Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080H067 + (03:05:25, 15 December 2024)
- ML20080H068 + (03:05:25, 15 December 2024)
- ML20080H061 + (03:05:26, 15 December 2024)
- ML20080H059 + (03:05:26, 15 December 2024)
- ML20080H051 + (03:05:27, 15 December 2024)
- ML20080H049 + (03:05:31, 15 December 2024)
- ML20080H044 + (03:05:32, 15 December 2024)
- ML20080H043 + (03:05:33, 15 December 2024)
- ML20080H041 + (03:05:34, 15 December 2024)
- ML20080H040 + (03:05:34, 15 December 2024)
- ML20080H038 + (03:05:35, 15 December 2024)
- 05000336/LER-1994-017, :on 940601,inadvertent ESAS Actuations Occurred.Caused by Deenergizing of Engineered ESAS Facility 2 Actuation Cabinet.Revised Operations Procedure 2384 + (03:05:36, 15 December 2024)
- ML20080H036 + (03:05:37, 15 December 2024)
- 05000298/LER-1995-001, :on 950107,tested Surveillance of Detection Sys Supervisory Circuits.Caused by Defective Procedure.Fire Watch Posted in DG Fire Areas & Maintained Until Detection Sys Was Declared Operable + (03:05:39, 15 December 2024)
- ML20080H029 + (03:05:43, 15 December 2024)
- B10888, Advises That Potential Design Deficiency May Exist in Westinghouse Mfg Fuel,Causing Binding Between Top Nozzle Flowers & Posts,Per IE Insp Rept 50-336/83-26.Addl Info,Per 830729 Request Re Failed Fuel Assemblies,Will Be Submitted + (03:05:44, 15 December 2024)
- ML20080H025 + (03:05:45, 15 December 2024)
- ML20080H020 + (03:05:49, 15 December 2024)
- ML20080H017 + (03:05:51, 15 December 2024)
- ML20080H016 + (03:05:52, 15 December 2024)
- ML20080H015 + (03:05:53, 15 December 2024)
- ML20080H014 + (03:05:53, 15 December 2024)
- 05000296/LER-1983-045-03, /03L-0:on 830802,w/unit at 97% Power,Hydrogen Analyzer B Inoperable Due to Loss of Flow.Caused by Moisture in Sample Lines.Lines Blown Down & Dried.Sys Returned to Svc + (03:05:55, 15 December 2024)
- RBG-16-949, Interim Deficiency Rept DR-145 Re Implementation of Design Mod to Beam Welded to Embedment Plate in Reactor Bldg. Investigation Incomplete.Interim or Final Status Rept Will Be Provided by 840321 + (03:05:56, 15 December 2024)
- ML20080H009 + (03:05:57, 15 December 2024)
- ML20080H007 + (03:05:58, 15 December 2024)
- RBG-16-865, Forwards Amend 11 to FSAR Providing Response or Response Schedule for Items Identified in Draft Ser.Affidavit of Svc Encl + (03:05:59, 15 December 2024)
- NPL-95-0062, Submits Addl Info for QA Program Description Changes for Suppl to 1994 Rev of FSAR + (03:05:59, 15 December 2024)
- ML20080H002 + (03:06:00, 15 December 2024)
- ML20080H001 + (03:06:01, 15 December 2024)
- 05000336/LER-1994-026, :on 940825,vital 120 Volt AC Sys Degraded. Caused by Inadequate Design in Coordination of H Analyzer Power Supply.Change Was Implemented to Install Fuses + (03:06:04, 15 December 2024)
- ML20080G990 + (03:06:06, 15 December 2024)
- ML20080G987 + (03:06:06, 15 December 2024)
- ML20080G986 + (03:06:07, 15 December 2024)
- ML20080G985 + (03:06:11, 15 December 2024)
- ML20080G980 + (03:06:14, 15 December 2024)
- ML20080G978 + (03:06:25, 15 December 2024)
- ML20080G974 + (03:06:26, 15 December 2024)
- ML20080G975 + (03:06:26, 15 December 2024)
- ML20080G970 + (03:06:27, 15 December 2024)
- ML20080G966 + (03:06:28, 15 December 2024)
- ML20080G964 + (03:06:29, 15 December 2024)
- ML20080G961 + (03:06:30, 15 December 2024)
- ML20080G958 + (03:06:31, 15 December 2024)
- ML20080G953 + (03:06:31, 15 December 2024)
- ML20080G950 + (03:06:32, 15 December 2024)
- ML20080G949 + (03:06:33, 15 December 2024)
- 05000456/LER-1995-001-05, :on 950118,senior Licensed Operator Was Not Present in MCR Due to Personnel Error.Both Individuals Have Been Spoken to W/Respect to Noncompliance W/Ts Manning Requirements + (03:06:36, 15 December 2024)
- ML20080G945 + (03:06:37, 15 December 2024)
- ML20080G943 + (03:06:37, 15 December 2024)
- ML20080G939 + (03:06:38, 15 December 2024)