Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078L654 + (05:25:31, 15 December 2024)
- ML20078L653 + (05:25:32, 15 December 2024)
- ML20078L650 + (05:25:33, 15 December 2024)
- ML20078L649 + (05:25:34, 15 December 2024)
- ML20078L643 + (05:25:38, 15 December 2024)
- ML20078L642 + (05:25:39, 15 December 2024)
- 05000424/LER-1994-008-02, :on 941027,piping Penetration Area Filtration & Exhaust Sys Rendered Inoperable.Caused by Personnel Error. Two Circuits Cards Involved Were Reinstalled & Both Trains Restored + (05:25:40, 15 December 2024)
- ML20078L639 + (05:25:41, 15 December 2024)
- ST-HL-AE-4934, Application for Amends to Licenses NPF-76 & NPF-80,revising TS 3.8.1.1, Electrical Power Sys - Ac Sources - Operating + (05:25:43, 15 December 2024)
- ML20078L637 + (05:25:43, 15 December 2024)
- ML20078L633 + (05:25:44, 15 December 2024)
- ML20078L632 + (05:25:45, 15 December 2024)
- ML20078L631 + (05:25:47, 15 December 2024)
- ML20078L626 + (05:25:47, 15 December 2024)
- ML20078L620 + (05:25:48, 15 December 2024)
- ML20078L618 + (05:25:50, 15 December 2024)
- 05000306/LER-1994-003-02, :on 941025,auto-start of Train of Absvs on High Radiation Occurred During Restoration of Seal Water Return Filter Due to Inadequate Procedure.Procedures Will Be Revised + (05:25:51, 15 December 2024)
- 05000361/LER-1994-006, :on 941023,violation of TS 6.2 Shift Manning Occurred.Caused by Misunderstanding of Control Room Area Boundaries.Administrative Procedure SO123-0-30 Revised.W/ + (05:25:53, 15 December 2024)
- 05000446/LER-1994-018, :on 941025,pressurizer Safety Valves Discovered to Be Inoperable from as-found Testing.Caused by Setpoint Drift.Setpoints Reset to within TS Limits + (05:25:55, 15 December 2024)
- ML20078L601 + (05:26:00, 15 December 2024)
- 05000368/LER-1994-001-01, :on 940312,TS Requirements for Logarithmic Power Level Instrumentation Operability Not Met Due to Inadequate post-maint test.Post-maint Test for Other Channels Tested During Outage in Progress Revised + (05:26:02, 15 December 2024)
- 05000368/LER-1994-001, Forwards Rev 1 to LER 94-001 Re Excore Nuclear Instrumentation.Rev Revises Commitment Re Future post-maint Testing Method Used to Verify Continuity of Cable Connectors + (05:26:03, 15 December 2024)
- BSEP-94-0480, Provides Response to Violations Noted in Insp Repts 50-324/94-28 & 50-325/94-28.Corrective Actions:Remaining Fuel Handling Procedures Reviewed for Consistency W/New OP-13 Revs & No Other Revs Identified + (05:26:04, 15 December 2024)
- ML20078L590 + (05:26:04, 15 December 2024)
- 05000282/LER-1994-010-01, :on 941027,determination Made That Scaling for Overtemperature Delta T Reactor Trips Inadequate.Caused by Insufficient Evaluation of T Hot Scaling Against Plant Safety Limits.Internal Investigation Begun + (05:26:06, 15 December 2024)
- ML20078L579 + (05:26:07, 15 December 2024)
- ML20078L575 + (05:26:09, 15 December 2024)
- ML20078L577 + (05:26:09, 15 December 2024)
- LIC-94-0242, Forwards Nonproprietary & Proprietary Version of Epips, Including EPIP Index & Rev 28 to EPIP-OSC-2, Command & Control Position Actions/Notifications. Proprietary Rev 28 to EPIP-OSC-2 Withheld + (05:26:10, 15 December 2024)
- 05000263/LER-1994-018, :on 941026,automatic Transfer of HPCI Suction from Condensate Storage Tanks to Torus on High Torus Level During Surveillance Testing.Caused by Lack of Appropriate Procedure Action.Guideline Will Be Established + (05:26:11, 15 December 2024)
- 05000263/LER-1994-017, :on 941023,HPCI Isolated on High Steam Flow During Test at Lower than Normal Pressure.Preventative Maint Procedure for HPCI Sys Revised + (05:26:14, 15 December 2024)
- ML20078L564 + (05:26:15, 15 December 2024)
- ML20078L568 + (05:26:15, 15 December 2024)
- ML20078L563 + (05:26:17, 15 December 2024)
- ML20078L562 + (05:26:18, 15 December 2024)
- ML20078L561 + (05:26:19, 15 December 2024)
- ML20078L556 + (05:26:20, 15 December 2024)
- ML20078L549 + (05:26:21, 15 December 2024)
- ML20078L552 + (05:26:21, 15 December 2024)
- ML20078L548 + (05:26:22, 15 December 2024)
- RC-94-0302, Forwards Modified NPDES Permit SC0030856 for VC Summer Nuclear Station.Submittal Provides Updated Info for Permit, Per Operating License NPF-12,App B + (05:26:23, 15 December 2024)
- 05000374/LER-1994-008-09, :on 941019,reactor Scram Occurred Due to electro-hydraulic Control Line Break.Caused by Faulty Connector on EHC Permanent Magnet Generator 30 Volt Dc Power Supply.Connector Repaired + (05:26:25, 15 December 2024)
- NG-94-4114, Monthly Operating Rept for Oct 1994 for Duane Arnold Energy Ctr + (05:26:27, 15 December 2024)
- ML20078L532 + (05:26:27, 15 December 2024)
- ML20078L521 + (05:26:28, 15 December 2024)
- ML20078L520 + (05:26:28, 15 December 2024)
- ML20078L517 + (05:26:29, 15 December 2024)
- ST-HL-AE-4939, Forwards Revised Epips,Including Rev 4 to 0ERP01-ZV-EF07,rev 3 to 0ERP01-ZV-EF08,rev 2 to 0ER01-ZV-EF09,rev 3 to 0ERP01-ZV-EF18,rev 2 to 0ERP01-ZV-EF19,rev 2 to 0ERP01-ZV-EF20.W/o Encl + (05:26:30, 15 December 2024)
- ML20078L504 + (05:26:30, 15 December 2024)
- ML20078L497 + (05:26:31, 15 December 2024)
- ML20078L495 + (05:26:32, 15 December 2024)