MONTHYEARML0525500522005-09-0101 September 2005 Response to Requested Information Part 2 of NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0603903012006-02-0909 February 2006 GSI Letter RAI Response to GL 2004-02 (TAC Nos. MC4676 and 4677) Project stage: RAI CP-200700085, Supporting Information Regarding the Proprietary Nature of Gothic Code Input Data2007-12-0303 December 2007 Supporting Information Regarding the Proprietary Nature of Gothic Code Input Data Project stage: Request CP-200700090, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2007-12-0303 December 2007 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request CP-200800834, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors2008-06-19019 June 2008 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Project stage: Request ML0817601002008-06-27027 June 2008 Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors, Approval of Extension Request Project stage: Other ML0835004652008-11-26026 November 2008 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter Project stage: Request ML0916604102009-05-11011 May 2009 E-mail Draft Request for Additional Information, Licensees Supplemental Responses Dated February 29 and November 26, 2008, to GL 2004-02 Project stage: Draft RAI ML0916604222009-05-11011 May 2009 Request for Additional Information Supplemental Responses to Generic Letter (GL) 2004-02 Dated 02/29/2008 and 11/26/2008 Project stage: RAI ML0915307112009-06-16016 June 2009 Notice of Meeting with Representatives of Luminant Generation Company Llc., to Discuss Draft Request for Information for Generic Letter 2004-02 Response Project stage: Draft RAI ML0918207102009-07-0202 July 2009 Revised Notice of Meeting with Representatives of Luminant Generation Co., LLC, Comanche Peak to Discuss Draft Request for Information for Generic Letter 2004-02 Response Project stage: Draft RAI ML0919604492009-07-0808 July 2009 Alion Meeting Presentations on RAI 9 - Pool Fill Transport, & RAI 6 - Fiber Erosion Testing Project stage: Request ML0919402772009-07-0909 July 2009 Luminant Holistic Overview: Presentation Will Cover Information Related to RAIs 1 - 5, 7, 12 - 14,16 - 19, 21, 25 - 36 and Overall Response to GL 2004-02 Project stage: Request ML0919400832009-07-0909 July 2009 Pci RAI 8, Test Protocol, Erosion Issue, RAI 15, Test Protocol, Latent Fiber Issue, Areva RAI 20, Test Flume, Fiberglass Larges Question Project stage: Request ML0919400852009-07-0909 July 2009 Luminant RAI 24 and 37, Secondary Line Breaks, Debris Load and Testing Project stage: Request ML0919400842009-07-0909 July 2009 Luminant RAI 22 and 23 SBLOCA, Vortex, Air Ingestion, Void Fraction and Flashing Issues Project stage: Request ML0919402762009-07-0909 July 2009 NRC Opening Remarks Discuss the Draft Us Nuclear Regulatory Commission Request for Additional Information for Generic Letter GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressur Project stage: Draft RAI ML0919403532009-07-13013 July 2009 Notice of Forthcoming Conference Call on July 23, 2009, with Luminant Generation Company LLC to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 Project stage: Draft RAI ML0916707382009-07-15015 July 2009 Request for Additional Information Supplemental Responses to GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0920203432009-07-22022 July 2009 Revised Conference Call with Luminant Generation Company, LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02, Dated May 11, 2009 Project stage: Draft RAI ML0919705782009-07-31031 July 2009 Summary of Category 1 Meeting with Luminant Generation Company LLC, Resolution of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Meeting ML0923300622009-09-0101 September 2009 Summary of Meeting with Luminant Generation Company LLC, to Discuss Draft Request for Additional Information Re Generic Letter 2004-02 for Comanche Peak, Units 1 and 2 Project stage: Draft RAI ML0926107912009-09-10010 September 2009 Supplement Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request