose rates et or beyond the to compty eith Technicot MEA equoi or exceed: Specificatior.s cther than f indicated t:v:

1. Vdid HGH olarm 2 90E-02 mR/hr whote Body
    • ' M # '89W

,1, Liquid release in in EAL 18A or 1 7/S 2.13 Discharge to vesse*,s progress nee =ed from gicy of the t wenfieS by control fc% RuS cnonnefs-OR T}Q consoe indicoten

2. Vol;d HO4 clarm NPV EFTLUENT 860E-02 mR/hr Thyroid T/S 2.1.4 (no., volve posEons.

rece;wed from, UOut0 SPV EFTLUENT tong sewels, etc.) RCdASE CONCENTRATION FRVS EFFLUENT UulTS EXCEEDED clorm l ' THM ' 2.. Anotysis of valid RMS ,3. Reteose isolation readings ind. cates o TOTAL I a 'a (Sav +

    • a' raa'S) overage value EALS NPV + FRV JWD
4. Sample onelysis of that equats or exceeds:

L2CE+4 W/sec NG T.S.3.51 Action Statement ' acot s entration

g. hos been entered

- in encess of 10CFR 20. OR APP'"dI" 0 -

  • E 130E+1 pCl/see t-131 l

column B wolues THG es determined by ccx one l of the fosso.ing methods: I AND A RW11 - 10 miauta overaged votues. Release hos lasted or B. RMS/VAX - 13 rninute infwmotion should 'f l be provided by the Shift Rod Pro Tech on 'THEN THEN Pose 2 of SSCL l l m l Refer to ECC SECTION 3 prior to c1 ossification for prior to classificctior, for Refer to ECG SECTION 1 Refer to ECG SECil0N 7 I ~~ prior to classificadon for possible escolating possitda escdoting. possible escolotg conditieas. conMtions. condit' ns. o REFER TO ' REFER TO REFER TO - REFER TO ATTAChWEhT 1 ATTACHWENT 1 ATTACHWENT 1 ATTAC tWENT 12 NOTW1MW .REPORUNG t%'SUR EVENT . UNUSUE DENT UNU50 4 EVENT ONE HOUR REPORT HCGS. REV. 4 '

m Qi ( rec I TECHNICAL SPECIFICATION / PLANT STATUS CHANGES iten m to SECTION 18 Pg. 3 of 5 C. ANY DEV1ATIOff F30af T/5 IL AFT EVENT OR CONDfTIOff

1. IIAJOS 1285 er EIEEllCENCY L ANY THROUCH WA!1 LEAES E. A'tY I!'WFtA41sEB et OR IJCENSE CONDET10eg IN AN.

DCP'9C OPEidAT10ft 1114T aggretnamsf CAPa51UTY. IN CDOE LT, ASS 1. 2. OR 3 eCCDENTaL CRf*kAUTY ttg!gT]?g; ElsERGENCY WIEEN NEE 9ED - RE5ULTS Bt THE OFF5fft RESP 0lWSE FIPl!8G [10CFR?O32 (e)] To FRornet Tut ::zAtTs Corsstrioae CF Ter rtANT CarnaturY. De - (tecFaso.72 (bXIMEXt)1 ComM AND SAFETY OF THE FUBUC BEING SEBot&Y DErRADES Cotesc!nCaf10!ss CAPagERY [toCraso.72 (tXtxtNo}} [toCFaso.72 (tXtMH)] (10CFRSO.72 (bMtXv)} F W f F W r i A. i.d e., e s a i sssm o w eete A,,,w es ,to ., oce e, eo., re e - r. etten consMeait e4*t T/S en event er conetion is ec}sr teos of Gar of the are ide*itded irt code erst:ce6ty I or licenA con provide found eunng plant opere*ka fotooeg has occurece-etuss 1. 2. er 3 poing-THEN odequete er equ-*nt that revutts = ** s*rt. [ protecten in en emegeacy includes anncee safety (e"ciudas Sc'*8*d tremers. heing in acy or t*ie mim er es part. THEN s af a prepeneped test) i 81GII:Sutti ection must be tone ng conegens. I appn=d at wst by

