ML20073S796

From kanterella
Jump to navigation Jump to search
Forwards Marine Ecology Studies Re Operation of Pilgrim Station,Semiannual Rept 21,1982
ML20073S796
Person / Time
Site: Pilgrim
Issue date: 04/29/1983
From: Harrington W
BOSTON EDISON CO.
To:
ENVIRONMENTAL PROTECTION AGENCY, MASSACHUSETTS, COMMONWEALTH OF
Shared Package
ML20073S798 List:
References
NUDOCS 8305100138
Download: ML20073S796 (2)


Text

,-

52 - F/ 9 COLTON EHIOON COMPANY 500 80VLaTON STRErr j'

% Omnyg.

BOSTON. MASSACHUSETTS 0219 Nk MN WILLIAM D. NARRlNGTON N/,' ;_3-3,.. ~...,

April 29, 1983 U.S. Environmental Protection Agency Region I Permits Processing Unit Room 2109, JFK Federal Building Boston, MA 02203

Dear Sir:

In accordance with Part I, Paragraph A.7.b, of the Pilgrim Nuclear Power Station NPDES Permit No. MA0003557, the Semi-Annual Marine Ecology Report No. 21 is hereby submitted.

This report covers the period from January through December,1982.

Ver truly you

~

\\

)

o

\\

L cc:

Regional Administrator U.S. Environmental Protection Agency Region I John F. Kennedy Federal Building l

Boston, MA 02203 830510013e 830429

/

DR ADOCK 05000 Af

COCTON EDIOUN COMPANY DESIGNATED ORIGI. D. -

ion movtarow armser g

sonrow. Massacwuscrre omis, g61'tified 3 7

-#x wituaw o. wanniwerow ff

..s.........

65f3 ax==

April 29, 1983 I

I Mass. Division of Water Pollution Control Permit Section - 7th Floor One Winter Street Boston, MA 02108

Dear Sir:

In accordance with Part I, Paragraph A.7.b, of the Pilgrim Nuclear Power Station NPDES Permit No. MA0003557, the Semi-Annual Marine Ecology Report No. 21 is hereby submitted. This report covers the period from January through December,1982.

Ve y trul g rs,

\\,

h g

LN O N

\\

Mass. Division of Water Pollution Control cc:

Lakeville Hospital Lakeville, MA 02203 h

o.^

d

--