Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067E781 + (16:23:07, 16 December 2024)
- ML20067E777 + (16:23:10, 16 December 2024)
- ML20067E769 + (16:23:11, 16 December 2024)
- ML20067E767 + (16:23:13, 16 December 2024)
- ML20067E746 + (16:23:14, 16 December 2024)
- ML20067E739 + (16:23:16, 16 December 2024)
- ML20067E734 + (16:23:17, 16 December 2024)
- ML20067E725 + (16:23:22, 16 December 2024)
- ML20067E723 + (16:23:25, 16 December 2024)
- ML20067E716 + (16:23:26, 16 December 2024)
- ML20067E632 + (16:23:29, 16 December 2024)
- ST-HL-AE-3677, Forwards Semiannual fitness-for-duty Program Performance Rept for Second Half 1990 + (16:23:30, 16 December 2024)
- ELV-02504, Forwards Findings & Corrective Actions Taken by Smithkline Beecham Clinical Labs Re Two Presumptive Positive Samples Forwarded from Southern Nuclear Operating Co on 910108 for Confirmation Testing + (16:23:31, 16 December 2024)
- ML20067E623 + (16:23:31, 16 December 2024)
- ML20067E616 + (16:23:33, 16 December 2024)
- JAFP-91-0103, Rept of 10CFR20.407 for CY90,consisting of Number of Individuals for Whom Personnel Radiation Monitoring Provided & Estimated Whole Body Exposure Range (Rem) + (16:23:36, 16 December 2024)
- ML20067E609 + (16:23:37, 16 December 2024)
- ML20067E605 + (16:23:38, 16 December 2024)
- ML20067E604 + (16:23:39, 16 December 2024)
- 05000298/LER-1991-001, :on 910107,unplanned Actuation of Group IV Isolation Logic Occurred.Caused by Incorrect Placement of Jumper.Event Incorporated in Industry Events Training for I&C Technicians + (16:23:40, 16 December 2024)
- ML20067E596 + (16:23:42, 16 December 2024)
- ML20067E592 + (16:23:42, 16 December 2024)
- 05000254/LER-1989-022, :on 891128,unit 1 High Pressure Coolant Injection Sys Declared Inoperable Following Unexpected Actuation of HPCI Pump Room Deluge Sys.Cause Unknown. Procedure Revised & Operator Trained + (16:23:44, 16 December 2024)
- ML20067E587 + (16:23:45, 16 December 2024)
- ELV-02507, Summarizes Progress in Safeguards Info Review Program Implemented to Minimize Future Safeguards Info Violations Discussed at 901113 Enforcement Conference.Overall Program Will Not Be Completed Until 910630 + (16:23:46, 16 December 2024)
- ML20067E584 + (16:23:46, 16 December 2024)
- ML20067E581 + (16:23:47, 16 December 2024)
- ML20067E580 + (16:23:47, 16 December 2024)
- ELV-02530, Forwards Response to Unresolved Item Noted in Insp Repts 50-424/90-31 & 50-425/90-31 from Insp on 901210-14.Response Withheld + (16:23:48, 16 December 2024)
- ML20067E578 + (16:23:49, 16 December 2024)
- ML20067E576 + (16:23:49, 16 December 2024)
- ML20067E574 + (16:23:50, 16 December 2024)
- ML20067E570 + (16:23:50, 16 December 2024)
- ML20067E569 + (16:23:51, 16 December 2024)
- 05000321/LER-1991-001-01, :on 910118,reactor Scrammed Due to Remote Transmission Line Failure Coupled W/Switchyard Breaker Failure.Failed Power Line & Breaker Repaired & Failed HPCI Speed Controller Replaced + (16:23:53, 16 December 2024)
- ML20067E560 + (16:23:54, 16 December 2024)
- ML20067E559 + (16:23:55, 16 December 2024)
- ML20067E558 + (16:23:56, 16 December 2024)
- ML20067E554 + (16:23:57, 16 December 2024)
- ML20067E556 + (16:23:57, 16 December 2024)
- ML20067E548 + (16:23:58, 16 December 2024)
- ML20067E552 + (16:23:58, 16 December 2024)
- 05000374/LER-1991-001-04, :on 910110,three Open Conduit Penetrations Discovered on 687 Ft Elevation of Diesel Generator Bldg Fire Rated Barriers,Which Could Render HPCS Inoperable.Caused by Personnel Error.Fire Watch Initiated + (16:24:00, 16 December 2024)
- ML20067E530 + (16:24:01, 16 December 2024)
- B13736, Forwards Addl Info Re 901025 Application for Amend to License NPF-49,deleting Surveillance Requirements in TS Section 4.5.2.d.1 Re RHR Autoclosure Interlock Concurrent W/ Removal of Autoclosure Interlock Circuitry + (16:24:02, 16 December 2024)
- ML20067E527 + (16:24:02, 16 December 2024)
- ML20067E515 + (16:24:03, 16 December 2024)
- ML20067E521 + (16:24:03, 16 December 2024)
- ML20067E511 + (16:24:06, 16 December 2024)
- 3F0291-04, Monthly Operating Rept for Jan 1991 for Crystal River Unit 3 + (16:24:07, 16 December 2024)
- ML20067E509 + (16:24:10, 16 December 2024)
- ML20067E508 + (16:24:14, 16 December 2024)