  • Emergency teotd.caten l

a sieensed SRO. Aa unoneirred coaetion Systrn (EMS). l me,,m 8*"* 'dW THEN -v~- EALS in o con.4 o., oues, e t e t- - I .es-FacWh .spos or cros ver > 24 l tan; in e coaonen cet cowred fein r-i pe- .at.,or ep-t.n er - . A. ,,oo, aCs - o or,. I e ~ es ,2 l THEN an6eet,a.s er piort _~ g;;g,1?& . er C .o - l

    • "e 'S ec'8'Y 'Or For peing t*et es pet d8 l

occ i essess** cal er pn cent n,ie,aney, refer to EAL f f.A.S f gygg prior ** cicesheten. I I i i I L __ ATT NT 12 ATT as 12 REPORDNG cat, cots street. out sicur te m HCGS REv. A v,,- . _ ~.. -,...

b d U., ECG SECTION 10 TECHNICAL SPECIFICATION / PLANT STATUS CHANGES gcr; ope L ACTUATION CF ENGINEERED M. REACTOR SCRAM EXCEPT N. ANY EVENT FDUND TH!!.E O. ETENT/ CONDITION THAT 5ATETT FEATURE EXCEPT PREPtA'tNED S3CTDCTM THAT TOLID RAYE ALDME COUt.D RAYE NTIATING PREPtANNED {t0CTR50.72 (bMZXit)] SERMUSLY DECRADED THE PLANT PRETENTED CERTAIN [t0CFRse.72 (bX2XiO] [ser m :2(bXZX01 sArtry rrNCrms CorOTIONS (LOCf1tSO.72 (bM2Xht)] I~ lF F lF 'T Any event or condition that h42nus. "' tutomatie Reactor Any event, found o =le the W eweet or cone.tm t% r resudts in rnonuot or Screr" -'e it po.1 of a reactor 4 smut deen. tnt. C'::ce could howe pe*+ated f cutomats actuoten of any prW % sei:;uence dunng had it W found durmg tte fulfAraeat of the sc e*y r Engirwered Sciety Fecture testieg or opereten, operetm would have functen of structures or l (ESF) including the Reactor re,Aed in the Pter t, systems thct ore ceeded te g Protection System (RPS). THEN ecludag its precW sc ey r mcertoe it in o se'e THEN te.ag seras r degro wd snatdown ceneten e I m = l R to. action i. C l we g, conciten tact signdcorty c, " " ~ M W F I espianoten of on Ceeo, tM,,,eose o, Engireered WMF rodotttive meterci Feature THEN ca EALS l we 1.+ --es l g o-e,i oce actueten of on ESF l or EPS that is part THEN of o prepsonned g l S'***C' W Even's cowe ed etmve eney inc* wee testeg or egere*mn gn, or me,, racy M te W ,,ecedurut eerors. eerprae' t l ~~ M Z-0006(O) for Aw/cm l cient.caten. +sewy of ees,gn. oneyss. l fetricetica, coas*ruction cad /or peccedural -~a w. w I m l - ~ For ECCS octuot'en with dscharge N""o mainteaance autoges of to the RPY. refer to M '8C 8"gie tree sofe*y syste 's a e E N' I h " l prior to ctessifconen. Te N ece 5:=cifceban prow seas (NOREG 1022. Suppieaent 1 l 'F911) L_ _ REFER TO REFER TO W'@N ATTACHut4714 ATT.4CHWEMT 14 REPORTING Tm 2 O R REPeet Fout Mcut REPcur HCGS REv. 4

