Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069K310 + (15:36:13, 16 December 2024)
- ML20069K305 + (15:36:14, 16 December 2024)
- 05000366/LER-1983-014, Forwards LER 83-014/03L-0 + (15:36:15, 16 December 2024)
- ML20069K303 + (15:36:16, 16 December 2024)
- ML20069K302 + (15:36:16, 16 December 2024)
- ML20069K300 + (15:36:17, 16 December 2024)
- ML20069K297 + (15:36:18, 16 December 2024)
- ML20069K296 + (15:36:19, 16 December 2024)
- ML20069K294 + (15:36:20, 16 December 2024)
- ML20069K293 + (15:36:21, 16 December 2024)
- ML20069K292 + (15:36:22, 16 December 2024)
- ML20069K291 + (15:36:22, 16 December 2024)
- ML20069K289 + (15:36:26, 16 December 2024)
- ML20069K288 + (15:36:27, 16 December 2024)
- ML20069K285 + (15:36:28, 16 December 2024)
- ML20069K287 + (15:36:28, 16 December 2024)
- 0CAN048306, Rev to 830223 Request for Amends to Licenses DPR-51 & NPF-6, Changing Tech Specs Re Administration.Rev Due to Recent Energy Supply Dept Reorganization + (15:36:29, 16 December 2024)
- ML20069K281 + (15:36:30, 16 December 2024)
- ML20069K283 + (15:36:30, 16 December 2024)
- ML20069K280 + (15:36:31, 16 December 2024)
- ML20069K272 + (15:36:32, 16 December 2024)
- ML20069K278 + (15:36:32, 16 December 2024)
- ML20069K270 + (15:36:34, 16 December 2024)
- 05000458/LER-1994-009, :on 940513,discovered That Condensate Leakage from Drywell Air Coolers Being Incorrectly Counted Due to Piping Error.Installed Configuration of Floor & Equipment Drains in Containment & Drywell Verified + (15:36:37, 16 December 2024)
- NRC-94-4160, Forwards Rev 0 to WCAP-14075, AP600 Design Differences Document for Development of Emergency Operating Guidelines Rept + (15:36:38, 16 December 2024)
- ML20069K262 + (15:36:39, 16 December 2024)
- ML20069K260 + (15:36:40, 16 December 2024)
- ML20069K259 + (15:36:41, 16 December 2024)
- ML20069K258 + (15:36:41, 16 December 2024)
- ML20069K257 + (15:36:42, 16 December 2024)
- ML20069K254 + (15:36:43, 16 December 2024)
- ML20069K250 + (15:36:44, 16 December 2024)
- ML20069K247 + (15:36:49, 16 December 2024)
- 05000302/LER-1983-014-03, /03L-0:on 830310 & 17,power Lost to Meteorological Monitoring Sys.Caused by Failure of Synch Card in Primary Inverter Power Supply & Personnel Transferring Secondary Power Source During Electrical Change + (15:36:50, 16 December 2024)
- ML20069K243 + (15:36:52, 16 December 2024)
- 05000368/LER-1982-029, Forwards LER 82-029/03L-0 + (15:36:53, 16 December 2024)
- ML20069K241 + (15:36:54, 16 December 2024)
- 05000361/LER-1982-176-01, /01T-0:on 820710,independent Verification Not Performed on Reactor Trip Circuit Breakers 4,6 & 7 Undervoltage Trip Mechanism Operability After Maint.Caused by Personnel Oversight.Maint Program Revised + (15:36:56, 16 December 2024)
- ML20069K237 + (15:36:57, 16 December 2024)
- 05000302/LER-1983-014, Forwards LER 83-014/03L-0 + (15:36:58, 16 December 2024)
- 05000373/LER-1982-114-01, /01T-0:on 821005,installed Configuration of HVAC Duct Hanger 1382 Did Not Match Design Drawing M-1538.Caused by Misinterpretation of Fcr by Draftsman.Sargent & Lundy Drawing M-1538 Will Be Revised Prior to 821008 + (15:37:00, 16 December 2024)
- ML20069K232 + (15:37:02, 16 December 2024)
- 05000250/LER-1982-013, Forwards LER 82-013/03L-0 + (15:37:05, 16 December 2024)
- ML20069K222 + (15:37:06, 16 December 2024)
- 05000373/LER-1982-114, Forwards LER 82-114/01T-0 + (15:37:07, 16 December 2024)
- 05000361/LER-1982-176, Forwards LER 82-176/01T-0 + (15:37:08, 16 December 2024)
- ML20069K211 + (15:37:08, 16 December 2024)
- RC-94-0156, Monthly Operating Rept for May 1994 for VC Summer Nuclear Station,Unit 1 + (15:37:09, 16 December 2024)
- ML20069K207 + (15:37:10, 16 December 2024)
- ML20069K202 + (15:37:10, 16 December 2024)
- ML20069K198 + (15:37:11, 16 December 2024)