Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076G766 + (07:38:59, 15 December 2024)
- ML20076G730 + (07:39:00, 15 December 2024)
- ML20076G701 + (07:39:00, 15 December 2024)
- 05000362/LER-1983-050-03, /03L-0:on 830717,outer Containment Airlock Door Jammed in Open Position.Caused by Broken Cam Follower.Cam Follower Replaced + (07:39:02, 15 December 2024)
- ML20076G693 + (07:39:03, 15 December 2024)
- PLA-1774, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-14.Corrective actions:AD-QA-302 Sys Status & Equipment Control Revised to Specify That Sys Status File Must Be Reviewed Prior to Declaring Sys Operable + (07:39:03, 15 December 2024)
- ML20076G690 + (07:39:04, 15 December 2024)
- 05000361/LER-1983-082-03, /03L-0:on 830718,supervisory Trouble Alarm Sounded Involving Fire Detection Panel 2/3L-236.Caused by Inadvertent Circuit Interruption by Contract Electrician. Circuit Repaired + (07:39:06, 15 December 2024)
- ML20076G676 + (07:39:07, 15 December 2024)
- ML20076G679 + (07:39:07, 15 December 2024)
- ML20076G666 + (07:39:09, 15 December 2024)
- ML20076G664 + (07:39:10, 15 December 2024)
- ML20076G663 + (07:39:12, 15 December 2024)
- ML20076G656 + (07:39:13, 15 December 2024)
- ML20076G648 + (07:39:14, 15 December 2024)
- BECO-LTR-94-108, Informs That Util Will Submit Listed Addl Info Re Pilgrim Core Shroud Assessment on 941014,in Response to NRC RAI During 941004 Meeting.Info Will Provide Further Support of Util Plans to Implement pre-emptive Repair in RFO 10 + (07:39:15, 15 December 2024)
- ML20076G637 + (07:39:15, 15 December 2024)
- ML20076G609 + (07:39:16, 15 December 2024)
- ML20076G608 + (07:39:17, 15 December 2024)
- ML20076G601 + (07:39:18, 15 December 2024)
- ML20076G598 + (07:39:19, 15 December 2024)
- ML20076G597 + (07:39:20, 15 December 2024)
- ML20076G591 + (07:39:21, 15 December 2024)
- ML20076G593 + (07:39:21, 15 December 2024)
- ML20076G583 + (07:39:22, 15 December 2024)
- ML20076G580 + (07:39:25, 15 December 2024)
- ML20076G575 + (07:39:26, 15 December 2024)
- ML20076G577 + (07:39:26, 15 December 2024)
- ML20076G568 + (07:39:27, 15 December 2024)
- BSEP-94-0409, Monthly Operating Repts for Sept 1994 for Brunswick Steam Electric Station + (07:39:29, 15 December 2024)
- ML20076G564 + (07:39:29, 15 December 2024)
- ML20076G561 + (07:39:30, 15 December 2024)
- ML20076G556 + (07:39:31, 15 December 2024)
- ML20076G550 + (07:39:32, 15 December 2024)
- ML20076G553 + (07:39:32, 15 December 2024)
- ML20076G544 + (07:39:33, 15 December 2024)
- RC-94-0264, Forwards Completed Operator Licensing Exam & Requalification Schedules for Vsns,Estimating Exams Through FY98,in Response to Administrative Ltr 94-12.Info Requested for Generic Fundamentals Exam Also Provided + (07:39:33, 15 December 2024)
- PY-CEI-NRR-1853, Requests Cancellation of Sol SOP-30455-2,held by Js Mikolaj. Mikolaj Reassigned to Position for Which Current Sol Not Needed + (07:39:35, 15 December 2024)
- ML20076G540 + (07:39:35, 15 December 2024)
- 05000293/LER-1983-041-03, /03L-0:on 830713 & 15,latch on Fire Doors 162 & 105,respectively,found Inoperable.Caused by Normal Wear. One Latch Mechanism Required Adjustment.Second Latch Replaced + (07:39:37, 15 December 2024)
- RC-94-0267, Responds to Violations Noted in Insp Rept 50-395/94-19. Corrective Actions:Sys Operating Procedure 119, Waste Gas Processing, Revised on 940902 to Verify Proper Position of Sys Valves Prior to Tank Release + (07:39:38, 15 December 2024)
- ML20076G499 + (07:39:38, 15 December 2024)
- BSEP-83-1438, Ack Receipt of IE Insp Repts 50-324/83-05 & 50-325/83-05 & Notice of Violation.Response to Rept Will Be Submitted by 830520 + (07:39:39, 15 December 2024)
- ML20076G491 + (07:39:40, 15 December 2024)
- ML20076G487 + (07:39:41, 15 December 2024)
- ML20076G482 + (07:39:42, 15 December 2024)
- 05000361/LER-1983-041-07, /07L-0:on 830429,documentation Could Not Be Located Indicating Operability Testing,Including Testing Required by Inservice Insp & Testing Program.Caused by Inadequate Administrative Controls + (07:39:43, 15 December 2024)
- LD-83-050, Part 21 Rept Supplementing 830506 Notification of Potential Significant Safety Hazard Re Matl Defects in Stainless Steel Tubing Pressure Boundary Component.Ultrasonic Exam Shows Assemblies Acceptable Per ASME Code,Section III + (07:39:44, 15 December 2024)
- ML20076G470 + (07:39:45, 15 December 2024)
- BSEP-83-1417, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/83-05 & 50-325/83-05.Corrective Actions: Operating Procedures Revised to Accurately Reflect Desired Position of Fuel Oil Manual Fill Valves + (07:39:46, 15 December 2024)
- ML20076G465 + (07:39:46, 15 December 2024)
- ML20076G463 + (07:39:47, 15 December 2024)