.['- w r 4-1 cdo SECTION 18 TECHNICAL SPECIFICATION -/ PLANT STATUS CHANGES stcmu ie ; Pg. 5 ef 5 - P. PRESENCE OF A LOOSE Q. VI0tAft0N M T1EE R. IICESSITE HEAT E7/C008. S. Itc CIltutSTRY DETERIMMER T. DISCtWERY OF L43PERAEta NTIATING raf ei Tat REACTon mEstnREutNTs Cerrfa: Nun soirs mates to et ocTset Ansvasta sNtm 1 CONDITIONS CootANT SY3TEu IM OPERATEsc 'JcENsE [T/5 3.4.8.t]. IJutTS [T/5 3.T.S] [ REG. SUIDE 1.133] [IJCENSE CtPs9tTIDM 2F] [T/S 14.4] r~ W W W W W i g a Presence of a loose part Moletion of 18w re6% Acy of the T/S LCO's The conductivity, chiande One er enere snubbees are [ in the RCS is cerfrmed. contaired in Seedon 2.C o: for RCS hectum er (- 0 J~.. er pH in the found to be inece eeie and e l tne Opert:rting trease encept cocedeen retes are RCS is in ewcess of its have been rec occe er e os oteerese provided in the e=ceedee specihed sim*s per TS3 4.4 res=ored to en CPERABLE L l M Tects Spees er Emarenmerdat Actoa State =es C.1 status, om eng.neenng Protection Pion.. E/S3#6N t*weeby requim3 en evaluetion shan be perferswe e geeenng evenuoben to per T.S 4 7.Sg I de* ermine the e fects of r D gg l the out of Iwnit cond4 ion T'EN l en etw structurce interty of the RCS I e i i I t i EALS l I i i I 2 l t t ne l Attoctmat 22 is for the purpose e indictias oey Tech. Spec. rettsred engecering evoluctens. t-l TNs At*ochment shoofd be Wated vi pare 8e8 3 enh eny other Atteemment for.nn s., cA6 g or tJnusvot E% es necoed for Reguao'o y c l g requred A li m ",w e. l l l t_ _ RE s TO RE D TO NOTFICATION/ ATTACrusEWT 20 ATTAOesENT 22 REPORTING 24 m REPORT CDatt HCGS REV. 4 I l

ECG ATT 6 Pg. 1 of 6 ATTACHMENT 6 DESIGNATED COMMUNICATOR (CM11 COMMUNICATIOh8 LOG I I UNUSUAL EVENT I I ALERT I I SITE AREA EMERGENCY Table of Contents EA29 Designated Communicator (CM1) Log Sheet 2 Communications Log - Hope Creek Emergency 3-6 Instructions 1. This is a permanent record. 2. Initial items implemented. Name Date Time CR TSC E01 Location (circle one) m HCGS Rev. 6 f

ECG ATT 6 I I. DESIGNATED COMMUNICATOR (CM1) LOG BHEET INITIALS NOTE: Implement a new working copy of this attachment for changes in Emergency Classification as directed by the Emergency Coordinator (EC). 1. Obtain approved Initial Contact Message Form (ICMF). CM1/TSC1 from the Emergency Coordinator (EC). Telephonically / EOF 1 provide ICMF to contacts on the communications log 4 (pages 3 through 6). NOTE: Turnover of notifications responsibility may only occur after the Emergency Coordinator position transfers and a copy of-the ICMF is available to the oncoming communicator (TSC or EOF). 2. When the TSC (or EOF) is ready to assume CM1/TSC1 notifications responsibilities, discuss the following i with your relief. a. Organizations / Individuals notified of the current O level of Emergency. b. Provide, as appropriate, names and locations (numbers) of those contacted for updates / changes. ( 3. Initiate follovup transmission of ICMF on telecopier CM1/TSC1 Group A if not done previously. / EOF 1 4. Assist the Secondary Communicator (CM2) in the i CM1 transmission of data forms using the telecopier. 5. If telecopier is not working properly, request CM1 assistance from the Emergency Preparedness Advisor in the.TSC (NETS 5213). 6. Upon termination'of the evont obtain the completed CM1/TSC1 REDUCTION IN EVENT STATUS MESSAGE. FORM from the EC. 1 / EOF 1 Implement notification using the Communications Log. (Time limits do not apply.) 7. When the emergency is terminated or you are relieved CM1/TSC1 of duty, forward this and all other completed / EOF 1. documents to the SNSS/EDO/ERM. O "c = ne i 1

