Oct.

23, 2009 Page 1

of 2

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2009-45506 USER INFORMATION:

LACH*ROSE Ad~dres A2 Phone 254-4 7TRAN5SMTTTAL

<INFO)

ON EMPL#:028401 CA#:

0363 I

TO:

10/23/2009 LOCATION: C-U SNRQC^

FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 10/02/2009 ADD MANUAL TABLE OF CONTENTS DATE: 10/22/2009 CATEGORY:

DOCUMENTS TYPE: TRM2 ADO(

Oct.

23, 2009 Page 2

of 2

ID:

TEXT 3.8.7 ADD:

REV:

2 REMOVE:

REV:l CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT LOES ADD:

REV:

54 REMOVE:

REV:53 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

1 Procedure Name TEXT LOES

Title:

LIST OF EF]

0/22/2009 Rev 54 FECTIVE SECTIONS Issue Date 10/22/2009 Change ID Change Number TEXT TOC

Title:

16 09/16/2009 TABLE OF CONTENTS TEXT 1.1 0

11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2. 1

Title:

TEXT 2.2

Title:

TEXT 3. 0

Title:

1 02/04/20P5\\

PLANT PROGRAMS AND SETPOINTS PLANT PROGRA

\\1 8 414/2009/

PLANT PROGRAMS AND SETPOINTS' INSTRUMENT TRIP SETPOINT TABLE

/ 4 05/'23/2008 APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY

/

\\--

K>....

TEXT 3. 1. 1 1

i 11/09/2007

Title:

REACTIVITY/CONTROL\\SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 U

\\

/,,U

Title:

REACTIVITYCONTROL SYSTEMS CONTROL ROD DRIVE N '

.. /

(CRD)

HOUSING SUPPORT TEXT 3.1.3 4

05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8

05/14/2009

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

LDCN 4712 Page 1 of 15 Report Date:

10/22/09 Page I of

.15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 101 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3. 3.1

Title:

INSTRUMENTATION TEXT 3.3.2

Title:

INSTRUMENTATION 0

11/19/2002 RADIATION MONITORING INSTRUMENTATION 2

11/09/2007 SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2

11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5

05/23/2008

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2

10/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1

11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3

05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Page 2.

of 15 Report Date: 10/22/09 Page 2 of

.15 Report Date: 10/22/09

SSES MANUJAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 0

TEXT 3.4.1

Title:

REACTOR TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 1

04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS).

2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005 0

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1

11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of

.15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT 0

11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3

.. 04/16/2009 SYSTEMS C02 SYSTEMS 2

04/16/2009 SYSTEMS HALON SYSTEMS SYSTEMS FIRE SYSTEMS YARD SYSTEMS FIRE SYSTEMS FIRE 2

04/16/2009 HOSE STATIONS 2

04/16/2009 FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 RATED ASSEMBLIES 7

11/09/2007 DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 10/22/09 Page 4 of 15 Report Date: 10/22/09

SSES MANUA-L Manual Name:

TRM2 HManual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2 0

11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1

04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 2

06/27/2008

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2

09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6

06/21/2007

Title:

PLANT SYSTEMS-SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS* (SFSPS)

TEXT 3.7.11 1

10/02/2009

Title:

PLANT SYSTEMS TEXT 3.8.1 2

02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2

11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTI CONTINUOUS TEXT 3.8.2.2 2

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTI AUTOMATIC TEXT 3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES

)N -

)N Page 5 of iR5e j

Report Date: 10/22/09

SSES MANUAL.

Manual Name:

TRM2 0

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.4

Title:

ELECTRICAL TEXT 3.8.5

Title:

ELECTRICAL TEXT 3.8.6

Title:

ELECTRICAL TEXT 3.8.7 1

02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0

11/19/2002 POWER DEGRADED VOLTAGE PROTECTION 0

11/19/2002 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2

10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/.19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

'11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1

04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE Pages of 15 Report Date: 10/22/09 Page 6 of 15 Report Date: 10/22/09

SSES MANUJAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.3

Title:

RADIOACTIVE TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.-2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE.RATE 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -,IODINE,

TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 GASEOUS. RADWASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS 3

11/14/2006 VENTILATION EXHAUST 4

09/16/2009 RADIOACTIVE GASEOUS 1

04/26/2006 TOTAL DOSE 3

04/26/2006 MONITORING PROGRAM 2

04/26/2006 LAND USE CENSUS TREATMENT SYSTEM EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS EFFLUENTS Page2 of 15.

