Monthly Operating Rept for May 1983
ML20076G730
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/02/1983
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8306160119
Download: ML20076G730 (9)


Text

-

OPERATING DATA REPORT O

DOCKET NO. -

DATE 6 /n? / R1 COMPLETED BY V c na4rston IIT '

TELEPHONE (205) 899-515d s

OPERATING STATUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2 May, 1983

1) Cumulative data since
2. Reporting Period:

2652

3. r *-==d Thermal Power (MWt):

7/30/81, date of

4. Nameolate Rating (Gross MWe):

R6n commercial operation.

5. Design Electrical Rating (Net MWe):

829 854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

- 9. Power Level To Which Restricted,If Any (Net MWe):

N /^

10. Reasons For Restrictions,if Any:

N/A 1

His Month Yr..to.Date Cumulative 744 3623 16,104

11. Hours In Reporting Period
  1. 44
12. Number Of Hours Reactor Was Critical m

y,m 5

13. Reactor Reserve Shutdown Hours 0

0 138.4 744 3623 14.225.4

14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0

0 0'

1,970,049 9,585,614 35,007,428

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)

A?1 nsn

, nan i19 11_7a,,A6

18. Net Electrical Energy Gecerated (MWH) 591.396 2.913.074 11.129.124
19. Unit Service Factor 100.0 100.0 88.3 100.0 100.0 i
20. Unit Availabili:y Factor oo.,

97*7 AA'E

21. Unit Capacity Factor (Using MDC Net) -

on n

22. Unit Capacity Factor (Using DER Net) 9s.9 97.0 81.4 0.0 0.0 5.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:

Refueling outage; September, 1983 N/A

25. If Shut Down At End Of Report Period. Estimated Dsts of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

$/06/81 5/08/81

/

INITIAL CRITICALITY k

INITIAL ELECTRICITY 5/24/81 5/25/81 8/01/81 7/30/81.

COMMERCIAL OPERATION G

8306160119 830602 gll PDR ADOCK 05000364 (u/77, j

R PDR

i DOCPlTNO.

50-364 UNIT l

6/02/83 DATE COMPLETED SY W. G.Hairston, III (205) 899-5156 TELEPHONE

~

4

~N St0NTil DAY AVERACE DAILY POWER LEVEI.

DAY AVERACE DAILY POWER LEVEL.

OfWe-Net)

@lWe Net) 800 799 g.7 M

800 gg 799 788 3

g9 80 4 790 4

806 21 794 3

800 779 6

g 799 791 7

3 792 24

  • 794 g

799 9

801 3-790 798 10 26 796 27 796 11

[2 796 3

7pn 796 791 l3 791 30 g4 792 l

15 789 3g 793 16 i

I?GUCTIONS On this for-n:t. list the svenp d:!v unit puwer !cvelin MWe Net for e:ch ty in the reporting munth. Compute to

, the ne:re:t whole mepwatt.

(9/77) 1

O 3

C 30-364 UNITSilUTDOWNS AND POWER REDUCHONS DOCKET NO.

UNIT NAME J.M.Farley-Unit 2 DATE 6/02/83 COMPLETED BY W.G. Hairston, III REPORT MONTil MAY TELEPilONE (205) 899-5156 v.

's 5

3 c

r.

No*

Date E.

'S _N

'8 ~g ocSU Li'#" #

g4 Cause & Cussective Event

y
o. ]

Acigo, g, yo a

.c M

u 5

OE 5

j$

Repassa #

Ps< vent Recussence TilERB WERE NO UNIT SilUTDOM iS OF SIGNI 'ICANT POWER (EDUCT 2 ONS IN T IE MONTil 0F MAY.

l l

I 2

3 4

F: l'usced Reason:

Meshod:

Exhibit G-losituctions S; Stheduled A-Equipsnent Failuse(Explain) 1 Manual for Psepasanion of Data ll Maintenance of Test 2 Manual Scrani.

Entsy Sheets for 1.icensee C Refucling 3-Automatic Scsani.

Event Repius (i.ER) File INUREG-D Regulasiuy Itcsisiccion 4 Oshes (Explain) 01611 E-Opesanos Tsaining & license Exandnation F.Adudaisi:asive 5

G Opesational Essur (Explaisi)

Exhthit ! - Same Sousee 19/77) ll Othes (Explain)

'9.

-i JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1983 The Unit experienced no shutdowns or significant power reductions during the month of May.

In addition to items previously reported, the following safety-related maintenance was performed in April.

1.

Performed preventive maintenance (MP28.114)'on reactor trip breakers.

2.

Reactor trip breaker undervoltage devices were replaced.

3.

Critical dimensions were measured on both new and old undervoltage devices.

The.following safety-related maintenance was performed in the month of May:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Replaced broken follower-roller on IC charging pump breaker charging spring assembly.

3.

Replacement of HFA relays.

4.

Adjusted packing on containment spray pump suction valve Q2E13V012A.

5.

Repacked #2 and #3 river water pumps.

6.

Repaired leak in TDAFWP drain valve Q2N12V3608.

OPERATING DATA REPORT DOCKET NO.

DATE 6In?/R1 COMPLETED BY V c th4mton$

III TELEPHONE (2051 899-515 s

OPERATING STATUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period: May, 1983
1) Cumulative data since 2652
3. Licensed Thermal Power (MWt):

7/30/81, date of RAn

4. Nameplate Rating (Gross MWe):

commercial operation.