r ECG ATT 6 Pg. 3 of 6 O EVENT COMMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION CLASSIFICATION: NAME (UE/A/SAE) NAME OF TIME OF DATE/ CONTACT / LIMIT ORGANIZATIONS / INDIVIDUALS CONTACT TIME CALLER TIME 15 DELAWARE STATE POLICE / DEPO MIN. Primary: NETS 5406/5407 Secondary: 302-739-5851 (SP) g or 302-834-4531(DEPO) Call Back: Backup: NAWAS NOTES: IF DELAWARE IS CONTACTED, IF UNABLE TO CONTACT PROCEED WITH NEW JERSEY. DELAWARE STATE (above), CONTACT BOTH OF THE FOLLOWING. New Castle County Primary: NETS 5408 y Secondary: 302-738-3131 Kent County V Primary: NETS 5409 Secondary: 302-736-2222 15 AEW JERSEY STATE POLICE /OEM MIN. (Speak only with Trooper on duty) Primary: Nets 5400 Call '~ Secondary: 882-2000 Back: Backup: EMRAD NOTES: IF NEW JERSEY IS CONTACTED, IF UNABLE TO CONTACT NEW PROCEED TO NEXT PAGE. JERSEY STATE (above), CONTACT ALL OF THE FOLLOWING. Salem County Primary: NETS 5402 Secondary: 769-2959 Cumberland County Primary: NETS 5403 Secondary: 455-8500 U. S. Coast Guard (Speak Only With Duty Desk) Primary: 215-271-4940 'O_ Secondary: 215-271-4800 HCGS Rev. 5 l l

e ECG ATT 6 Pg. 4 of 6 EVENT COMMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION ~ CLASSIFICATION: NAME (UE/A/SAE) NAME OF TIME OF DATE/ CONTACT / LIMIT ORGANIZATIONS / INDIVIDUALS CONTACT TIME CALLER TIME 20 Emergency Duty Officer (EDO) MIN. Primary: Refer to Roster Secondary: Contact One Below Bob Hovey Office: 3478 Homet 609-678-8645 Pager: 478-5284 Jim Clancy Office: 3736 Home 609-455-9110 Pager: 478-5073 Steve Funsten Office: 3115 Home: 215-358-0635 Pager: 478-5280 Joe Hagan Office: 3463 O Home: 609-678-5265 Pagers 478-5279 20 Tech. Supp. Supervisor (TSS) MIN. Prinary: Refer to Roster Secondary: Contact One Below Steve Saunders Office: 3661 Home: 609-358-6212 Pager: 478-5343 George Daves Office: 3071 Home: 609-455-3163 Pager: 478-5281 Phil Opsal Office: 3065 Home: 609-478-0721 Pager: 478-5254 Bill O'Malley Office: 3671 Home: 609-935-6136 Pager: 478-5674 NOTES:(1) During normal working hours, the PA syste; may also be used to request an individual to call the control room. (2) After TSC activation, individual notification of EDO and TSO !s ngt required by CM1. O HCGS Rev. 6

~ ECG ATT 6 Pg. 5 of 6 EVENT COMMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION CIASSIFICATION: NAME (UE/A/SAE) NAME OF TIME OF DATE/ CONTACT / LIMIT ORGANIZATIONS / INDIVIDUALS CONTACT TIME CALLER TIME 30 LAC Township MIN. Primary: NETS 5404 Secondary:935-7300 30 General Manager - Hope Creek 1 MIN. Operations (Contact One) Joe Hagan Office: 3463 Home: 609-678-5265 Pager: 478-5279 Car: 922-5622 Bob Hovey Office: 3478 Honme: 609-678-8645 Pager: 478-5284 30 Public Information Manager - t' MIN. Nuclear (Contact One) Dick Silverio Office: 1002 Home: 609-829-1546 Pager: 478-5098 Karen Bell Office: 1006 Home: 302-324-8076 Pager: 478>5051 Car: 471-4872 Wes Denman Office: 1007 Home: 609-935-6349 Pager: 478-5229 60 NRC Operations Center MIN. (ICMP & NRC Data Sheet) Primary: (ENS) Secondary:301-951-0550, 301-427-4259, 301-427-4056, 301-492-8893 NOTES: HCGS Rev. 6

ECG ATT 6 Pg. 6 of 6 O\\. COMMUNICATIONS LOG INITIAL "*IFICATION REDUCTION EVENT CLASSIFICATION: NAME (UE/A/SAE) NAME OF TIME OF DATE/ CONTACT / LIMIT ORGANIZATIONS /INDIVIDUAIS CONTACT TIME CALLER TIME 60 NRC'Residento (Contact One) MIN. Tom Johnson Office 3280 or 935-5151 Homes 301-272-1480 Kirke Lathrop Office: 3280 or 935-5151 Home: 301-392-0369 60 Emergency Preparedness MIN. (Contact One) Jim Schaffer Office: 1575 Home 609-299-2057 Pager: 478-5086 Tom DiGuiseppi Office: 1517 Home: 609-398-8323 O Pager 478-5203 Craig Banner Office: 1157 Home: 609-728-5043 Pager: 478-5215 1 NOTE: Remind External Affairs Repr. to contact the Board of Public Utilities & NJ Depart, of Energy 90 External Affairs MIN. (Contact One) Mike Bachman Office: 1434 Home:- 609-358-7211 Pager: 478-5206 Brian Gorman Office: 1433-Home: 609-228-1089 Pager: 478-5100 Jan Moyle Office: 1436 Home: 609-424-8522 Pager: 478-5259 90 American Nuclear MIN. Insurers: 203-677-7305

  • NOT REQUIRED FOR UNUSUAL EVENTS HCGS Rev. 6

ECG ATT 7 Pg. 1 of 7 ATTACHMENT 7 DESIGNATED COMMUNICATOR (CM1) COMMUNICATIONS LOG I I GENERAL EMERGENCY I I PROTECTIVE ACTION RECOMMENDATION (PAR) UPDATE Table of Contents Pacte Designated Communicator (CM1) Log Sheet 2 Communications Log - Hope Creek Emergency 4-7 Instructions 1. This is a permanent record. 2. Initial items implemented. Name Date Time CR TSC EOF Location (circle one) HCGS Rev. 6 1 O

~ a -s ECG 1 ATT 7 ~' Pg. 2 of 7 I. DESIGNATED COKMUNICATOR (CM1) LOG SHEET INITIALS NOTE: Implement a new working copy of this attachment for changes in Emergency Classification as directed by the Emergency Coordinator (EC). 4 NOTE: For 15 minute notifications use NETS X5555 conference call (separate contact required for Coast Guard). 1. Obtain approved Initial Contact Message Form (ICMF) -CM1/TSC1 from the Emergency Coordinator (EC). Telephonically / EOF 1 provide ICMF to contacts on the communications log (pages 4 througn 7). NOTF' Turnover of notificati. .esponsibility may only occur after the Emergency Coordinator position transfers and a copy of the ICMF is available to the oncoming communicator (TSC or EOF). j O 2. When the TSC (or EOF) is ready to assume CM1/TSC1 notifications responsibilities, discuss the following with your relief, a. Organizations / Individuals notified of the current level of Emergency. b. Provide, as appropriate, names and locations (numbers) of those contacted for updates / changes. 3. Initiate: followup transmission of ICMF on telecopier CM1/TSC1 Group A if net done previously. / EOF 1-4. Assist the Secondary Communicator (CM2) in the CM1 transmission of data forms using the telecopier. 5. If telecopier is not working properly, request CM1 assistance from the Emergency Preparedness Advisor in ~_ the TSC (NETS 5213). ) HCGS Rev. 6

~ ECG ATT 7 Pg. 3 of 7 b 'V INITIALE 6. Upon reduction of the Event Classification, obtain CM1/TSC1 the completed REDUCTION IN EVENT STATUS MESSAGE FORM from the EC. Implement notification using the / EOF 1 Communications Log. (Time limits do not apply.) l 7. When the emergency is terminated or you are relieved CM1/TSC1 of duty, forward this and all other completed / EOF 1 documents to the SNSS/ED0/ERM. O O ucce Rev. e

