ML20073A955
| ML20073A955 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/18/1991 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 9104230443 | |
| Download: ML20073A955 (1) | |
Text
A!atum Power company
~40 invowss Center Pa%av -
r Post O' fee Box 1295 C
B<rm:ngnam, A!abama 35201
-E' hiepnone 2M 868 6066 e
m J. D. Woodard CL
/ MXimaPOWCT
{}
h h *,! q mr w A m c w e Vee Presdent-Nuc!ex U
reef erogo March 18, 1991 Docket No. 50-364 U. S. Nuclear Regulatory Comission, Region II ATTNt Regional Administrator 101 Marietta Street, N.W.,
Suite 2900 Atlanta, CA. 30323 Gentlemen:
Joseph M. Farley Nuclear Plant Equipment Out of Service Comitment During Diesel Generator Maintenance By letter dated February 28, 1991, Region II forwarded NRC Inspection Report Nos. 50-348/90-36 and 50-364/90-36. The cover letter states in part, "In a telephone conversation February 15, 1991, between Mr. D. Morey of your staff and Mr. F. Cantrell of this office, Mr. Morey comitted that
-Farley would not conduct any surveillance or scheduled maintenance on the opposite train of safety equipment when the emergency power supply to the other train is out of. service, and this comitment will remain in effect until this item is resolved.
If your understanding of this matter is different, please contact us promptly."
The above statement is not entirely correct and in a telephone conversation March 13,.-1991, between Mr.-D. Varelli and Mr. D. Morey, this description of the comitment was clarified and corrected. The comitment was that-until this issue is resolved, Alabama Power Company will not intentionally remove from service opposite train safety equipment while conducting annual maintenance on a diesel in the other train. The clarification being.
~
provided is that surveillances and maintenance do exist which do not result in removing equipment from service-and thus can be conducted on components in the opposite train from a diesel undergoing annual maintenance.
Mr.-
varelli agreed with this clarification.
.If there are any questions, please advise.
Respectfully submitted, ALABAMA POWER COMPANY
\\
Q
. Woodard JDW/ REM:sfj3348 cc:
Mr. S. D. Ebneter
.Mr. S. T. Hoffman Mr. G. F. Maxwell c, e n 9104230443 910318
- gP;J DR ADOCK 0500 4
j7-l g