Forwards Rev 2 to Siet Document 00006.QQ-92, Quality Plan Relative to Nuclear Area Orders, as Requested During 940907 Telcon.Plan Is QA Plan Used on Panthers
ML20076F029
Person / Time
Site: 05200004
Issue date: 09/08/1994
From: Buchholz R
GENERAL ELECTRIC CO.
To: Borchardt R
Office of Nuclear Reactor Regulation
Shared Package
ML19353C490 List:
References
MFN-107-94, NUDOCS 9409140341
Download: ML20076F029 (3)


Text

,

O-Q)

GENuclear Energy 6-

$ 1T $ bges 5$u

$C 781 San. Jose, CA 9512S1014 Ad 406 92S 6948(phone) 4069251193(bcsmb)

September 8,1994 MFN No.107-94 Docket STN 52-004 Document Control Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention:

Richard W. Borchardt, Director Standardization Project Directorate

Subject:

PANTHERS QA PIAN

Reference:

Phonecon, R. P. McIntyre (NRC) to P. F. Billig (GE),

September 7,1994 This letter transmits a copy of SIET Document No. 0000f>QQ92,, Job No. EN-SB-03, which is the QA Plan used on PANTHERS, as requested during the referenced telephone call. If you have any questions regarding this document, please call Paul Billig on (408) 925-1388.

Sincercly, IS OY a

R. H. Buchholz, Acting Manager bM Advanced Plant Technologies

Enclosure:

SIET Document No. 00006-QQ92

,j hn f P. A. Bochnert (w/1 copy of Enclosure)

O cc:

(/

  • d, $ p. g F. W. Hasselberg (w/1 copy of Enclosure)

M. Malloy (w/2 copies of Enclosure)

R. P. McIntyre (w/l copy of Enclosure)

QG0078 h

g azar f

FDFf~~ADUC(1 W40908 XA f

40914034 p%D[

/ L f 'l f'DI DO@M 05200004

F I -

1 y

September 23, 1994 e

NOTE T0: -James McKnight Document Management Branch, IRM FROM:

Melinda Malloy, Project Manager

'6 Standardization Project Directorate,-NRR

SUBJECT:

CORRESPONDENCE TO BE REPROCESSED' Attached is a copy of correspondence dated September 8,1994,.from GE-Nuclear Energy which was incorrectly processed uader Docket No.52-002. The correct docket number is52-004, as shown under the MFN No. in the upper right hand corner of-the transmittal -letter from GE.

Please reprocess the document to correct the official files and NRC staff distribution.

Enclosed for.your.

use is a complete copy of the letter.

Should you have any questions, please-l contact me at 504-1178.

Attachment:

MFN No. 107-94 dtd 9/8/94 from GE (Docket'No.52-004)

Distribution (w/o att.):

PDST Reading MMalloy.

TWambach/MFranovich/SMagruder JNWilson r

l l

,r

November 25, 1994 P

NOTE T0: James McKnight 7

Document Management Branch, IRM V

FROM:

Melinda Malloy, Project Manager Lt Standardization Project Directorate, N

SUBJECT:

CORRESPONDENCE TO BE REPROCESSED Attached is a copy of correspondence dated September 8, 1994, from GE Nuclear Energy, Accession No. 9409140341, that needs to be reprocessed to place the enclosure in the PDR.

GE has advised me that it does not need to be withheld.

Should you have any questions, please contact me at 504-1178.

Attachment:

MFN No. 107-94 dtd 9/8/94 from GE (Docket Nn.52-004)

Distribution (w/o att.):

PDST Reading MMalloy JHWilson JNWilson i

i

.