Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000331/LER-1983-030-03, /03L-0:on 830812,diesel Generator (DG) Unit/ Parallel Switch on DG Control Panel Bumped Causing 1G-31 to Be Aligned in Parallel Rather than Control Mode.Caused by Personnel Error.Switch Reset + (07:18:51, 15 December 2024)
- ML20076L065 + (07:18:52, 15 December 2024)
- ML20076L027 + (07:18:53, 15 December 2024)
- ML20076L039 + (07:18:53, 15 December 2024)
- BVY-94-103, Application for Amend to License DPR-28,consisting of Proposed Change 174,removing Neutron Flux Instrumentation from Post Accident Monitoring TS + (07:18:54, 15 December 2024)
- RC-94-0280, Requests Relief from ASME Section XI Requirements for Class 1 & 2 Insulated Pressure Retaining Bolted Connection, Receiving VT-2 Visual Exam During Performance of Sys Pressure Testing + (07:18:55, 15 December 2024)
- 05000458/LER-1994-021, :on 940712,affected Equipment Declared Operable.Caused by Inadequate Control & Implementation of Procedure Writing,Review & Rev Process.Affected STPs Revised + (07:18:56, 15 December 2024)
- 05000369/LER-1983-067-03, /03L-0:on 830806,during Surveillance,Upper Head Injection Level Switch Setpoints Found Out of Tolerance. Caused by Design Deficiency.Mod to Replace Switches W/Transmitters Will Be Implemented + (07:18:58, 15 December 2024)
- BSEP-83-3006, RO 1-83-40:on 830904,while Performing Periodic Test A4 on RCIC Steam Line High D/P Instrumentation,Hpci & RCIC Isolated.Caused by Periodic Test Incorrectly Written. Results Will Be Reported in 14-day Rept + (07:18:59, 15 December 2024)
- ML20076K994 + (07:19:00, 15 December 2024)
- ML20076K989 + (07:19:03, 15 December 2024)
- ML20076K991 + (07:19:03, 15 December 2024)
- ML20076K988 + (07:19:04, 15 December 2024)
- ML20076K986 + (07:19:05, 15 December 2024)
- ML20076K984 + (07:19:06, 15 December 2024)
- ML20076K980 + (07:19:16, 15 December 2024)
- ML20076K982 + (07:19:16, 15 December 2024)
- ML20076K976 + (07:19:17, 15 December 2024)
- ML20076K974 + (07:19:18, 15 December 2024)
- ML20076K970 + (07:19:18, 15 December 2024)
- ML20076K959 + (07:19:19, 15 December 2024)
- ML20076K965 + (07:19:19, 15 December 2024)
- NG-94-3904, Forwards Listed Revised Pages to TS Change RTS-246 & RTS-246A + (07:19:20, 15 December 2024)
- ML20076K953 + (07:19:20, 15 December 2024)
- ML20076K950 + (07:19:21, 15 December 2024)
- ML20076K943 + (07:19:22, 15 December 2024)
- ML20076K941 + (07:19:23, 15 December 2024)
- ML20076K939 + (07:19:24, 15 December 2024)
- ML20076K934 + (07:19:24, 15 December 2024)
- ML20076K930 + (07:19:25, 15 December 2024)
- ML20076K931 + (07:19:25, 15 December 2024)
- ML20076K928 + (07:19:26, 15 December 2024)
- ML20076K925 + (07:19:26, 15 December 2024)
- BSEP-94-0386, Application for Amends to Licenses DPR-71 & DPR-62,deleting Remaining Ets,Including Section 2/3.3.1,water Level in Discharge Canal & Section 2/3.4,meteorology + (07:19:27, 15 December 2024)
- ML20076K920 + (07:19:28, 15 December 2024)
- 05000369/LER-1983-065-03, /03L-0:on 830725,27,0810,12,21,24 & 25,pressurizer Heater Group 1B Declared Inoperable.Caused by Various Component Malfunctions or Failures & Design Deficiency.Fuses & Transformer Replaced + (07:19:29, 15 December 2024)
- ML20076K916 + (07:19:30, 15 December 2024)
- 05000301/LER-1994-003-01, :on 941010,800 Psid Leak Test Was Performed & Tubes,Mechanical Plugs & Explosive Plugs Observed to Have Leakage.Closeout Insp Were Performed & Tubes Were Replaced + (07:19:32, 15 December 2024)
- ML20076K912 + (07:19:33, 15 December 2024)
- ML20076K908 + (07:19:33, 15 December 2024)
- BECO-83-225, Forwards Corrected Attachment 2 to 830707 QA Program Description.Biennial Audits Intended Where Biannual Mistakenly Appears + (07:19:34, 15 December 2024)
- RBG-41013, Forwards Updates to IST Pump & Valve Program Manual, Correcting Discrepancies,Improving Clarity & Structuring Plan So as to Provide Clear & Understandable Description of Pump & Valve IST Program at Plant + (07:19:34, 15 December 2024)
- ML20076K903 + (07:19:35, 15 December 2024)
- ML20076K901 + (07:19:36, 15 December 2024)
- ML20076K900 + (07:19:36, 15 December 2024)
- ML20076K898 + (07:19:37, 15 December 2024)
- ML20076K895 + (07:19:38, 15 December 2024)
- ML20076K893 + (07:19:39, 15 December 2024)
- ML20076K894 + (07:19:39, 15 December 2024)
- U-602358, Provides Response to GL 94-02, Long Term & Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Bwrs + (07:19:40, 15 December 2024)
- ML20076K889 + (07:19:41, 15 December 2024)