Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-15-117, Interim Deficiency Rept DR-101 Re Undersized Fillet Welds on Nf Pipe Supports.Initially Reported on 830223.Addl Info from Util Ae Awaited.Next Rept Will Be Submitted by 830808 + (07:46:02, 15 December 2024)
- ML20076F108 + (07:46:03, 15 December 2024)
- ML20076F109 + (07:46:03, 15 December 2024)
- NG-94-3444, Forwards Revised FFD Program Performance Info for DAEC for Jan-June 1994,reflecting Correction Made to Synopsis on Attachment + (07:46:05, 15 December 2024)
- ML20076F103 + (07:46:06, 15 December 2024)
- ML20076F101 + (07:46:09, 15 December 2024)
- RBG-40915, Addresses Question Raised by NRC During 940928 Telcon Re 940912 Submittal of LAR 94-10,changing TS 3/4.2.2, APRM Setpoints + (07:46:09, 15 December 2024)
- ML20076F099 + (07:46:10, 15 December 2024)
- ML20076F093 + (07:46:12, 15 December 2024)
- ML20076F089 + (07:46:15, 15 December 2024)
- ML20076F088 + (07:46:16, 15 December 2024)
- ML20076F080 + (07:46:18, 15 December 2024)
- ML20076F076 + (07:46:20, 15 December 2024)
- ML20076F074 + (07:46:21, 15 December 2024)
- ML20076F071 + (07:46:22, 15 December 2024)
- ML20076F073 + (07:46:22, 15 December 2024)
- 05000369/LER-1983-020-01, /01T-0:on 830503,soap Bubble Test of 47 Secondary Containment Bypass Leakage Paths Not Performed During Initial Integrated Leak Rate Test.Caused by Procedural Deficiency.Procedures Revised + (07:46:24, 15 December 2024)
- ML20076F064 + (07:46:25, 15 December 2024)
- ML20076F059 + (07:46:28, 15 December 2024)
- 05000327/LER-1983-057-03, /03L-0:on 830426,subcooling Margin Monitor Declared Inoperable Due to Plant Process Computer Failure. Caused by Power Failure.Computer Supplied by Maint Power While Inverter Repaired + (07:46:29, 15 December 2024)
- ML20076F055 + (07:46:30, 15 December 2024)
- ML20076F049 + (07:46:33, 15 December 2024)
- ML20076F052 + (07:46:33, 15 December 2024)
- RBG-15-116, Interim Deficiency Rept DR-73 Re Improperly Installed Spring Nuts in GE Power Generation Control Complex Termination Cabinets.Initially Reported on 820902.GE Evaluation Awaited.Next Rept Due by 830805 + (07:46:34, 15 December 2024)
- TXX-3674, Forwards,For Review,Revised Page from Chapter 17.1 of Fsar.Change (Amend 40) Adds More Specific Commitment Re QA Program,Per Encl NRC 830307 Request + (07:46:39, 15 December 2024)
- ML20076F041 + (07:46:40, 15 December 2024)
- ML20076F036 + (07:46:42, 15 December 2024)
- ML20076F033 + (07:46:43, 15 December 2024)
- ML20076F032 + (07:46:43, 15 December 2024)
- ML20076F030 + (07:46:45, 15 December 2024)
- ML20076F029 + (07:46:46, 15 December 2024)
- ML20076F028 + (07:46:47, 15 December 2024)
- ML20076F027 + (07:46:47, 15 December 2024)
- BSEP-83-1618, Ro:On 830509,main Condenser Steam Jet Air Ejector Offgas Radiation Monitors a & B Failed to Indicate Power Level. Caused by Closure of Root Isolation Valves to Each Monitor. Shift Personnel Counseled + (07:46:48, 15 December 2024)
- ML20076F022 + (07:46:48, 15 December 2024)
- AECM-83-0486, Forwards Negotiated Schedule for Emergency Response capability.NUREG-0737,Suppl 1 Sections & 830413 Proposed Integrated Schedule Task Descriptions Referenced to Clarify Actions to Be Performed + (07:46:51, 15 December 2024)
- ML20076F020 + (07:46:51, 15 December 2024)
- ML20076F016 + (07:46:52, 15 December 2024)
- ML20076F012 + (07:46:53, 15 December 2024)
- ML20076F011 + (07:46:54, 15 December 2024)
- ML20076F005 + (07:46:55, 15 December 2024)
- ML20076F002 + (07:46:56, 15 December 2024)
- 05000387/LER-1983-104-03, /03L-0:on 830717,emergency Outside Air Intake High Radiation Alarm Received in Main Control Room.Caused by One Channel Detector Drifted High Due to Failure of Gm Tube. Gm Tube Replaced,Calibr & Retested + (07:46:57, 15 December 2024)
- ML20076F000 + (07:46:58, 15 December 2024)
- 2CAN088314, Forwards Proprietary IAEA Design Info Questionnaire & Matl Balance Rept for Apr-Jul 1983.Installation Info to Be Transmitted to IAEA for Use in Safeguards Insp of Facility, Per .Encl Withheld + (07:46:59, 15 December 2024)
- ML20076E999 + (07:46:59, 15 December 2024)
- ML20076E995 + (07:47:00, 15 December 2024)
- ML20076E994 + (07:47:01, 15 December 2024)
- ML20076E988 + (07:47:02, 15 December 2024)
- ML20076E985 + (07:47:03, 15 December 2024)
- TAC:52103 + (07:47:04, 15 December 2024)