ECG ATT 7 Pg. 4 of 7 O EVENT COMMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION CLASSIFICATION: General NAME Emergency NAME. OF TIME OF DATE/ CONTACT / LIMIT ORGANIZATIONS / INDIVIDUALS CONTACT TIME CALLER TIME 15 NEW JERSEY STATE POLICE /OEM MIN. (Speak only with Trooper on duty) call Primary: Nets 5400 Back: Secondary: 882-2000 DELAWARE STATE POLICE / DEPO Primary: Nets 5406/5407 j Secondary: 302-739-5851 (SP) Call or 302-834-4531(DEPO) Back: Backup: NAWAS LAC Township Primary: Nets 5404 Secondary: 935-7300 Call Back: Salem County s Primary: NETS 5402 Secondary: 769-2959 Call Backup: EMRAD Back: Cumberland County Primary: NETS 5403 Secondary: 455-8500 Call Backup: EKRAD Back: New Castle County Primary: NETS 5408 Secondary: 302-738-3131 Call Back: Kent County Primary: NETS 5409 Secondary: 302-736-2222 Call Back: 15 U.S. Coast Guard MIN. (Speak Only With Duty Desk Primary: 215-271-4940 Call Secondary: 215-271-4800 Back: Reminder: Use NETS 5555 (conference call) for 15 min. notification (s) except for U.S. Coast Guard. NOTES. HCGS Rev. 6

ECG ATT 7 Pg. 5 of 7 EVENT ~ COKMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION CLASSIFICATION: General NAME Emergency NAME OF TIME OF DATE/ CONTACT / l LIMIT ORGA!]IZ ATIONS/ INDIVIDUALS CONTACT TIME CALLER TIME 20 Emergency Duty Officer (EDO) MIN. Primary: Refer to Roster l Secondary: Contact One Below l Bob Hovey Office: 3478 Home: 609-678-8645 l Pager: 478-5284 Jim Clancy Office: 3736 Home: 609-455-9110 Pager: 478-5073 Steve Funsten l Office: 3115 Home: 215-358-0635 Pager: 478-5280 Joe Hagan Office: -3463 l ,/ Home: 609-678-5265 Pager: 478-5279 20 Tech. Supp. Supervisor (TSS) MIN. Primary: Refer to Roster Secondary: Contact One Below Steve Saunders Office: 3661 ( Home: 609-358-6212 l Pager: 478-5343 George Daves l Office: 3071 Home: 609-455-3163 Pager: 478-5281 Phil Opsal Office: 3065 Home: 609-478-0721 Pager: 478-5254 Bill O'Malley Office: 3671 Home: 609-935-6136 Pager: 478-5674 Notes: (1) After TSC activation, individual notification of the EDO and TSS is not required by CM1. d(}x HCGS Rev. 6 l

4 ECG ATT 7 ( Pg. 6 of 7 EVENT COMMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION CLASSIFICATION: General NAME TIME ~ Emergency NAME OF OF DATE/ CONTACT / LIMIT ORGANIZATIONS / INDIVIDUALS CONTACT TIME CALLER TIME 30 General Manager - Hope Creek MIN. Operations (Contact One) Joe Hagan Office: 3463 Home: 609-678-5265 Pager: 478-5279 Car: 922-5622 Bob Hovey Office: 3478 Home: 609-678-8645 Pager: 478-5284 30 Public Information Manager - MIN. Nuclear (Contact One) Dick Silverio Office: 1002 Home: 609-829-1546 Pager: 478-5098 Karen Bell Office: 1006 Home: 302-324-8076 Pager: 478-5051 Car: 471-4872 Wes Denman Office: 1007 Home: 609-935-6349 Pager: 478-5229 60 NRC Operations Center MIN. (ICMP & NRC Data Sheet) Primary: (ENS) Secondary:301-951-0550, 301-427-4259, 301-427-4056, 301-492-8893 Notes: HCGS Rev. 6

