ML20076G561

From kanterella
Jump to navigation Jump to search
Application to Amend License NPF-13,consisting of Tech Spec Change PCOL-83/08,per 821020 Confirmation of Action Ltr. Changes Enhance Clarity & Provide Consistency W/Plant Design & Operation
ML20076G561
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/09/1983
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20076G565 List:
References
AECM83-0314, AECM83-314, NUDOCS 8306140724
Download: ML20076G561 (2)


Text

__

\

d .

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N, MISSISSIPPI 39205 June 9, 1983 NUCLEAR PRoOUCTION DEPARTMENT U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 Attention: Mr. Harold R. Denton, Director

Dear Mr. Denton:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-860.0 Transmittal of Proposed Changes to Grand Gulf Technical Specifications AECM-83/0314 Consistent with NRC direction provided to Mississippi Power & Light (MP&L) in the " Confirmation of Action" letter, Mr. J. P. O'Reilly to Mr. D. C.

Lutken, dated October 20, 1982 (MAEC-82/242), MP&L is providing for your review and approval proposed changes to the Grand Culf Nuclear Station Technical Specifications. These changes result primarily from MP&L's review of the technical specifications and surveillance prccedures and are intended, in general, to enhance clarity or provide consistency with the plant design and operation. These changes have been reviewed and accepted by the Plant Safety Review Committee (PSRC) and the Safety Review Committee (SRC).

The subject changes have been evaluated by MP&L in accordance with the guidelines of 10 CFR 50.92. On the basis of that evaluation, MP&L has determined that the subject changes involve no "significant hazard consideration." Justification for this determination is provided in the attached information.

Following your review and authorization to incorporate the requested changes, MP&L will implement the affected spccifications. Immediate implementation following NRC review and approval is MP&L's intention except in cases where the subject changes must await (1) the implementation of a design modification or (2) the development of implementing surveillance procedures.

In general, every effort will be made to accomplish the expeditious implementation of the requested changes following NRC review and approvel.

Yours truly, 9306140724 830609 //

DR ADOCK 05000416 M PDR L. F. Dale Manager of Nuclear Services JGC/JDR: sap Attachment O cc: (See Next Page) O I Member Middle South Utilities System ;i

AECM-83/0294

  • MIS 2IOCIPPI POWER O LIGHT COMPANY cc: Mr. J. B. Richard (w/o)

Mr. G. B. Taylor (w/o)

Mr. R. B. McGehee (w/o)-

Mr. T. B. Conner (w/o)

Mr. J. P. O'Reilly (w/a)

Regional Administrator Office of Inspection & Enforcement, Region II 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30303 Mr. R. C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Alton B. Cobb (w/a)

State Health Officer State Board of Health Box 1700 Jackson, Mississippi 39205