ML20078L650

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 941116,sewage Leak Excursion Occurred When Vehicle Struck Capped 4-inch PVC vent/clean-out Pipe Connected to Sewage Line Serving Restroom Facility
ML20078L650
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/21/1994
From: Stoma S
ENTERGY OPERATIONS, INC.
To: Givens D
LOUISIANA, STATE OF
References
NUDOCS 9411300337
Download: ML20078L650 (2)


Text

1 WENTERGY l"'S%?Cl"" " '"'

Vo BGs 220 l

St F<anc;scue LA 70775 November 21,1994 Mr. Dale Givens Assistant Secretary Office of Water Resources Louisiana Department of Environmental Quality Water Pollution Control Division Post Office Box 44091, Capitol Station Baton Rouge, LA 70804-4091

Subject:

Station Sewage System Leakage

Reference:

Louisbna Water Discharge Permit WP0409 File No. G1.11.2 RBG: 41,073

Dear Mr. Givens:

This letter is a written follow-up for a prompt notification of a sewage leak excursion which occurred on November 16,1994.

A leaking sewage line was discovered on November 16 at 11:30 a.m.. The subsequent investigation indicated that the leak started when a vehicle struck a capped 4-inch PVC vent / clean-out pipe connected to a sewage line serving a restroom facility in a remote building. The sewage leak eventually entered the East Creek storm drain system with an estimated flow of less than .25 gpm. At the time of the excursion no flow was observed in the storm drain with the last flow observed on November 10,1994. The leaking sewage did not escape the River Bend property or enter the East Creek drainage.

Immediate corrective action taken included securing the restroom facility, repair of the sewage line, and lime addition over the effected area. Required sampling and analysis including fecal coliform counts will be performed at permitted Outfall 006 (East Creek) during the next rainfall.

)

9411300337 94112j PDR STPRG ESGLA o 1 D PDR

/ )

a

?

./  ;.

i Mr. Dale Givens November 21,1994 RBG: 41,073 Page 2 of 2  ;

I certify under penalty of law that this document and all attachments were prepared under the direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false info,mation including the possibility of fine and imprisonment for knowing violations.

Sincerely,,

w

.e {4 W<

l S. Keith Stoma l Coordinator Environmental (Acting) l l

cc: Nuclear Regulatory commission Document Control Desk Washington D.C. 20555 i U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Resident inspector j P.O. Box 1051 j St. Francisville, LA 70775 )

i i

l i

I l

i