Reports Withdrawal of Fifth Surveillance Capsule (Capsule 5) from Point Beach Nuclear Plant,Unit 1.Surveillance Capsule Removed from Holder on Reactor Vessel Thermal Shield on 940409
ML20073S821
Person / Time
Site: Point Beach 
Issue date: 06/29/1994
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-94-044, CON-NRC-94-44 VPNPD-94-065, VPNPD-94-65, NUDOCS 9407060260
Download: ML20073S821 (2)


Text

e.

Wisconsin

'liiectnc POWER COMPANY 231 W Michgan. Po Box 204$. Mdaoukee W $32012046 1414) 221 2345 VPNPD-94-065 NRC-94-044 June 29, 1994 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKET 50-266 REMOVAL OF FIFTH SURVEILLANCE CAPSULE POINT BEACH NUCLEAR PLANT. UNIT 1 In accordance with the requirements-of 10 CFR 50 Appendix H,

" Reactor Vessel Material Surveillance Program Requirements,"

Wisconsin Electric Power Company-(Licensee).hereby reports the withdrawal of the fifth surveillance capsule (Capsulo P) from the Point Beach Nuclear Flant (PBJP), Unit 1.

The surveillance capsule was removed from its holder on the reactor vessel thermal shield on April 9, 1994.

10 CFR 50 Appendix H opecifies that reactor vessel surveillance programs be established and-conducted in accordance with ASTM E 185-82.

This-ASTM standard provides the minimum requirements for reactor vessel surveillance programs, including requirements for testing.

In accordance with ASTM E 185-82, PBNP Unit 1 is required to withdraw a minimum of five surveillance capsules; four over the life of the vessal and the fifth at the end of life (EOL) or at an accumulated fluence equivalent to one to.two times the EOL vessel fluence.

The materials in the first four capsules must be tested, but the ASTM standard allows the fifth-capsule to be hold without testing following removal.

Surveillance Capsule P is the fifth capsula to be withdrawn from PBNP Unit 1.

It has received ar stimated fluence of approximately 3.2x10" n/cm ( E > 1. 0 M ot ",

Thie iuence is equivalent to 2

.i

.~~-

94070MC60 940629 s

PDR ADOCK 05000266 I 0 p

PDR q

A subsximofHisivah Exqs Gqmtkw j

]

e 4

.-a Document Control Desk June 29, 1994 Page 2 i

approximately 1.3 times the projected peak vessel beltline fluence at EOL of 2.43x10" n/cm.

This capsule will be stored at PBNP 2

withoat testing.

Please contact us should you have any questions regarding this submittal.

Sincerely, e ~~ - f Bob Link Vice President Nuclear Power JRP/kmc NRC Regional Administrator, Region III cc: