Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000338/LER-1994-004-02, :on 940621,sixteen Individual Control Rod Position Analog Computer Points Were Discovered Off Scan. Caused by Computer Points Being Off Scan.Computer Points Were Returned to Scan & Operation + (14:35:40, 16 December 2024)
- ML20070J303 + (14:35:41, 16 December 2024)
- ML20070J284 + (14:35:43, 16 December 2024)
- ML20070J279 + (14:35:44, 16 December 2024)
- ML20070J270 + (14:35:45, 16 December 2024)
- ML20070J269 + (14:35:45, 16 December 2024)
- ML20070J251 + (14:35:46, 16 December 2024)
- ML20070J250 + (14:35:48, 16 December 2024)
- ML20070J246 + (14:35:48, 16 December 2024)
- ML20070J239 + (14:35:49, 16 December 2024)
- ML20070J238 + (14:35:50, 16 December 2024)
- 0CAN079402, Forwards Proposed Change to QA Manual Operations, Table 1, Page T1-18.Proposed Change Is Reduction of Previously Approved Records Storage Facility Commitment.Requests NRC Approval Prior to Implementation + (14:35:51, 16 December 2024)
- ML20070J234 + (14:35:51, 16 December 2024)
- ML20070J203 + (14:35:55, 16 December 2024)
- ML20070J173 + (14:35:57, 16 December 2024)
- ML20070J161 + (14:35:57, 16 December 2024)
- ML20070J134 + (14:35:58, 16 December 2024)
- ML20070J109 + (14:36:00, 16 December 2024)
- ML20070J123 + (14:36:00, 16 December 2024)
- ML20070J104 + (14:36:01, 16 December 2024)
- ML20070J106 + (14:36:01, 16 December 2024)
- 05000373/LER-1982-155-03, /03L-0:on 821118,secondary Containment Violated in Reactor Bldg at 761-ft Elevation Due to Doors 418 & 285 Opening Simultaneously.Caused by Malfunctioning Latch Bolt Due to Electric Strike out-of-adjustment at Door 285 + (14:36:03, 16 December 2024)
- 05000373/LER-1982-155, Forwards LER 82-155/03L-0.Detailed Event Analysis Encl + (14:36:04, 16 December 2024)
- ML20070J060 + (14:36:05, 16 December 2024)
- ML20070J050 + (14:36:05, 16 December 2024)
- ML20070J048 + (14:36:06, 16 December 2024)
- ML20070J044 + (14:36:07, 16 December 2024)
- ML20070J042 + (14:36:07, 16 December 2024)
- ML20070J040 + (14:36:08, 16 December 2024)
- ML20070J035 + (14:36:09, 16 December 2024)
- ML20070J034 + (14:36:09, 16 December 2024)
- ML20070J033 + (14:36:10, 16 December 2024)
- ML20070J024 + (14:36:11, 16 December 2024)
- ML20070J031 + (14:36:11, 16 December 2024)
- ML20070J015 + (14:36:12, 16 December 2024)
- ML20070J014 + (14:36:12, 16 December 2024)
- ML20070H995 + (14:36:13, 16 December 2024)
- ML20070J007 + (14:36:13, 16 December 2024)
- ML20070H984 + (14:36:14, 16 December 2024)
- ML20070H983 + (14:36:15, 16 December 2024)
- NG-82-2785, Provides Clarification for Util Commitments Re IE Insp Repts 50-331/81-03 Item 4B & 50-331/81-13 Item 2.Commitment to Revise Emergency & Plant Operating Instructions Changed to Cycle 8 Refueling Outage + (14:36:15, 16 December 2024)
- ML20070H972 + (14:36:16, 16 December 2024)
- ML20070H969 + (14:36:17, 16 December 2024)
- RBG-40726, Forwards Proposed Clarifications to LAR 93-06 Submitted on 940114 Re Proposed Changes to TS to Extend AOT & Surveillance Test Intervals for Various Instrumentation + (14:36:18, 16 December 2024)
- ML20070H965 + (14:36:18, 16 December 2024)
- 05000266/LER-1994-006, :on 940620,Halon Sys Declared Inoperable Due to Incorrect Operability Determination Following Spurious Halon Actuation on 940618.Caused by Nitrogen Leakage.Turbine Bldg Shift Log Will Be Revised + (14:36:20, 16 December 2024)
- RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR + (14:36:21, 16 December 2024)
- ML20070H935 + (14:36:22, 16 December 2024)
- ML20070H917 + (14:36:26, 16 December 2024)
- ML20070H901 + (14:36:27, 16 December 2024)
- ML20070H905 + (14:36:27, 16 December 2024)
- ML20070H885 + (14:36:28, 16 December 2024)