Mod of 820924 Final Deficiency Rept Re Transamerica Delaval Standby Diesel Generator ASME Code Piping Welds. Nonconformance Rept PO39-0477 Corrections Will Be Completed by 830701
ML20073B102
Person / Time
Site: Perry  
Issue date: 04/01/1983
From: Delman M, Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, RDC-52(82), NUDOCS 8304110944
Download: ML20073B102 (1)


Text

_

P.O.

EVELA, O Hlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE W

V' Serving The Best Location in the Nation g \\4 April 1, 1983

~

MURRAY R. EDEkgN g

gg,h EsioENT

{Ct

, g,__

_n

m, e

,n Mr. J eppler s

Regio a Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:

Perry Nuclear Power Plant Docket Nos 50-440;,50-441 g

Standby Diesel ~ Generator ASME,

Code Piping Welds [RDC 52(82)]

Dear Mr. Keppler:

This letter modifies our final report dated September 24, 1982, concerning Transamerica Delaval Standby Diesel Generator ASME Section III, Class 3 piping welds. Our interim report on this subject was submitted on April 28, 1982.

Due to the unanticipated complexity of the modification program undertaken.to implement the repair and/or rework required per Nonconformance Report P039-0477, a small portion of this activity has not yet been completed. After re-evaluation of the remaining activities and review of the progress made to date, we now estimate that completion of corrective action to resolve Non-conformance Report P039-0477 will be by July 1,1983.

Please call if there are additional questions.

Sincerely. /u E f 144 304110 4

0401 0

00440 Murray R. Edelman PDR ADO PDR Vice President G

Nuclear Group MRE:pab cc:

Mr. M. L. Gildne'r NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 h.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.

20555 b[

Records Center, SEE-IN

'T Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 ppg 4 gg

.