Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072G136 + (10:21:10, 15 December 2024)
- 05000281/LER-1983-008, Forwards LER 83-008/03L-0 + (10:21:11, 15 December 2024)
- 05000395/LER-1983-015, Forwards LER 83-015/03L-0.Detailed Event Analysis Encl + (10:21:11, 15 December 2024)
- ML20072G124 + (10:21:12, 15 December 2024)
- AECM-83-0335, Updated RO 83-010/1:on 830209,smoke Detectors Covered to Prevent Continuous Alarms During Grinding & Welding.Hourly Fire Watch Conducted.Zones Expected to Be Restored by 830630.Addl Fire Zone Listed + (10:21:16, 15 December 2024)
- ML20072G121 + (10:21:17, 15 December 2024)
- RBG-15-321, Responds Partially to NRC Re Ultimate Capacity Analysis of Mark III Containments.Rept Showing Calculated General Yielding Value for Steel Containment of 56 Psi Encl. Final Results for Remaining Issues Provided by 830930 + (10:21:17, 15 December 2024)
- ML20072G118 + (10:21:18, 15 December 2024)
- ML20072G117 + (10:21:19, 15 December 2024)
- ML20072G114 + (10:21:19, 15 December 2024)
- ML20072G109 + (10:21:20, 15 December 2024)
- 05000387/LER-1983-027-03, /03L-0:on 830219,technician Discovered That PSH-B21-N056 B & C (Low Condenser Vacuum Pressure switches-channel B & C) Did Not Meet Tech Spec.Caused by Setpoint Drift.Switches Recalibr + (10:21:22, 15 December 2024)
- ML20072G107 + (10:21:23, 15 December 2024)
- 05000267/LER-1981-047-03, During Testing,One of 12 Helium Circulator Seal Malfunction Pressure Differential Switch Units Tripped Outside Limits.Caused by Dirt Accumulation in Electrical Switch.Switch Replaced + (10:21:25, 15 December 2024)
- AECM-83-0188, RO 83-006/0:on 830210,fire Penetrations AE-382C & AE-384C Opened.Caused by Planned Maint Work Order.Hourly Fire Watch Established.Work Not Completed.Updated Rept Will Be Submitted by 830514 + (10:21:26, 15 December 2024)
- 05000336/LER-1994-013, :on 940510,discovered That 18 Month Surveillance Sp 2614D Not Performed within Required Surveillance Period.Caused by Personnel Error.Surveillance Performed Immediately + (10:21:28, 15 December 2024)
- ML20072G099 + (10:21:29, 15 December 2024)
- ML20072G096 + (10:21:30, 15 December 2024)
- ML20072G091 + (10:21:32, 15 December 2024)
- W3P83-0461, Forwards Rev 2 to Safeguards Contingency Plan.Rev Withheld + (10:21:34, 15 December 2024)
- ML20072G076 + (10:21:39, 15 December 2024)
- 05000280/LER-1983-013-03, /03L-0:on 830215,during Cold Shutdown,Valve MOV-SW-102B Would Not Cycle.Caused by Damaged Gears Linking Motor to Valve Actuator.Gears Replaced + (10:21:40, 15 December 2024)
- AECM-83-0342, RO 83-044/0:on 830509,listed fire-related Penetrations Opened to Implement Design Change Packages.Hourly Fire Watches Established within 1 H & Maintained for Duration of Planned Maint Activities + (10:21:43, 15 December 2024)
- ML20072G066 + (10:21:46, 15 December 2024)
- 05000324/LER-1983-029-03, /03L-0:on 830220,routine Surveillance During Plant Operation Revealed Audible Evidence of Airflow Through Both Doors of Reactor Bldg 50-ft Elevation.Caused by 1 1/2 Inch Diameter Hole in Outer Door.Hole in Door Sealed + (10:21:48, 15 December 2024)
- 05000280/LER-1983-013, Forwards LER 83-013/03L-0 + (10:21:51, 15 December 2024)
- 05000361/LER-1983-050-03, /03L-0:on 830519,during Surveillance Testing,Core Protection Calculator Channel C Declared Inoperable Due to Automatic Restarts Exceeding Number Allowed for 12 H Period. Caused by Intermittent Losses of Power + (10:21:52, 15 December 2024)
- 05000387/LER-1983-027, Forwards LER 83-027/03L-0 + (10:21:53, 15 December 2024)
- 05000361/LER-1983-058-03, /03L-0:on 830514,failure of Core Protection Calculator Channel B Indicated by Lights on DNBR Trip & Linear Power Density Trip & Alarm.Caused by multi-purpose Acquisition & Control Sys Error Code 10 + (10:21:57, 15 December 2024)
- ML20072G041 + (10:21:58, 15 December 2024)
- ML20072G037 + (10:22:01, 15 December 2024)
- ML20072G034 + (10:22:02, 15 December 2024)
- RBG-15-277, Interim Deficiency Rept DR-100 Re Category I Motor Control Ctr Motor Operated Valve Feeder Breaker Settings Supplied by Gould-Brown Boveri.Initially Reported on 830222.Breaker Settings Larger than Required.Interim Rept by 830713 + (10:22:04, 15 December 2024)
- ML20072G024 + (10:22:05, 15 December 2024)
- 05000324/LER-1983-029, Forwards LER 83-029/03L-0 + (10:22:06, 15 December 2024)
- ML20072G021 + (10:22:07, 15 December 2024)
- ML20072G020 + (10:22:08, 15 December 2024)
- 05000361/LER-1983-056-03, /03L-0:on 830516,w/plant in Mode 1,core Protection Calculator (CPC) D Failed & Placed in Bypass Condition. Caused by Degraded Power Supply,Probably Due to CPC Cabinet Cooling Fan Bearing Failure + (10:22:09, 15 December 2024)
- ML20072G014 + (10:22:12, 15 December 2024)
- ML20072G004 + (10:22:14, 15 December 2024)
- ML20072G002 + (10:22:15, 15 December 2024)
- L-01-014, Structural Evaluation of AR Nuclear One-Unit 1 Spent Fuel Storage Facility for Consolidated Fuel Storage + (10:22:16, 15 December 2024)
- ML20072F996 + (10:22:16, 15 December 2024)
- ML20072F989 + (10:22:17, 15 December 2024)
- ML20072F985 + (10:22:19, 15 December 2024)
- ML20072F982 + (10:22:20, 15 December 2024)
- 0CAN038324, Forwards Structural Evaluation of AR Nuclear One-Unit 1 & Unit 2 Spent Fuel Storage Facility for Consolidated Fuel Storage + (10:22:21, 15 December 2024)
- ML20072F979 + (10:22:21, 15 December 2024)
- 05000328/LER-1983-024-03, /03L-0:on 830220,w/unit in Mode 1,feedwater Flow Channel 2-FT-3-103B Declared Inoperable Due to Failing Low.Caused by Failed Zener Diode in Foxboro 66AC-OH-K Flow Modifier.Diode Replaced + (10:22:29, 15 December 2024)
- 0CAN028314, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-33 & 50-368/82-33.Corrective Actions: Nonconformance Rept Procedure Revised,Fire Watch Established & Independent Walkdown of Fire Barriers Conducted + (10:22:36, 15 December 2024)
- ML20072F968 + (10:22:36, 15 December 2024)