Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073E637 + (08:54:51, 15 December 2024)
- ML20073E629 + (08:54:52, 15 December 2024)
- RBG-14-768, Final Deficiency Rept DR-102 Re Primary Shield Wall Pipe Rupture Restraint Structure Gusset Plate Laminations. Initially Reported on 830311.Load Capacity Unaffected by Laminations.Item Not Reportable Per 10CFR50.55(e) + (08:54:52, 15 December 2024)
- ML20073E625 + (08:54:53, 15 December 2024)
- ML20073E620 + (08:54:53, 15 December 2024)
- ML20073E613 + (08:54:54, 15 December 2024)
- ML20073E606 + (08:54:55, 15 December 2024)
- ML20073E611 + (08:54:55, 15 December 2024)
- B14924, Application for Amend to License DPR-65,addressing GL 90-06 & Related Topics + (08:54:56, 15 December 2024)
- ML20073E590 + (08:54:56, 15 December 2024)
- ML20073E588 + (08:54:57, 15 December 2024)
- ML20073E581 + (08:54:58, 15 December 2024)
- ML20073E571 + (08:55:00, 15 December 2024)
- ML20073E568 + (08:55:01, 15 December 2024)
- 05000313/LER-1983-007-03, /03L-0:on 830308,during Performance of Reactor Protection Sys Channel D Calibr,Reactor Bldg Pressure Switch PS-2403 Found Out of Tolerance.Caused by Instrument Drift. Switch Reset Per Reactor Protection Sys Procedure + (08:55:03, 15 December 2024)
- ML20073E564 + (08:55:04, 15 December 2024)
- 05000260/LER-1991-004-01, :on 910326,reactor Protection Sys Actuation Occurred During Testing.Cause Undetermined.Ground Fault in Intermediate Range Monitor Channel C Detector Cable Shield Removed + (08:55:05, 15 December 2024)
- 3F0994-06, Forwards Rev 1 to FPC Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment, to Fulfill Commitment in Attachment 1 to FPC Addressing USI A-46,as Required by GL 87-02 + (08:55:07, 15 December 2024)
- ML20073E526 + (08:55:08, 15 December 2024)
- 05000368/LER-1983-015-03, /03L-0:on 830308,containment Spray Actuation Sys (CSAS) Inadvertently Actuated.Caused by Defective K1523 Relay Controlling Trip Path 2 or 4 in Csas.Relay Replaced + (08:55:10, 15 December 2024)
- ML20073E503 + (08:55:11, 15 December 2024)
- ML20073E502 + (08:55:11, 15 December 2024)
- 05000368/LER-1983-015, Forwards LER 83-015/03L-0 + (08:55:12, 15 December 2024)
- RBG-14-766, Interim Deficiency Rept DR-87 Re Nonconforming Installation of Electrical Cable Tray & Support Sys Connection.Initially Reported on 821217.Evaluation Incomplete Pending Addl Info from Ae.Next Rept to Be Provided by 830602 + (08:55:12, 15 December 2024)
- ML20073E488 + (08:55:13, 15 December 2024)
- 05000368/LER-1983-019-03, /03L-0:on 830314,watchdog Timer Timed Out & Central Processing Unit Halted.Cause Not Determined.Unit Reinitialized + (08:55:14, 15 December 2024)
- 05000327/LER-1994-013, :on 940823,discovered SR 4.7.4.b.2 Which Verifies That Each ERCW Pump Starts Automatically on Safety Injection Test Signal Not Being Performed Per Ts.Caused by Inadequate Procedure Rev.Procedure Revised + (08:55:16, 15 December 2024)
- 05000368/LER-1983-019, Forwards LER 83-019/03L-0 + (08:55:17, 15 December 2024)
- ML20073E435 + (08:55:18, 15 December 2024)
- ML20073E434 + (08:55:19, 15 December 2024)
- ML20073E433 + (08:55:19, 15 December 2024)
- ML20073E422 + (08:55:20, 15 December 2024)
- ML20073E419 + (08:55:21, 15 December 2024)
- ML20073E413 + (08:55:21, 15 December 2024)
- 05000280/LER-1991-002-02, :on 910326,two Charging Pumps & One Charging Pump Svc Water Pump Inoperable Causing Instrument Air Failure.Caused by Personnel Error.Charging Pump Returned to Svc + (08:55:25, 15 December 2024)
- ML20073E386 + (08:55:26, 15 December 2024)
- ML20073E381 + (08:55:27, 15 December 2024)
- ML20073E309 + (08:55:28, 15 December 2024)
- ML20073E369 + (08:55:28, 15 December 2024)
- ML20073E304 + (08:55:29, 15 December 2024)
- PY-CEI-NRR-1849, Amends 940408 Response to GL 89-10,Suppl 6 to Include Info Obtained as Result of Refueling Outage 4 Activities.Gl 89-10 MOV Testing Schedule Extension & Application of Grouping Methodology,Bases & Justification Encl + (08:55:30, 15 December 2024)
- ML20073E289 + (08:55:31, 15 December 2024)
- ML20073E290 + (08:55:31, 15 December 2024)
- ML20073E284 + (08:55:32, 15 December 2024)
- ML20073E275 + (08:55:32, 15 December 2024)
- ML20073E272 + (08:55:33, 15 December 2024)
- ML20073E268 + (08:55:34, 15 December 2024)
- ML20073E259 + (08:55:34, 15 December 2024)
- ML20073E251 + (08:55:35, 15 December 2024)
- ML20073E249 + (08:55:35, 15 December 2024)
- ML20073E246 + (08:55:36, 15 December 2024)