5. Design Electrical Rating (Net MWe):

829 854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted,if Any (Net MWe):

M /^

10. Reasons For Restrictions. If Any:

N/A This Month Yr.-to.Date Cunsulative 744 3623 16,104

11. Hours in Reporting Period 744
12. Number Of Hours Reactor Was Critical 7677 i r., n7_5 i
13. Reactor Reserve Shutdown Hours 0

o iag.4

14. Hours Generator On-Line 744 3623 14.225.4
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1,970,049 9,585,614 35,007,428
17. Gross Electrical Energy Generated (MWH)

A91 Asn a nan 11?

11 m uA

18. Net Electrical Energy Generated (MWH) 591.196 2.913.074 11.129.124
19. Unit Service Factor 100.0 100.0 88.3 100.0 100.0
20. Unit Availability Factor oo,

97*7 AA~5

21. Unit Capacity Factor (Using MDC Net) on a
22. Unit Capacity Factor (Using DER Net) os o 97.0 s1.4
23. Unit Forced Outage Rate 0.0 0.0 5.8
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eschi:

Refueling outage; Se p temb er, 1983 N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY S/06/81 5/08/81 e

INITIAL ELECTRICITY 5/24/81 5/25/81 8/01/81 7/30/81 COMMERCIAL OPERATION (907:

DOCKIT NO.

50-364 UNIT -

t 6/02/83 DATE COMPLETED SY W. G.Hairston. III (205) 899-5156 TEWHONE s

410NTl!

MAY DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net)

(\\twe. Net) 800 799

[

l7 791 800 2

gg 799 788 3

g9 804 790 4

gg 806 21 744 3

800 779 6

n 799 791 7

23 8

792 24 -

794 799 9

801 25-794 10 26 798 796 27 796 11 12 746 3

yan 796 791 13 3

0 791 30 14 792 15 789 31 f

16 793 l

E l

L*GTRtJG10N5 On this form:. list the :ve-sg: d:ily unit puwer !cvelin MWe. Net for c:ch :1:y in the reporting month. Campute o

, the neare:t whule mepwast.

t l

(997)30-364 UNITSilU1 DOWNS AND POWER REIMICHONS DOCKET No.

UNIT NAME J.M.Farley-Unit 2 i

DATE 6/02/83 REPORT MONTil MAY COMPLETED BY W.G. Hairston, III TELEPHONE (205) 899-5156 w.

's ui 5 3

i e

c.

Lkensec 5%

g4 Cause & Cusicceive N"-

D

"E

'E I 5

~8.g g ga

.c 5 ac Event

r. T o3 Action su NG U

Ob Od fi$j N8h5'MI #

p,,,,,,g,c,,,,ucc 6

1 TilERB WERE NO lJNIT SHUTDOW1 ;S OR SIGNI FICANT POWER (EDUCTI ONS IN T IE MONTH OF MAY.

I 2

3 4

F: Forced Reason:

Method:

Exhibia G. Int,ssuctions i

S: S(lieduled A Equipniens Failure (Explain) 14tanual for Psepasanitui of Data ll41aintenance of Test 2 Manual Sesam.

Ent y Sheess for I.icensee C Itcfueling 3 Automalic Scram.

Event Repius (1.ER) file (NUNI G-D-Itegulas.ny itesisiction 4-Oslics (Emplain) 0161)

E-Opcsator Tsaining & license Examination F-Adminissoasive 5

G Opcsatiosial Esnos (Explain) thlabia 1 - Same Sousec

('s/71) 11 Othes (E aplain)

-a

Malling Address Allb:ms Power Company 600 North 18th Street Po:t Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-606)

F. L Clayton, Jr.

gar ;g%7"'

AlabamaPbwer g

the Southern eittlic system June 10, 1983 Docket No. 50-364 Director, Of fice of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the May, 1983 Monthly Operating Report for Joseph M.

Farley Nuclear Plant, Unit 2, required by Secti on 6.9.1.10 of the Unit 2 Technical Speci-fications.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R.

Barton, dated' October 21, 1977, a " Narrative S umma ry of Operating Experience" is included in the attached report.

/

If you have any questions, please advise.

Yours very truly h

g.

L.

Cl ayton, J r.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director ~, RII (1 copy) d 9

4 1 )

i y

y

/..

e

}

i M

JOSEPHM.FARLEYNUCLEA% PLANT UNIT 2 NARRATIVE SI?fMARY OF OPERATIONS MAY, 1983 t-1 The Unit experienced no sha6fowns or significant power reductions during the month of May.

'In addition to items previously reported, the following safety-related maintenance was performed in April.

/

~

1 1.

_ Performed preventive maintenance..(MP28.114) on reactor tdip breakers.

2.

Reactor trip breaker undervoltage devices ere replaced.

f' 3.

Critical dimensiona were measured on both new and old undervoltage devices.

The following safety-related maintenance was performed in the month,of May:

i 1.

Performed miscellaneour maintenance on diesel. generators.

1 2.

Replaced broken follower-roller on 1C charging pump breaker charging spring assembly.

,3

+

3." Replacement of NFA relays..

4.

Adjusted packing on containment spray pump suction valve Q2E13V012A.

~

5.

Repacked #2 and #3 river water pumps.

6.

Repaired leak in TDAFWP drain valve Q2N12V3608.