Notifies NRC That Sequoyah Nuclear Plant Unit 2 Pressurizer Surge Line Modified as Discussed in Util 910128 & 1206 Ltrs Re NRC Bulletin 88-011
ML20076G663
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/11/1994
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-88-011, IEB-88-11, TAC-M72167, NUDOCS 9410200126
Download: ML20076G663 (2)


Text

_ _

s A

Tenressee Vaney Au'hmty Post ONce Box 2000 Soody Da:sy Tennessee 37379 October 11, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - NRC BULLETIN 88-11, PRESSURIZER SURGE LINE THERMAL STRATIFICATION (TAC NO. 72167)

References:

1.

IVA letter to NRC dated Janaury 28, 1991, "Sequoyah Nuclear Plant (SQN) - NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification (TAC Nos. 72166/72167)"

2.

TVA letter to NRC dated December 6, 1991, "Sequoyah Nuclear Plant (SQN) - NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification (TAC Nos. 72166/72167)"

3.

TVA letter to NRC dated June 7, 1994, "Sequoyah Nuclear Plant (SQN) - NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification (TAC No. 72166)"

The purposs of this letter is to notify NRC that the Unit 2 pressurizer surge line has been modified as discussed in References 1 and 2.

This modification was completed during the Unit 2 Cycle 6 refueling outage.

Additionally, Unit 2 now meets the American Society of Mechanical Engineers Code Equation 12 stress limits as required in the subject bulletin. Also, now that the surge lines for both units have been modified (Reference 3), SQN will no longer need to monitor the heatup and cooldown cycles as committed to in Reference 1.

190C59 k

gm*126 mon r

1s ADOCK 05000328 Q

PDR

~

a T.S. Nuclear Regulatory Commission Page 2 October 11, 1994 Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerely, t

R. H. Shell Manager SQN Site Licensing cc:

Mr. D. E. LaBarge, Project Manager i

U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike l

Rockville, Maryland 20852-2739 j

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

-