Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073S968 + (08:16:19, 15 December 2024)
- ML20073S966 + (08:16:21, 15 December 2024)
- 05000219/LER-1994-007, :on 940531,reactor Scram Occurred Due to Modification Work in Switchyard.Placing Modification on Hold Pending Engineering Review & Strengthening Procedural Controls Over Switchyard Work + (08:16:23, 15 December 2024)
- ML20073S954 + (08:16:24, 15 December 2024)
- ML20073S961 + (08:16:24, 15 December 2024)
- ML20073S947 + (08:16:25, 15 December 2024)
- NRC-94-4184, Forwards Responses to NRC RAIs on AP600 from NRC 940316, 0419,29,0502,11,12,23 & 26 Ltrs.Revs of Responses Previously Submitted Also Provided,Completing Responses for NRC + (08:16:27, 15 December 2024)
- ML20073S941 + (08:16:28, 15 December 2024)
- ML20073S930 + (08:16:28, 15 December 2024)
- L-83-274, Final Deficiency Rept Re Loss of Continuity on Mineral Insulated Cable Assemblies.Initially Reported on 830330. Twenty-three Cable Assemblies W/Defective Connectors Repaired.Deficiencies Not Reportable Per 10CFR50.55(e) + (08:16:29, 15 December 2024)
- ML20073S928 + (08:16:29, 15 December 2024)
- ML20073S913 + (08:16:30, 15 December 2024)
- ML20073S896 + (08:16:31, 15 December 2024)
- ML20073S888 + (08:16:33, 15 December 2024)
- ML20073S881 + (08:16:34, 15 December 2024)
- ML20073S882 + (08:16:34, 15 December 2024)
- ML20073S880 + (08:16:35, 15 December 2024)
- ML20073S878 + (08:16:36, 15 December 2024)
- ML20073S879 + (08:16:36, 15 December 2024)
- ML20073S867 + (08:16:37, 15 December 2024)
- ML20073S877 + (08:16:37, 15 December 2024)
- ML20073S864 + (08:16:38, 15 December 2024)
- ML20073S859 + (08:16:39, 15 December 2024)
- ML20073S858 + (08:16:39, 15 December 2024)
- 05000454/LER-1992-004-01, :on 920701,station Received Operability assessment,ENC-QE-40.1,regarding Bdps Due to Inadequate Safety Analysis & Subsequent Review for Bdps.Special Operating Order Was Revised + (08:16:41, 15 December 2024)
- ML20073S852 + (08:16:43, 15 December 2024)
- ML20073S846 + (08:16:44, 15 December 2024)
- ML20073S849 + (08:16:44, 15 December 2024)
- ML20073S842 + (08:16:45, 15 December 2024)
- ML20073S840 + (08:16:46, 15 December 2024)
- ML20073S837 + (08:16:47, 15 December 2024)
- ML20073S836 + (08:16:47, 15 December 2024)
- ML20073S835 + (08:16:48, 15 December 2024)
- ML20073S829 + (08:16:49, 15 December 2024)
- ML20073S828 + (08:16:50, 15 December 2024)
- ML20073S825 + (08:16:51, 15 December 2024)
- ML20073S824 + (08:16:52, 15 December 2024)
- LIC-94-0136, Revises C/A Noted in & Clarifies Relationship to C/A Noted in in Response to Violation Re Personnel Entering RCA W/O Proper Dosimetry.Revised Design & New Schedule for Upgrading RCA Access Process Developed + (08:16:53, 15 December 2024)
- ML20073S821 + (08:16:53, 15 December 2024)
- ML20073S816 + (08:16:54, 15 December 2024)
- ML20073S817 + (08:16:54, 15 December 2024)
- 05000373/LER-1994-009-04, :on 940603,high Suction Flow Isolation Was Received Shortly After Starting 1B RHR Pump,Isolating SDC System Due to Procedural Deficiencies.Tailgate Sessions to Be Held & Equipment Revised + (08:16:56, 15 December 2024)
- ML20073S811 + (08:16:57, 15 December 2024)
- ML20073S809 + (08:16:58, 15 December 2024)
- ML20073S810 + (08:16:58, 15 December 2024)
- ML20073S805 + (08:17:01, 15 December 2024)
- B14788, Application for Amend to License DPR-65,revising TS Re ESFAS Instrumentaion + (08:17:02, 15 December 2024)
- 05000364/LER-1983-019-03, /03L-0:on 830404 & 19,rod Control Sys Declared Inoperable Upon Receipt of Failure Alarm on Power Cabinet 2AC.Following Second Occurrence,Phase Control Card B2 Replaced + (08:17:07, 15 December 2024)
- ML20073S799 + (08:17:08, 15 December 2024)
- ML20073S796 + (08:17:09, 15 December 2024)
- ML20073S797 + (08:17:09, 15 December 2024)