o ECG ATT 7 Pg. 7 of 7 OV' EVENT COMMUNICATIONS LOG INITIAL NOTIFICATION REDUCTION l CLASSIFICATION: General NAME Emergency NAME OF TIME OF DATE/ CONTACT / LIMIT ORGAl{IZATIONS/ INDIVIDUALS CONTACT TIME CALLER TIME 60 NRC Residents (Contact One) MIN. Tom Johnson Office: 3280 or 935-5151 Home: 301-272-1480 i Kirke Lathrop Office: 3280 or 935-5151 Home: 301-392-0369 60 Emergency Preparedness MIN. (Contact One; Jim Schaffer Office: 1575 Home: 609-299-2057 Pager: 478-5086 Tom DiGuiseppi Office: 1517 Home: 609-398-8323 O Pager: 478-5203 Craig Banner Offices 1157 Home: 609-728-5043 Pager: 478-5215 NOTE: Remind External Affairs Repr. to contact the Board of Public Utilities & NJ Depart. of Energy 90 External Affairs MIN. (Contact One) Mike Bachman Office: 1434 Home: 609-358-7211 Pager: 478-5206 Brian Gorman Office: 1433 Home: 609-228-1089-Pager: 478-5100 Jan Moyle Office: 1436 Home: 609-424-8522 -Pager: 478-5259 90 American Nuclear Insurers MIN. 203-677-7305 HCGS Rev. 6

ECG ATT 12 Pg. 1 of 5 ATTACHMENT 12 - ONE HOUR REPORT - NOTES: A. Refer to Attachment 9, Non-Emergency Notifications Reference, for the current listing of individuals and phone numbers. B. Each step shall be initialed by the responsible individual when completed. I. NOTIFICATIONS

1. Notify the Operations Manager and confirm classification of SNSS event.

ECG Section Initiating Condition (Contacts are listed in Attachment 9) notified at hrs on name time date 2. Complete the NRC Data Sheet with initial data available SNSS (pages 4 and 5 of this attachment). 3. Notify NRC Operations Center of the event within i bour. SNSS Use NRC Data Sheet to record additional information ;orovided to the NRC. (Phone numbers are in Attachment 9) notified at hrs on name time date 4. Notify _the NRC Resident Ins,.a (Contacts are listed in SNSS ) notified at hrs on name time date O

ECG ATT 12 /~' Pg. 2 of 5 b). INITIALS

5. Notify Public Information Manager - Nuclear or Alternate with SNSS details of the event.

(Contacts are listed in Attachment 9). notified at hrs on name time date

6. Notify Telecopy Group E by transmitting the NRC Data Sheet.

SNSS If transmission of this report to Group E is incomplete, notify the Emergency Preparedness Representative (EP Representative) with the description of the event. (Contacts are listed in Attachment 9). EP Representative: notified at hrs on name time date 7. If a maior loss of communications caoability has occurred SNSS (such as ENS, NETS, DID, etc.), then notify both of the ( following: EP Representatives (Attachment 9) notified at hrs on name time date Newark Help Desk Operators (201-333-5555 or ESSX 5555) Inform the Operator that the failed system dr. an " Emergency Priority Circuit". notified at hrs on name time date 8. Notify External Affairs with details of the event. (Contacts SNSS are listed in Attachment 9). notified at hrs on ~~ name time date HCGS Rev. 2 O l

    • s

~~ ECG ATT 12 Pg. 3 of 5 ,O %/ II. REPORTING

1. Ensure that an Incident Report (IR) is prepared.

SNSS-2 '. Forward this attachment, along with the IR and any SNSS supporting documentation, to the Operations Manager.

3. Review IR and any other available information OM for correct classification of event and corrective action taken.
4. Contact the LER Coordinator and request written followup OM

( required 30 days after event ). Provide this attachment and any other supporting documentation received from the SNSS.

