Text
Milling Addrsts te=l=s =""'
PROPRIETARY Post Office Box 2641 I
$"n0ne2b$Is$o'87 '
MATERfAL TRANSMITTED HEREWITH 9""*
NTAINS 2.790 iNF ORMATION F. L Clayton, Jr.
Senior Vice President Fhntridge Building AlabamaPower September 9, 1983 Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 2 Supplement to the Radial Peaking Factor Limit Report Gentlemen:
Enclosed is a copy of the elevation dependent peaking factor versus core height graph for Cycle 3 of Unit 2 as requested by your staff.
This information is being submitted in support of the Radial Peaking Factor Limit Report transmitted to you in Alabama Power Company letter dated August 25, 1983.
This submittal contains proprietary information of Westinghouse Electric Corporation.
In conformance with the requirements of 10CFR Section 2.790, as amended, of the Commission's regulations, we are enclosing with this submittal an application for withholding from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission. Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10CFR Section 2.790 of the Commission's regulations.
Correspondence with respect to the proprietary aspects of this application for withholding or the supporting Westinghouse affidavit should reference CAW-83-74 and should be addressed to R. A.
Wiesemann, Manager of Regulatory and Licensing Affairs, Westinghouse i
Electric Corporation, P. O. Box 355, Pittsburgh, Pennsylvania 15230.
If you have any questions, please advise.
Very truly yours,
[Y g F. L. Clayton, Jr.
FLCJ r/ JAR:1sh-D2
(
Enclosures cc: See Page 2 8309150314 830909 PDR ADOCK 05000364 P
Mr. S. A. Varga September 9, 1983 U. S. Nuclear Regulatory Commission Page 2 cc:
Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford Office of NRR Chief of the Core Performance Branch U. S. Nuclear Regulatory Commission Washington, D.C.
20555 l
l
Figure 1 FARLEY 2 CYCLE 3 Maximum- (F PREL) Versus Axial Core Height During Nonnal Cycle Operation
~
_ a., b,c
.s 1
^
- u c-
>,cr w
E;;
i iE 1,
l I
I I
I l
l
~
Bottom Core Height (Feet)
Too
+ee
.