MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
'#' '
' 7' ' C:mmenwnith Edis n
[C^^'/ ? Byron Nuclear Station l
'\ Byron, Illinois 61010
\s] 4450 North German Church Road October 8, 1994 LTR: BYRON 94-0396 FILE: 2.7.200 Director, Office of Management Information and Program control United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period September 1 through September 30, 1994.
Sincerely, 0
/ fblOW ^*
G. K. Schwartz Station Manager Byron Nuclear Power Station GKS/RC/rp CC:
J.B. Martin, NRC, Region III NRC Resident Inspector Byron IL Dept. of Nuclear Safety Regulatory Services Manager ,
Nuclear Fuel Services, PWR Plant Support l D.R. Eggett, Station Nuclear Engineering l INPO Records Center j G.F. Dick, Jr. - USNRC l F. Yost - Utility Data Institute, Inc.
4p,irn 2 vo. v -.<
I I
( 9928MM/100894 /1) 9410200100 940930 [g DR ADOCK 05000454 -
i PDR
e J ,Ae.i - # -# h- 4 4 4 $ _Mu 5
-i
-i'l I !
4- .- j 9
3 l
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT c
COMMONWEALTH EDISON COMPANY-NRC DOCKET NO. 050-454 NRC DOCKET NO, 050-455 LICENSE NO. NPF-37 ,
LICENSE NO. NPF-66
't 4
(9928MM/100894/2)
I
+
I. . Monthly Reoort for Byron UNIT 1 for the month of September 1994 A. Summary of Onerating Experience for Unita The U' nit began this reporting period in Mode 1 (Power Operations).
The power level varied due to BIR06 Coastdown, a
f l
)
I 1
l I
i l
(9928MM/100894/3)
< : l l
- B. ' OPERATING DATA _RJ2GBT DOCKET NO.: 050-454 I UNIT: Byron One DATE: '10/08/94 COMPILED BY: R. Colglazier TELEPHONE: (815)234-5441 x2282 OPERATING STATUS
- 1. Reporting Period: September, 1994. Gross Hours: 720
- 2. Currently Authorized Power Level: 3411 (MWt)
Des.gn Electrical Rating: 1175
. (MWe-gross)
DCsign Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any) None
, 4. Reasons for Restriction (If Any) : N/A THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 720 6,551 79,248
- 6. Rx Critical Hours 169.4 6,000.4 66,810.9
- 7. Rx Reserve Shutdown Hours 0 0 38
- 8. Hours Generator on Line 168.6 5,999.6 66,131.7
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (PGCd) 259,090 18,241,053 201,302,152 11.. Gross Elec. Energy (MWH) 83,986 6,245,959 68,064,504
- 12. Net Elec. Energy (MWH) 69,537 5,943,751 64,507,086
- 13. Reactor Service Factor 23.53 91.60 84.31
- 14. Reactor Availability Factor 23.53 91.60 84.35
- 15. Unit Service Factor 23.42 91.58 83.45
- 16. Unit Availability Factor 23.42 91.58 83.45
- 17. Unit Capacity Factor (MDC net) 8.74 82.11 73.66
- 18. Unit Capacity Factor (DER net) 8.62 81.01 72.68
- 19. Unit Forced Outage Hrs. 0 0 1,498.2
- 20. Unit Forced Outage Rate 0 0 2.22
- 21. Shutdowns Scheduled Over Next 6 Months: 1 (B1R06)
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: 11/12/94
- 23. Units in Test Status (Prior to Commercial Operation) None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(9928MM/100894/4)
, . ~. .. . . . . . .- _.. _ - . . . - - . . . ~ ,
Ti- :
C. AVERAGE DAILY UNIT POWER LEVEL DOCKET.NO.. 050-454 {
UNIT: Byron One DATE: 10/08/94 COMPILED BY: R. Colglazier TELEPHONE: (815)234-5441 x2282 MONTH: September, 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. 491 MW 16. -13 MW
- 2. 475 MW 17. -13 MW i
- 3. 464 MW 18 -13 MW 4, 458 MW 19. -13 MW
- 5. 455 MW 20. -13 MW
- 6. 452 MW 21. -13 MW
- 7. 416 MW 22. -13 MW
- 8. -10 MW 23. -13 MW
- 9. -14 MW 24. -14 MW
- 10. -14 MW 25. -15'MW
- 11. -14 MW 26. -14 MW
- 12. -14 MW 27. -13 MW
- 13. -13 MW 28. -12 MW
- 14. -13 MW 29. -12 MW
- 15. -13 MW 30. -12 MW
- 31. ,
1 INSTRUCTIONS l On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line - (or the restricted power level line.) 'In such cases the average daily unit' power output sheet should be footnoted to explain the apparent anomaly.
'(9928MM/100894/5) i i
_ _ , . . , , l
Report Period: September, 1994 UNIT SHUTDOWNS / REDUCTIONS
(UNIT 1) ************************** .
No. Date Type Hours Reason Method LER Number System Component cause & Corrective Action to Prevent Recurrence 5 09/08/94 S 551.2 C 2 Began B1R06 U-1 RX Tripped on SR High Flux Just As Reactor Power Had Decreased Below P-10.
t
- TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-manual Exhibit F&H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
(9928MM/100894/6)
- o. .
1 L UNIOUE' REPORTING REOUIREMENTS (UNIT 1) for the month of Sectember. 1994 l
- 1. Safety / Relief valve operations for Unit One.
I VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None
- 2. Licensee generated changes to ODCM.
None
- 3. Indications of failed fuel.
No. Fuel Reliability Indicator: FRI = 0 pCi/CC I
i l
l I
I l
1 (9928MM/100894/7) l I
5
'F. LICFNSEE EVENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for j Byron Nuclear Power Station, Unit One, occurring during the reporting period, September 1, 1994 through September 30, 1994. This information is provided !
pursuant to the reportable occurrence reporting requirements as set forth in ;
10CFR 50.73. l 4
Occurrence Licensee Event Report Number Date Title of Occurrence 454: 94-009 09/08/94 Reactor Trips Due To SSPS Circuit Board Failure.
454: 94-011 09/24/94 IST Surveillances For Several Valves Performed Past Critical Dates.
1 I
l l
1 (9928MM/100894/3) l l
i .
1 4
II. Monthly Report for Byron inTIT 2 for the month of September 1994 A. Summary of Ooerating Experience for Unit 2 The Unit began this reporting period in Mode 1 (Power operations).
l l
l .
(9928MM/100894/9) i l
t l
, . _ , _ _. ~. -. . . _.
.s - :
D. OPERATING DATA REPORT DOCKET NO.t 050-455 UNIT: Byron Two DATE: 10/08/94 COMPILED BY: R. Colglazier TELEPHONE: (815)234-5441 x2282 OPERATING STATUS
- 1. Reporting Period: September, 1994. Gross Hours: 720
- 2. Currently Authorized Power Level: 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity: 1105 (MWe-net)-
- 3. Power Level to Which Restricted (If Any) : None
- 4. Reasons for Restriction (If Any) : N/A t
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 720 6,551 62,352
- 6. Rx Critical Hours 669.5 6,500.5 54,306.4
-7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Generator on Line 664.2 6,495.2 53,700.8
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 2,096,254 21,525,120 157,597,047
- 11. Gross Elec. Energy (MWH) 718,605 7,400,461 53,583,735 12.' Net Elec. Energy (MWH) 685,737 7,069,244 50,852,471
- 13. Rea;Lur Service Factor 92.99 99.23 87.10
- 14. Reactor Availability Factor 92.99 99.23 87.10 1
- 15. Unit Service Factor 92.25 99.15 86.13
- 16. Unit Availability Factor 92.25 99.15 86.13
- 17. Unit Capacity Factor (MDC net) 86.19 97.66 73.81
- 18. Unit Capacity Factor (DER net) 85.04 96.35 72.82
- 19. Unit Forced Outage Hrs. 55.80 55.80 1,399.2
- 20. Unit Forced Outage Rate 7.75 0.85 2.54
- 21. Shutdowns Scheduled Over Next 6 Months: 1 (B2R05)
^
- 22. If Shutdown at End of Report Period, Date of Startup: None
- 23. Units in Test Status (Prior to Commercial Operation) None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(9928MM/100894/10) i y c. _ - _ .
. . - . _ - ~ .. - - - - . . . . - .~ ..
14l - >
C. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-455 UNIT: Byron Two DATE: 10/08/94 COMPILED BY: R. Colglazier TELEPHONE: (815)234-5441 x2282 MOtmI: September, 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. 1011 MW 16. 1111 MW
- 2. 1080 MW 17. 1119 MW 3; 800 MW 18, 1031 MW l- 4, 786 MW 19. 1085 MW
- 5. 848 MW 20. 1114 MW
- 6. 1043 MW 21. 1116 MW
- 7. 1088 MW 22. 1119 MW
- 8. 1091 MW 23. 1128 MW
- 9. 1083 MW 24. 468 MW
- 10. 1082 MW 25. -14 MW
- 11. 1060 MW 26. 46 MW
-L
- 12. 1092 MW 27, 527 MW
- 13. 1093 MW 28. 1113 MW
- 14. 1095 MW 29, 1121 MW
- 15. 1103 MW 30, 1114 MW 31.
INSTRUCTIONS on this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
l (9928MM/100894/11) i
Report Period: September, 1994
- UNIT SHUTDOWNS / REDUCTIONS (UNIT 2) **************************
a No. Date Tyne Hours Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence 5 09/24/94 F 55.8 A 3 RD Control Card Failure Causing Rod Drop And Subsequent Card Forced Outage B2F15 4
- TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F&H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-Ol61)
(9928MM/100894/12)
'a '
t E. UNIOUE REPORTING REOUIREMENTS (UNIT 2) for the month of September 1994 l
- 1. Safety / Relief valve operations for Unit Two.
1 VALVES NO & TYPE PLANT DESCRIPTION l DATE ACTUATED ACTUATION CONDITION OF EVENT
]
. None l
I
- 2. Licensee generated changes to ODCM. I None I
- 3. Indications of failed fuel.
l No. Fuel Reliability Indicator: FRI = 2.78 E-5 pCi/CC l 1
I (9928FBf/1008 94 /13 )
J- ;
, 1 l
,- 1 F. LICENSEE EVENT REPORTS (UNIT 2)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit Two, occurring during the reporting period, September 1, 1994 through September 30, 1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number Date Ti.tle of Occurrence 94-002 09/23/94 Rod Urgent Failure Alarm Causes SDB To Remain In Core.94-003 09/24/94 Auto Start Of The 2B AF pumps On LoLo Steam Generator Level.94-004 09/24/94 Reactor Trip On Negative Flux Rate.
(9928MM/100894/14)