5. Prepare required reports.

ECG Attachment 23 may be LERC used as a guide for reporting requirements. Report or LER Number 6. Forward this attachment to the Emergency Preparedness (g~ LERC Manager. j

7. Ensure that offsite (state and local) reporting EPM requirements have been met.

8. Forward this Attachment package to the Central Technical EPM Document Room (CTDR) for microfilming. HCGS Rev. 2

( e9. tCo ATT 12 Pg 4 of 5 ^ NRC DATA SHI2lT (Page I of 2) N0firiCATION flWE FACluTY OR ORGANIZAil0N UNIT CALLER'S NAWE TELEPHONE NUWBER (r0R CALL BACK) CVENT TIWC & ZONE EVENT DATE EVENT CLA55tF1 CATION (Cheek One' { (CENERALEWERCENCY l1HRl 10CFR50.72(b)(1) ( )l POWER /WODE BEFORE POWER /WODE AGIS l SITE AREA EWERCENCY jdHRl 10CFR50.72(b)(2) ( )I e I HRISECURITY/SAFECUARDS I T TRANSPORTATION EVENT UNUSUAL EVENT OTHER:

  • FOR NON-EWERGENCIES PROYlDE THE SPEC!r1C SUBPART NUW6CR Or THE 10CFR50.72 REPORTING REQUIREWENT FROW THE ECG INITIATING CONDITION STATEWENT.

EVENT DI3CRIPTION Include Systems offected, octuotions & their inificting signots, causes, effect of event on plant, octions token et planned, alc. NOTIFICATIONS YES NO WILL BE ANYTHING UNUSUAL OR NOT UNDERST0007 YES NO (Explain above) NRC RES! CENT STATE (s) (NJ) (DEL) ] DID ALL SYSTEMS FUNCTION AS REQUIRED 7 YES NO LOCAL (LACT) (Esplein above) 'OTHER GOV. AGEN0lES l WODE Or OPERATION EST1WATE FOR ADDITIONAL INFO UNTIL CORRECTED: RESTART DATE: ON PAGE 27 WEDIA/ PRESS RELIASE { ADDITIONAL INFORWATION FOR TELECOPY E ECC Section inmoting Condition APPROVED FOR TRANSulTTAL: kNSS HCGS Rey, 2

.-.. ~. . _ _.,. =. - -.~-.-. 4 es, ECC ATT.12 Pg. 5 of 5 NBC DATA SHI2:7 (Pogo 2 of 2) RADIOLOGICAL mmen CHECK OR FILL IN APPUCABLI ITEWS (speems setene/esponesiens enews be severse in evene sesenoten) UQUID RELEASE CASCOUS RELIASE llUNPLANNEDRELEASEl PLANNED RELEASE ONGolNG l TERWINATED i WONITORED UNWONITORED l l0rTSITE RELEASE l T.S. EXCEEDED RW ALARWS lAREAS EVACUATED PERSONNEL EXPOSED OR CONTAWINATED l l0rTSITE PROTECTIVE ACT10NS REC 0WWENDED; State reiease potn in desenotion. RELEASE TYPE Reloose Rote (C1/sec) l T.S. UWIT l T. T.S. UWIT Total Activity (Cl) T.S. UWIT

f. T.S. UWIT Noble Cos lodine Particulate Uculd (escluding triflum &

dissolved noble gosas) Uculd (Triflum) TOTAL ACTIVITY l RELIASE PATHWAY PLANT VENT l CONDENSER / AIR EJECTOR WAIN STEAW UNE SG BLOWDOWN OTHER RAD WONITOR READINGS & UNITS ALARW SETPolNTS % T.S. UWIT (if opplicable) RCS OR SG TURE LEAIX CHECK OR F1LL IN APPUCABLE ITEWS (speeme seeenis/e:Weaeneas should be ee eres in evene deserspoen) LOCATION OF THE LEAK (e.g. SG, vahre, pipe, etc.) LEAK RATE: UNITS: gpm/gpd T.S. UWITS: SUDDEN OR LONG TERW OEVELOPMENT7 SUDDEN LONG TERW LIAK START DATE: TlWE COOLANT ACTIVITY & UNITS: PRI:JARY - SECONDARY - UST OF SAFETY RELATED EQUIPWENT NOT OPERATIONAL: EVENT DESCERTION (Continued from Page 1) O APPROVED FOR TRANSWITTAL: SNSS Rev. 2 gg .-}}