Report Date: 10/22/09 Page 7 of 15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1

Title:

LOADS CONTROL TEXT 3.12.2

Title:

LOADS CONTROL TEXT 3.12.3

Title:

LOADS CONTROL TEXT B3.0 0

11/19/2002 PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL 4

04/17/2008 PROGRAM HEAVY LOADS REQUIREMENTS 0

11/19/2002 PROGRAM LIGHT LOADS REQUIREMENTS 4

05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY O

TEXT B3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM.ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 o0 11/19/2002

Title:

REACTIVITYCONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 3

04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0

11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1

11/09/2007

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION Page8 of 15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION TEXT B3.3.6

Title:

INSTRUMENTATION TEXT B3.3.7

Title:

INSTRUMENTATION TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10

Title:

INSTRUMENTATION TEXT B3.3.11

Title:

INSTRUMENTATION TEXT B3.3.12 2

11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 3

11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 2

11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3

10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 1

11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 BASES TRM RPS INSTRUMENTATION 3

05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION.

1 12/18/2008 BASES REACTOR RECIRCULATION PUMP MG SET STOPS 1

10/22/2003 BASES MVP ISOLATION INSTRUMENTATION 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1

04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY Page 9 of 15 Report Date: 10/22/09 Page 9 of

.15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.3 1

11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5 0

11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

'11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1

04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0

11/19./2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL Page 10 of 15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT 2

01/07/2008 FIRE SUPPRESSION WATER SUPPLY SYSTEM SYSTEMS BASES 2

04/26/2006 SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS 0

11/19/2002 C02 SYSTEMS SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1

04/26/2006 HALON SYSTEMS 1

04/26/2006 FIRE HOSE STATIONS 1

04/26/.2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

- 01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3

Title:

PLANT 0

11/19/2002 SYSTEMS BASES LIQUID HOLDUP TANKS Page ~

of 15 Report Date: 10/22/09 Page 11 of

.15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.6 2

06/27/2008

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2

01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3

Title:

PLANT SYSTEMS BASES SNUBBERS 06/21/2007 TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/,14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11

Title:

STRUCTURAL TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC 1

10/02/2009 INTEGRITY 1

02/04/2005 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR DEVICES OVERCURRENT 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

1

'09/17/2004 POWER BASES MOTOR-OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

TEXT B3.8.3 0

11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL 0

11/19/2002 POWER BASES 24.VDC ELECTRICAL POWER SUBSYSTEM 0

11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION Page 12.

of 15 Report Date: 10/22/09 Page 12 of 15 Report Date: 10/22/09

SSES 14ANTJAIL Manual Name:

TRMI2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.8.6 1

02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1

06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

.MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1

04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE TEXT B3.11.1.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0

11/19/2002 K.

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTAT W

Page 13 of 15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 0

11/19/2002 BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN 0

11/19/2002 BASES GASEOUS RADWASTE TREATMENT SYSTEM 4

1.1/14/2006 BASESoVENTILATION EXHAUST TREATMENT SYSTEM.

EFFLUENT MONITORING 1BS BASES.

01/27/2004 RADIOACTIVE GASEOUS TEXT B3.11.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE' TEXT B3.11.4.1 2

01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1

10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL Page 14 of 15 Report Date: 10/22/09 Page 14 of 15 Report Date: 10/22/09

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.12.2 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 4.1 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4. 3

Title:

ADMINISTRATIVE 0

CONTROLS 09/27/2003 SAFETY LIMIT VIOLATION TEXT 4.4 1

12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES &.,pROGRAMS TEXT 4.5 0

09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4. 6

Title:

TEXT 4. 7

Title:

0 CONTROLS 09/27/2003 RADIATION PROTECTION PROGRAM ADMINISTRATIVE ADMINISTRATIVE 0

09/27/2003 CONTROLS TRAINING Page 15.

of ~

Report Date: 10/22/09 Page 15 of

.15 Report Date: 10/22/09

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 3.1 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Pages TRM / 2.0-9 through TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM 1 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 09/08/2009 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 04/15/2009 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/17/2009 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 3.2 3.3 SUSQUEHANNA

- UNIT 2 TRM / LOES-1 EFFECTIVE DATE 10/20/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 04/12/2007 12/17/1998 10/31/2007 06/02/2005 04/14/2008 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004

