ML20076G553

From kanterella
Jump to navigation Jump to search
Documents 941007 Telcon Request for Extension of Required Response Date Re Violations Noted in Insp Repts 50-413/94-17 & 50-414/94-17.Util Granted 30-day Extension & Will Provide Response by 941108
ML20076G553
Person / Time
Site: Catawba  
Issue date: 10/07/1994
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9410200070
Download: ML20076G553 (2)


Text

c i

\\

Il I

Duke Power Company D L Ron Catau ba Nuclear Generatton Department Vice President 4300 Concord Road (803}8313205 Othce n rk, SC29NS (803.kUI3426 Fax i

DUKEPOWER 1

l October 7,1994 l

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk l

Washington, D.C. 20555 l

Subject:

Catawba Nuclear Station, Units I and 2 Di>cket Nos. 50-413 and 50-414 Inspection Report Nos. 50-413/94-17 and 50-414/94-17 l

Request for Extension of Required Response Date i

Gentlemen:

This letter documents a telephone conversation which was held on October 7,1994 between M.E.

Patrick of Catawba Nuclear Station and T.A. Peebles of NRC Region II. In the conversation, l

Catawba requested and was granted a 30-day extension to the required response date pertaining to the violations cited in the subject report. Therefore, Catawba will provide a response by November 8,1994.

Veq truly your

{

D.L. Rehn l

LJR/s l

xc:

S.D. Ebneter, Regional Administrator l

Region 11 R.J. Freudenberger, Senior Resident inspector R.E. Martin, Senior Project Manager ONRR 9410200070 941007 f 0 PDR ADOCK 05000413 D

PDR iwemamn

Docqment Control Desk Pa'ge 2 October 7,1994 bxc:

ELL Z.L. Taylor L.J. Rudy NCMPA-1 NCEMC PMPA SREC Master File CN-815.01 IR File 94-17 1

l