Monthly Operating Rept for Nov 1982
ML20067D650
Person / Time
Site: McGuire 
Issue date: 12/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20067D646 List:
References
NUDOCS 8212210065
Download: ML20067D650 (6)


Text

., _ =..

OPERATING DATA REPORT DOCKET NO. 50-369 DATE 12-15-82 COSIPLETED BY J. A. Reavis TELEPil0NE 704-373-7567 OPERATING STATUS Notes

  • NOTE: Nameplate Rating McGuire Unit 1
1. Unit Name:
2. Reporting Period: Novernher 1.1

-November 30.1QR2 00 Ax power

3. Licensed Thennal Power i.stwi):

factor per Page iii,

1305,
4. Nameplate Itating (Grow 31We).

NUREG-0020.

1180

5. Design Electrical Rating (Net alWeM
6. Slaximum Dependable Capacity (Grm 31We):

1180

7. Alasimum Dependable Capacity iNet alwe):

S. If Changes Occur in Capacoy Ratings tirems Number 3 Th.cqh 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted.lf Any t' Net alwe):
10. Reasons For Restrictions. If Any:

[

This 5' anth Yr..to.Date Cumulative 720.0 8 016.0 8 760.0

!1. llours in Reporting Period 314.2 _

6 352.5 6 398.2

12. Number Of flours Reactor Was Critical
13. Reactor Reserve Shutdown flours 14.11ours Generator On.Line 311.0 6 308.6 6 354.3
15. Unit Resene Shutdown flours
16. Gross Thermal Energy Generated (>lWil) 527 736 12 151 483 12 236 438
17. Gross Electrical Energy Generated (>lW}l) 181 2Q1___.

4 164 792 4 193 ??R IS. Net Electrical Energy Generated (51Wil) 163 290 3 896 998 3 916 054

19. Unit Service Factor 43.2 78.7 72.5

- 20. Unit Availability Jactor 43.2 78.7 72.5 21.. Unit Capacity Factor (Using.\\lDC Net) 19.2 41.2 37.9

22. Umt Capacity Factor (Using DER Net) 19.2 41.2 37.9
23. Unit Forced Outage Rate 11.7 17.5 24.3
24. Shutdowns Scheduled Oser Nest 6.\\lonths (Type. Dat.and Duration of Each t:

Steam Generator Modification - January 15, 1983 - 11 Weeks 2.i. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed l

l INITl \\ L CRITICA LITY INITI Al. ELEC I RlCI T Y CONIMI.RCI A L OPLh A flON 8212210065 821215

~

(9/77)

PDR ADOCK 05000369 R

PDR

DOCKET NO. JiD-269 UNIT McGuire 1 12-15-82 DATE AVERAGE DAILY UNIT POWElt LEVEL MONTil November.1982 AVERAGE D AILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net)

DAY (MWe net) 1 555 17 2

557 18 3

551 19 4

555 20 5

483 21 6

22 7

23 494 8

24 560 g

25 552 552 10 26 11 27 518 12 28 543 13 29 559 14 30 560 15 31

~~

16 i

DAILY UNrr l'OWEtt LEVEL Folt\\1 INSTitUCTIONS On this form, hst the averare d.nly umi power lesel in M'Ne. net for each day in the reporting n.onth.

Compute to the nearest wnote mepw.itt.

These figures will l e used to plot a graph for each reportmtt month. Note that by usind maximum t

dependable capacity f or the net electrical ratin.: of the urut theri: mas be..i c. mons when the i uly average power leve: enceds the 100

  • hne f or Ilie restricted power lesel hnel. In such e.ises, the average daily unit power output sheet should be footnoted to t splain the appaient anomaly.

50-369 DOCKET NO.

UNIT S!!UTDOWNS AND POWER REDUCTIONS UNIT NAME Mer,oire 1 DATE l ? l'i R2 l

COMPLFTED HY '

Re l

ItEPORT AtONTil ovember,1982 N

e.

E E

.! g 3

$ s'E Licenseh-E-r, f,.,

Cause & Currective No.

Date 3

3.g j

jg&

Event 37' 93 Action to jE c2 3 ;f, g Repori e u) O 5O Preveni Recurrence u

5 Q

15-p 82-11-01 F

H CB HTEXCH Limited to 50% power while awaiting modification to steam generator design.

l 20 82-11-05 F

14.50 H

4 SB SUP0RT Unit tripped from 20% power due to

)

Nuclear :

trumentation' Calibration while manus 'v sh'utting down to work on containment spray heat exchanger hangers.

1 20A 82-11-06 F

26.83 A

HA PUMPXX Bad bearings in main turbine bearing oil pump.

20B 82-11-07 S. 367.'70 B

CB RIEXCli -

Steam generator tube inspection.

16-p 82-11-22 F

H CB HTEXCH

' Limited to 50% power.

I 2

3 4

F: Forced Reason:

Method:

. Exhibit G Instruerums S: Scheduled A-liguipment Failure (Explain) 1 -Manual for Preparation of Data n-Maintenance of Test 2 Manoal Scram-Entry Sheets for 1.icensee C-Refueling 3-Automatic Scram.

Event Report (LER) Fde INtIRI G-D-Regulatory Restriction 3-Other (Explain) 0161)

E-Ope.ator Training & License Examination 5

F-Administrative G-Opeiational E:ror (Explain)

Exhibit 1 - Same Somee p>/77)

II-Ot her (E.xplain)

DOCKET No: 50-369 UNIT: McGuire 1 DATE:

12-15-82 NARRATIVE SUMBIARY Month: November, 1982 McGuire 1 entered the month at 50% power.

November 5 the unit commenced to shutdown to work on welds that had been declared inoperable on the contain-ment spray heat exchanger hangers. While decreasing loads a spurious trip occurred at 20% power due to Nuclear Instrumentation Calibration.

November 6 the unit commenced reactor startup.

Reactor shutdown from 5% power was begun due to bad bearings in the main turbine bearing oil pump. The deci-sion was then made to continue cooling down for an outage to inspect the steam generator tubes.

Late on November 22 the station commenced with reactor startup and by midnight the unit was on line.

McGuire 1 run the remainder of the month at 50% power, with the exception of two I

reductions to assist in reaching system minimum load on November 27 and 28. McGuire 1 will be limited to 50% power until further analysis of the steam generator is completed.

i

MONTHLY REFUELING INFORMATION REQb1ST 1.

Facility name:

McGuire Unit 1 2.

Scheduled next refueling shutdown:

January, 1984 3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A Scheduled date(s)/Afor submitting proposed licensing action and supporting 5.

information:

N 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

N/A 7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

27 8.

Present licensed fuel pool capacity:

500 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

DUKE POWER COMPANY Date:

December 15, 1982 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

McGUIRE NUCLEAR STATION Operating Status Report 1.

Personnel Exposure For the month of October no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release contribution to whole body dose for October has been compared with the Technical Specifications annual value of 3 mrem; the total release for October was less than 10 percent.

The total station gaseous release contribution to any ordan dose for October has been compared with the derived Technical Specifications annual value of 15 mrem; the-total release for October was less than 10 percent of this limit.