Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2009-231, Comment (06) of Mchenry Cornell on Behalf of Florida Power & Light Company on the Proposed Generic Communication, NRC Regulatory Issue Summary 2005-02, Revision 1, Clarifying the Process for Making Emergency Plan Changes + (13:28:41, 14 January 2025)
- L-09-290, September 2009 Discharge Monitoring Report (NPDES) for Permit No. PA0025615 + (13:28:43, 14 January 2025)
- L-2009-247, Issuance of Amendment Regarding Spent Fuel Boraflex Remedy - Supplement 2 to Request for a Change in Implementation Date + (13:28:44, 14 January 2025)
- ML093080174 + (13:28:46, 14 January 2025)
- ML093080161 + (13:28:50, 14 January 2025)
- ML093080160 + (13:28:51, 14 January 2025)
- ML093080159 + (13:28:52, 14 January 2025)
- ML093080158 + (13:28:54, 14 January 2025)
- ML093080138 + (13:28:55, 14 January 2025)
- ML093080136 + (13:28:56, 14 January 2025)
- BSEP 09-0019, Application to Revise Technical Specifications Regarding Primary Containment Isolation Instrumentation in Accordance with TSTF-306, Revision 2 + (13:28:58, 14 January 2025)
- PLA-6576, License Condition 2.C.(20)(b)6 + (13:28:58, 14 January 2025)
- 05000388/LER-2009-002, Emergency Service Water Cooling Valves Found Closed Resulting in the Unit 2 C Residual Heat Removal Pump Being Inoperable for Approximately 4 Months + (13:29:02, 14 January 2025)
- ML093080129 + (13:29:03, 14 January 2025)
- W3F1-2009-0062, Response to NRC Request for Additional Information for Alternative W3-ISI-016, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During Third Ten-Year Inservice Inspection Interval + (13:29:04, 14 January 2025)
- W3F1-2009-0059, Response to NRC Request for Additional Information Regarding Request for Alternative W3-ISI-015, Inspection of Reactor Vessel Head In-Core Instrument Nozzles During Third Ten-Year Inservice Inspection Interval + (13:29:05, 14 January 2025)
- ML093080114 + (13:29:07, 14 January 2025)
- ML093080126 + (13:29:07, 14 January 2025)
- Regulatory Guide 1.40 + (13:29:09, 14 January 2025)
- ML093080084 + (13:29:10, 14 January 2025)
- ML093080068 + (13:29:11, 14 January 2025)
- ML093080063 + (13:29:12, 14 January 2025)
- IR 05000272/2009004 + (13:29:21, 14 January 2025)
- ML093080037 + (13:29:22, 14 January 2025)
- ML093080034 + (13:29:24, 14 January 2025)
- ML093080028 + (13:29:25, 14 January 2025)
- ML093080014 + (13:29:26, 14 January 2025)
- ML093080016 + (13:29:26, 14 January 2025)
- ET 09-0026, Notification of Deviation from EPRI Pressurized Water Reactor Secondary Water Chemistry Guidelines + (13:29:27, 14 January 2025)
- 05000461/LER-2009-002, Contractor Falsified Information for Unescorted Access Authorization + (13:29:31, 14 January 2025)
- ML093080011 + (13:29:32, 14 January 2025)
- ML093080010 + (13:29:33, 14 January 2025)
- ML093080009 + (13:29:34, 14 January 2025)
- ML093080008 + (13:29:35, 14 January 2025)
- ML093080007 + (13:29:37, 14 January 2025)
- ML093080006 + (13:29:38, 14 January 2025)
- CP-200901403, Engineering Report ER-ESP-001, Revision 2, Generic Letter 2004-02 Supplemental Response, Cover Page Through Attachment a, Page 30 of 45 + (13:29:39, 14 January 2025)
- ML093080005 + (13:29:39, 14 January 2025)
- ML093080003 + (13:29:40, 14 January 2025)
- ML093080001 + (13:29:41, 14 January 2025)
- ML093070751 + (13:29:42, 14 January 2025)
- ML093070740 + (13:29:43, 14 January 2025)
- ML093070734 + (13:29:44, 14 January 2025)
- ML093070737 + (13:29:44, 14 January 2025)
- ML093070731 + (13:29:48, 14 January 2025)
- ML093070718 + (13:29:49, 14 January 2025)
- ML093070729 + (13:29:49, 14 January 2025)
- IR 05000277/2009404 + (13:29:50, 14 January 2025)
- ML093070526 + (13:29:54, 14 January 2025)
- ML093070521 + (13:29:55, 14 January 2025)
- ML093070513 + (13:29:56, 14 January 2025)
- ML093070512 + (13:29:57, 14 January 2025)