Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073B259 + (09:05:46, 15 December 2024)
- ML20073B243 + (09:05:47, 15 December 2024)
- ML20073B238 + (09:05:48, 15 December 2024)
- RBG-40868, LAR 94-10 to License NPF-47,changing TS 3/4.2.2, APRM Setpoints in Order to Be Able to Operate Greater than 35% Rtp,Per Condition Identified During Review of GL 94-02 + (09:05:49, 15 December 2024)
- 05000443/LER-1994-011, :on 940621,contractor Mechanic Entered High Radiation Area W/O Possessing Alarming Dosimetry.Caused by Failure to Implement Self Checking.Radiation Worker Training Will Be Revised + (09:05:51, 15 December 2024)
- ML20073B207 + (09:05:52, 15 December 2024)
- ML20073B202 + (09:05:52, 15 December 2024)
- NLS9100241, Comment on NRC Proposed Amend to 10CFR50.55a Re Codes & Stds for Nuclear Power Plants.Suggests That Listed Comment Be Added to Proposed Rule to Clarify & Aid Licensees in Implementation of Rule + (09:05:53, 15 December 2024)
- ML20073B194 + (09:05:53, 15 December 2024)
- U-602345, Monthly Operating Rept for Aug 1994 for Clinton Power Station + (09:05:54, 15 December 2024)
- ML20073B176 + (09:05:55, 15 December 2024)
- ML20073B169 + (09:05:55, 15 December 2024)
- ML20073B125 + (09:05:56, 15 December 2024)
- ML20073B123 + (09:05:56, 15 December 2024)
- ML20073B122 + (09:05:57, 15 December 2024)
- ML20073B114 + (09:05:58, 15 December 2024)
- PLA-3568, Comments Supporting Proposed Rule 10CFR50 Incorporating 1986 -1988 Addenda & 1989 Editions of ASME Boiler & Pressure Vessel Code,Section Iii,Div 1 & Section Xi,Div 1,by Ref Into 10CFR50.55a + (09:05:58, 15 December 2024)
- ML20073B107 + (09:05:59, 15 December 2024)
- ML20073B111 + (09:05:59, 15 December 2024)
- ML20073B102 + (09:06:00, 15 December 2024)
- ML20073B089 + (09:06:01, 15 December 2024)
- ML20073B087 + (09:06:02, 15 December 2024)
- ML20073B082 + (09:06:02, 15 December 2024)
- ML20073B080 + (09:06:03, 15 December 2024)
- LIC-91-0063, Comment Opposing Proposed Rule 10CFR50 Incorporating 1986- 1988 Addenda & 1989 Editions of ASME Boiler & Pressure Vessel Code,Section Iii,Div 1 & Section Xi,Div 1,by Ref Into 10CFR50.55a + (09:06:04, 15 December 2024)
- 05000336/LER-1983-007-01, /01T-0:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Caused by Failure of Analysis to Consider Impact of Automatic Valves.Analyses Will Be Docketed Shortly + (09:06:05, 15 December 2024)
- ML20073B069 + (09:06:06, 15 December 2024)
- 05000445/LER-1991-009, :on 910321,automatic Isolation of Steam Generator Blowdown Occurred.Caused by Cognitive Personnel Error & Inadequate Procedural Guidance.Operations Shift Crew Counselled & Procedure Revised + (09:06:08, 15 December 2024)
- NRC-91-0034, Detroit Edison 1990 Annual Rept + (09:06:10, 15 December 2024)
- ML20073B061 + (09:06:10, 15 December 2024)
- ML20073B059 + (09:06:14, 15 December 2024)
- ML20073B053 + (09:06:14, 15 December 2024)
- ML20073B048 + (09:06:15, 15 December 2024)
- ML20073B045 + (09:06:16, 15 December 2024)
- ML20073B032 + (09:06:17, 15 December 2024)
- ML20073B033 + (09:06:17, 15 December 2024)
- ML20073B024 + (09:06:20, 15 December 2024)
- ML20073B019 + (09:06:22, 15 December 2024)
- ML20073B012 + (09:06:23, 15 December 2024)
- 05000445/LER-1991-011, :on 910322,oversight in Preparation of Temporary Mod Resulted in Failure to Meet Tech Spec Requirement.Caused by Personnel Error.Procedure Enhancement & Event Review Performed + (09:06:24, 15 December 2024)
- ML20073A999 + (09:06:25, 15 December 2024)
- 1CAN048301, Application for Tech Spec Change to License DPR-51,revising 830311 Submittal by Reformatting Acceptance Criteria Into Separate Section for Ease in Referencing & Clarifying Terminology + (09:06:26, 15 December 2024)
- ML20073A991 + (09:06:26, 15 December 2024)
- ML20073A990 + (09:06:27, 15 December 2024)
- 0CAN049111, 1990 Annual Financial Rept + (09:06:28, 15 December 2024)
- 05000370/LER-1994-003-06, :on 940815,required Operability Surveillance of Ac Offsite Sources Not Performed During Inoperability of DG Room Sump Pump 2B2 Associated W/Dg 2B Due to Improper Work Practices.Required Surveillance Performed + (09:06:30, 15 December 2024)
- ML20073A960 + (09:06:31, 15 December 2024)
- ML20073A970 + (09:06:31, 15 December 2024)
- ML20073A955 + (09:06:32, 15 December 2024)
- 05000244/LER-1983-010-03, /03L-0:on 830224,rod Position Indicator for Control Rod Bank SD Group 1 Position C09 Deviated from Control Bank SD by 12 Steps.Caused by Signal Error for Rod Position Indicator.Signal Adjusted to Correct Drift + (09:06:33, 15 December 2024)
- ML20073A935 + (09:06:34, 15 December 2024)