ML20076K980
| ML20076K980 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/07/1983 |
| From: | Ward E NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20076K972 | List: |
| References | |
| NUDOCS 8307180326 | |
| Download: ML20076K980 (1) | |
Text
--
b Northem States Power Company 414 Ncollet Mall Minneapoks. Minnesota 55401 Telephone t612) 330-5500 June 7, 1983 Regional Administrator Reg 4on III U S Nuclear Regulatorv Commission 799 Roosevelt Road Glen Ellyn, IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPR-22 Emergency Resoonse Plan Imolementine Procedures Furnished with this letter is one copy of revisions to the Monticello Nuclear Generating Plant Emergency Implementing Procedures. These revisions include the following procedures:
List of Current Pages (Dated 5/20/83)
A.2-001 Emergency Organization (Pages 1 thru 19) Rev 6 A.2-107 Activation of Operations Support Center (Pages 1 thru 4) Rev 6 A.2-402 Contamination Control (Pages 1 thru 8) Rev 2 A.2-603 DELETED - 5/19/83 A.2-101 Classification af Emergencies (Pages 1 thru 46) Rev 5 This procedure document includes names and/or telephone numbers of persons having responsibility under the Emergency Plan. To maintain the confidentiality of the above information for reasons of privacy and plan effectiveness, we have deleted names and/or telephone numbers from the copies which are sent to NRR because portions of these documents will be docketed.
E C Ward P E Manager-Nuclear Environmental Services ECW/GDH/ dab Attachment ec: Director of NRR (2)
NRC Resident Inspector (w/o attachment)
G Charnoff (w/o attachment) m7ma'm%
P i i F
m i