ML20078B895

From kanterella
Jump to navigation Jump to search
Motion for Reconsideration of ASLB Ruling Re Notification/ Preparation of Evacuation Time Estimates
ML20078B895
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/19/1983
From: Holmes G
HOLMES & ELLIS, SEABROOK, NH
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20078B885 List:
References
NUDOCS 8309270307
Download: ML20078B895 (1)


Text

-

h, 00CKETE0 USNRC UNITED STATES OF AMERICA 13 39 23 P4:15 NUCLEAR REGULATURY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD OFF CE OF DOCKETING SECntT;,d';p

& SEpv '

BRANCH

)

In The Matter Of: )

Public Service Company of )

New Hampshire et a1 ) Docket Nos. 50-443 Seabrook Station, Units 1 and 2) ) 50-444

) I TOWN OF SEABROOK ,

MOTION-FOR RECONSIDERATION OF BOARD'S RULING WITH RESPECT TO NOTIFICATION / PREPARATION

.ON EVACUATION TIME ESTIMATES Pursuant to 10 C.F.R. 2.730 (c), the Town of Seabrook, New Hampshire, designated as an interested municipality, motions for reconsideration of the ruling of the Atomic Safety and Licensing Board with respect to its order rejecting Massachusetts'_ contention on evacuation time estimates.

It is set forth that the evacuation time estimates should include notifica-tion / preparation time.

Respectfully submitted, TOWN OF SEABROOK By Its Attor ,

HOLMES & EL 7f ,

Dated: September'19, 1983 By: M '

Gar Q'1mes' 47 itm(cunnet Road Hampton, NH 03842 (603) 926-6162 8309270307 830919 ~

PDR ADOCK 05000443 G PDR

- -