,05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.4 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 11/16/2001 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA-UNIT2 TRM / LOES-3 EFFECTIVE DATE 10/20/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 3.9 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Pages 3.8-13 and 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 3.10 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 12/11/2008 05/16/2003 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B &7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-10a through TRM / B 3.7-1 la Pages TRM / B 3.7-12 through TRM / B 3.7.-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3,7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 Effective Date 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 03/09/2001 04/15/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Pages TRM / B 3.7-39 and TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/02/2002 01/28/2005 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 10/20/2009

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 54 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM I B 3.12-2 and TRM / B 3.12-3 TRM2 text LOES.doc 10/15/09 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 10/20/2009

Battery Monitoring and Maintenance Program PPL Rev. 2 3.8.7 3.8.7 Battery Monitoring and Maintenance Program TRO 3.8.7 Battery cell parameters for the Class 1 E 250 V batteries and Class 1E 125 V batteries shall be within limits.

APPLICABILITY:

When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS NOTE -----------------------------------

Separate Condition entry is allowed for each battery.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more batteries A.1 Verify pilot cell electrolyte level 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with one or more battery and float voltage meet cell parameters not within Table 3.8.7-1 Category B Category A limits, limits.

AND A.2 Verify battery cell parameters 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> meet Table 3.8.7-1 Category B limits.

AND Once per 7 days thereafter AND A.3 Restore battery cell parameters 31 Days to Category A limits of Table 3.8.7-1.

B. Required Action A.1 or B.1 Enter TS 3.8.6 Immediately A.2 and associated Completion Time for Condition A not met.

C. Required Action A.3 and C.1 Declare associated battery Immediately associated Completion inoperable.

Time for Condition A not met.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.8-26 EFFECTIVE DATE 05/28/2009

Battery Monitoring and Maintenance Program PPL Rev. 2 3.8.7 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Entry into TS 3.8.6 D.1 Apply equalizing charge to 31 Days Condition C with battery/or affected cell.

electrolyte level below the top of the plates.

AND Verify affected cell meets Table 3.8.7-1 Category A and B Limits for float voltage and temperature.

E. Required Action D.1 and E.1 Declare associated battery Immediately associated Completion inoperable.

Time for Condition D not met.

OR One or more batteries on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with average electrolyte temperature less than the Table 3.8.7-1 Category B Limits.

OR One or more batteries on one 125 VDC electrical power subsystem or on one 250 VDC electrical power subsystem with connection resistance

> 100.0 E-6 ohms for any single connection or the calculated average resistance for the battery is > 50.0 E-6 ohms.

SUSQUEHANNA - UNIT 2 TRM / 3.8-27 EFFECTIVE DATE 11/29/2006

Battery Monitoring and Maintenance Program 3.8.7 PPL Rev. 2 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.7.1 Verify for each terminal and connector:

92 Days No visible corrosion OR

a. < 50.OE-6 ohms; OR
b. < 100.OE-6 ohms with the calculated average resistance for the battery < 50.OE-6 ohms.

TRS 3.8.7.2 Verify average electrolyte temperature (minimum of 10%

92 Days of cells) is within Table 3.8.7-1 Category A limits.

TRS 3.8.7.3 Verify the average of the specific gravity (corrected for 2 Years temperature) of all the connected cells > 1.195 and no cell more than 0.020 below the average.

TRS 3.8.7.4 Verify Battery cells, cell plates, and racks show no visual 2 Years indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

TRS 3.8.7.5 Verify the battery connection resistance is:

2 Years

a. < 100.0 E-6 ohms for any single connection; AND
b. The calculated average resistance for the battery is

< 50.0 E-6 ohms.

SUSQUEHANNA - UNIT 2 TRM / 3.8-28 EFFECTIVE DATE 05/28/2009

Battery Monitoring and Maintenance Program 3.8.7 PPL Rev. 2 Table 3.8-7.1 (page 1 of 1)

Batter/Battery Cell Parameter Requirements CELL CATEGORY A:

CATEGORY B:

PARAMETER LIMITS FOR EACH ALLOWABLE LIMITS CONNECTED CELL FOR EACH CONNECTED CELL Electrolyte Level

_ Minimum level Above top of plates, indication mark, and and not overflowing

< 1/4 inch above maximum level indication mark(a)

Float Voltage

_> 2.13 V

>2.07 V Cell Temperature

>_ 60 Degrees F

> 60 Degrees F (a) It is acceptable for the electrolyte level to temporarily increase above the specified maximum level during and immediately following equalizing charges provided it is not overflowing.

SUSQUEHANNA - UNIT 2 TRM / 3.8-29 EFFECTIVE DATE 10/20/2009