UNITED STATES 5
NUCLEAR REGULATORY COMMISSION
%g.s
,/
W ASHINGTON, D.C. 2055W1 ARIZONA PUBLIC SERVICE COMPANY. ET AL.
DOCKET NO STN 50-529 PALO VERDE NUCLEAR GENERATING STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 65 License No. NPF-51 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated July 1,1994, as supplemented by letter dated August 11, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Part I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-51 is hereby amended to read as follows:
9408240167 940812 DR ADOCK 05000529 PDR
(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 65, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment is effective as of the date of issuance and must be fully implemented no later than 45 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 1/us-AL L.,
Theodore R. Quay, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 12, 1994
ATTACHMENT TO LICENSE AMEN 0 MENT 2
AMEN 0 MENT N0. 65 TO FACIllTY OPERATING LICENSE NO. NPF-51 DOCKET NO. STN 50-529 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 3/4 2-8 3/4 2-8
POWER DISTRIBUTION LIMITS 3/4.2.6 REACTOR COOLANT COLD LEG TEMPERATURE LIMITING CONDITION FOR OPERATION 3.2.6 The reactor coolant cold leg temperature (T ) shall be within the Area of Acceptable Operation shown in Figure 3.2-1.
l g
APPLICABILITY:
MODES 1* and 2*#,
ACTION:
With the reactor coolant cold leg temperature exceeding its limit, restore the temperature to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.6 The reactor coolant cold leg temperature shall be determined to be within its limit at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
1
- See Special Test Exception 3.10.4.
- With K,ff greater than or equal to 1 PALO VERDE - UNIT 2 3/4 2-7 AMENDMENT NO. 55
i 1
i 1
E l
i I
I I
I i
i i
i i
g75 570 568 568 565 AREA OF ACCEPTABLE O MO e
@ 655 552 _
560 545 I
I f
I I
I l-1 I
i 0
10 20 30 40 50 60 70 80 90 100 CORE POWER LEVEL,% OF RATED THERMAL POWER FIGURE-3.2-1 REACTOR COOLANT COLD LEG TEMPERATURE vs. CORE POWER LEVEL l
!=
PALO VERDE - UNIT 2 3/4 2-8 AMENDMENT NO. -55, 65 -