ML20080G986
| ML20080G986 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/03/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 32, W3K83-0246, W3K83-246, NUDOCS 8402140060 | |
| Download: ML20080G986 (2) | |
Text
c o
e LOUISIANA P O W E R & L 1 G H T! P O BOX 6008. NEW ORLEANS. LOUISIANA 70174 3 2 ouAnoNoe sineer
- (504) 366 2345
[NONsEIU February 3, 1984 W3K84-0246 Q-3-A35.07.32 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012
REFERENCE:
LP&L Letter W3K83-1665 dated October 28, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 32
" Stress Analysis For Welded Pipe Supports Was Not Performed Prior To Fabrication" Seventh Interim Report The above referenced letter indicated submittal of a Final Report to the USNRC on February 3, 1984.
At the present time, the supporting documentation review is continuing and is scheduled to be completed in late February 1984.
The Final Report will be submitted to the USNRC on March 9, 1984.
Very truly yours, FM W
T.
errets Corporate Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8402140060 840203 PDR ADOCK 05000382 S
PDR D47 i 0
Mr.' John T. Collins
-February 3, 1984 W3K84-0246 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr.
F.. L. Blake Shaw, Pittman,.Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 1
..