ML20076K925

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Graph Depicting Elevation Dependent Peaking Factor Vs Core Height,In Support of 830825 Radial Peaking Factor Limit Rept.Graph Withheld (Ref 10CFR2.790). Application for Withholding & Affidavit Encl
ML20076K925
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/09/1983
From: Clayton F
ALABAMA POWER CO.
To: Varga S
NRC
Shared Package
ML19273A137 List:
References
NUDOCS 8309150314
Download: ML20076K925 (3)


Text

Milling Addrsts te=l=s =""'

Post Office Box 2641 PROPRIETARY I 9""*

$"n0ne2b$Is$o'87 ' MATERfAL TRANSMITTED HEREWITH F. L Clayton, Jr. NTAINS 2.790 iNF ORMATION Senior Vice President Fhntridge Building AlabamaPower September 9, 1983 Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 2 Supplement to the Radial Peaking Factor Limit Report Gentlemen:

Enclosed is a copy of the elevation dependent peaking factor versus core height graph for Cycle 3 of Unit 2 as requested by your staff.

This information is being submitted in support of the Radial Peaking Factor Limit Report transmitted to you in Alabama Power Company letter dated August 25, 1983.

This submittal contains proprietary information of Westinghouse Electric Corporation. In conformance with the requirements of 10CFR Section 2.790, as amended, of the Commission's regulations, we are enclosing with this submittal an application for withholding from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission. Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10CFR Section 2.790 of the Commission's regulations. Correspondence with respect to the proprietary aspects of this application for withholding or the supporting Westinghouse

affidavit should reference CAW-83-74 and should be addressed to R. A.

i Wiesemann, Manager of Regulatory and Licensing Affairs, Westinghouse Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230.

If you have any questions, please advise.

Very truly yours,

[Y g F. L. Clayton, Jr.

FLCJ r/ JAR:1sh-D2 Enclosures

( cc: See Page 2 8309150314 830909 PDR ADOCK 05000364 P PDR

Mr. S. A. Varga September 9, 1983 U. S. Nuclear Regulatory Commission Page 2 cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Office of NRR Chief of the Core Performance Branch U. S. Nuclear Regulatory Commission Washington, D.C. 20555 l

l

Figure 1 FARLEY 2 CYCLE 3 Maximum- (F PREL) Versus Axial Core Height -

During Nonnal Cycle Operation ~

_ a., b,c

.s 1

^

c-u

> ,cr w

E i iE 1, .

l I

I I

I l

l

~

Bottom ,

Core Height (Feet) Too

+ee

. *