Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078B985 + (05:54:18, 15 December 2024)
- ML20078B984 + (05:54:19, 15 December 2024)
- ML20078B977 + (05:54:20, 15 December 2024)
- ML20078B981 + (05:54:20, 15 December 2024)
- ML20078B972 + (05:54:21, 15 December 2024)
- ML20078B976 + (05:54:21, 15 December 2024)
- B15013, Application for Amend to License DPR-65,revising Tech Specs Surveillance Requirement 4.6.1.2.a to Permit Flexible Schedule for Containment Leakage Type a Testing + (05:54:22, 15 December 2024)
- ML20078B963 + (05:54:23, 15 December 2024)
- ML20078B966 + (05:54:23, 15 December 2024)
- ML20078B957 + (05:54:25, 15 December 2024)
- 05000336/LER-1994-028-01, :on 940923,TS Surveillance Not Performed within Required Time Interval Due to Assuming That 24 Month LLRT Began After LLRTs Completed from Current Refuel Outage.Past LLRT Surveillance Intervals Reviewed + (05:54:32, 15 December 2024)
- 05000336/LER-1994-024, :on 940922,B DG Removed from Svc for Monthly Surveillance Run & a DG Declared Inoperable After Receiving DG Disable Alarms in Cr.Cause of Event Unknown.Alarms Reset, Quick Start Performed & a DG Declared Operable + (05:54:34, 15 December 2024)
- ML20078B952 + (05:54:35, 15 December 2024)
- ML20078B949 + (05:54:36, 15 December 2024)
- ML20078B946 + (05:54:37, 15 December 2024)
- 05000423/LER-1994-013-02, :on 940916,determined That Previous Plant start-ups Conducted W/Several Operability Tests Not Performed Prior to Entry Into Modes 4 & 3.Caused by Misinterpretation of Inconsistency in TS + (05:54:38, 15 December 2024)
- ML20078B944 + (05:54:39, 15 December 2024)
- ML20078B943 + (05:54:40, 15 December 2024)
- 05000318/LER-1994-005-01, :on 940924,reactor Trip Experienced Due to Main Turbine Governor Valve Opening.Wire on 21 Governor Valve LVDT Tightened & Wiring on All Other Unit 2 Main Turbine Throttle & Governor Valves Checked + (05:54:45, 15 December 2024)
- ML20078B936 + (05:54:46, 15 December 2024)
- ML20078B940 + (05:54:46, 15 December 2024)
- ML20078B934 + (05:54:47, 15 December 2024)
- ML20078B935 + (05:54:47, 15 December 2024)
- NRC-95-4392, Forwards Proprietary PXS-T2R-034, Quick Look Rept for SPES- 2 Matrix Test S01703 AP600 Program. Proprietary PXS-T2R-034 Rept Withheld (Ref 10CFR2.790). Proprietary Portion of Document Sent to Westinghouse + (05:54:48, 15 December 2024)
- ML20078B931 + (05:54:49, 15 December 2024)
- 05000455/LER-1994-003-10, :on 940924,rod Dropped Into Core Resulting in Reactor Trip & Corresponding AFW Actuation Due to Failure of Main Steam Header Pressure Controller.Controller Replaced.W/ + (05:54:50, 15 December 2024)
- ML20078B927 + (05:54:52, 15 December 2024)
- ML20078B928 + (05:54:52, 15 December 2024)
- ML20078B926 + (05:54:53, 15 December 2024)
- ML20078B923 + (05:55:01, 15 December 2024)
- ML20078B919 + (05:55:02, 15 December 2024)
- ML20078B922 + (05:55:02, 15 December 2024)
- ML20078B916 + (05:55:03, 15 December 2024)
- U-602396, Provides Suppl/Followup to 940808 Request to Use Code Cases N-498-1,N-416-1 & N-517,in Time Frame That Will Support Forthcoming Refueling Outage Currently Scheduled to Begin 950312 + (05:55:04, 15 December 2024)
- ML20078B910 + (05:55:05, 15 December 2024)
- ML20078B908 + (05:55:05, 15 December 2024)
- ML20078B898 + (05:55:06, 15 December 2024)
- ML20078B907 + (05:55:06, 15 December 2024)
- ML20078B895 + (05:55:07, 15 December 2024)
- TXX-4052, Notifies of Intention to Schedule Conference Call During Wk of 830926 to Resolve Questions Re post-accident Sampling Sys Procedure for Estimating Core Damage,Per + (05:55:14, 15 December 2024)
- ML20078B883 + (05:55:23, 15 December 2024)
- ST-HL-AE-4904, Forwards Renewal Application for Wastewater Discharge Permit for South Texas Project NPDES Permit TX0064947 & Renewed Wastewater Discharge Permit for South Texas Project NPDES Permit TX0064947 + (05:55:23, 15 December 2024)
- ML20078B880 + (05:55:24, 15 December 2024)
- ML20078B881 + (05:55:24, 15 December 2024)
- BECO-LTR-94-112, Endorses Comments Submitted by Nuclear Energy Inst in Re NRC Pilot Program for NRC Recognition of Good Performance by Nuclear Power Plants + (05:55:25, 15 December 2024)
- B10844, Discusses Current Plans & Schedules for Removal of Thermal Shield from Core Barrel & Ultimate Disposition of Component. Various Action Items Discussed at 830721 Meeting Elaborated + (05:55:25, 15 December 2024)
- 0CAN109402, Forwards Response to Violations Noted in Insp Repts 50-313/94-16 & 50-368/94-16.Corrective Actions:Description of Condition Involving Individuals Placed Into Quarterly Safeguards Event Log on 940425 + (05:55:26, 15 December 2024)
- ML20078B871 + (05:55:27, 15 December 2024)
- ML20078B866 + (05:55:27, 15 December 2024)
- ML20078B863 + (05:55:28, 15 December 2024)
- ML20078B858 + (05:55:31, 15 December 2024)