CP-200901396, Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors2009-10-12012 October 2009 Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basic Accidents at Pressurized-water Reactors Project stage: Supplement ML0930800032009-10-13013 October 2009 Supplement to Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML1009505642010-04-19019 April 2010 Generic Letter 2004-02 Supplemental Response Project stage: Other ML13045A4102013-02-15015 February 2013 2/28/13 Notice of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting ML13059A2022013-02-28028 February 2013 Email Licensee Slides for 2/28/13 Meeting Via Conference Call Project stage: Meeting ML13059A1812013-02-28028 February 2013 Licensee Slides for 2/28/13 Meeting Via Conference Call with Luminant Generation Company, LLC, Project stage: Meeting ML13067A0292013-03-15015 March 2013 2/28/13 - Summary of Meeting Via Conference Call with Luminant to Discuss Generic Safety Issue 191, Assessment of Debris Accumulation on PWR (Pressurized-Water Reactor) Sump Performance, for Comanche Peak, Units 1 and 2 Project stage: Meeting CP-201300670, Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance2013-05-16016 May 2013 Closure Options for Generic Safety Issue 191 (GSI-191), Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance Project stage: Other ML13267A1972013-09-30030 September 2013 Request for Additional Information, Closure of Option 2a to Address In-Vessel Mitigative Measures for Potential In-Vessel Blockage; Related to Generic Safety Issue 191 Project stage: RAI CP-201301214, Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 1912013-10-31031 October 2013 Response to Request for Additional Information Regarding Closure Options for Generic Safety Issue 191 Project stage: Response to RAI 2009-07-02
[Table View] |
Text
Rafael Flores Senior Vice President
& Chief Nuclear Officer rafael.fiores@Luminant.com Luminant Power P 0 Box 1002 6322 North FM 56 Glen Rose. TX 76043 Luminant T 254 897 5550 C 817 5590403 F 254 897 6652 CP-200901403 TXX-09128 Ref. # GL 2004-02 October 13, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 SUPPLEMENT TO RESPONSE TO NRC GENERIC LETTER (GL) 2004-02, "POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN BASIS ACCIDENTS AT PRESSURIZED-WATER REACTORS"
REFERENCES:
- 1. Letter Logged TXX-08033 from M. Blevins to the NRC, dated February 29, 2008, SUPPLEMENT TO RESPONSE TO NRC GENERIC LETTER (GL) 2004-02
- 2. Letter Logged TXX-08141 from M. Blevins to the NRC, dated November 26, 2008, SUPPLEMENT TO RESPONSE TO NRC GENERIC LETTER (GL) 2004-02
- 3.
SUMMARY
OF JULY 9,2009, CATEGORY 1 MEETING WITH LUMINANT GENERATION COMPANY LLC ON RESOLUTION OF GENERIC LETTER 2004-02, dated July 31, 2009 (TAC NOS. MC4676 AND MC4677) [ML091970578]
- 4. Letter dated July 15, 2009, from Balwant K. Singal (NRC) to Rafael Flores (Luminant) - REQUEST FOR ADDITIONAL INFORMATION REGARDING RESPONSE TO GENERIC LETTER 2004-02 [ML091670738]
- 5. Letter logged TXX-09114 from Raphael Flores to the NRC, dated September 10, 2009, SUPPLEMENT TO RESPONSE TO NRC GENERIC LETTER (GL) 2004-02
- 6.
Summary of August 10, 2009, CATEGORY 1 MEETING with LUMINANT Generation Company LLC on Resolution of GENERIC LETTER 2004-02, dated September 1, 2009 (TAC NOS. MC4676 AND MC4677)
- 7. Letter logged TXX-09126 from Raphael Flores to the NRC dated October 12, 2009, SUPPLEMENT TO RESPONSE TO NRC GENERIC LETTER (GL) 2004-02
Dear Sir or Madam:
By letter dated February 29, 2008 [Reference 1] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML080660596), Luminant Generation Company LLC (Luminant Power) supplemented responses to Generic Letter (GL) 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors," for Comanche Peak, Units 1 and 2. By letter November 26, 2008 [Reference 2] (ADAMS Accession No. ML083500465),
Luminant Power revised the response submitted in Reference 1. This letter provides revision 2 of Engineering Report ER-ESP-001 submitted in References 1 and 2. Luminant Power met with the Nuclear Regulatory Commission (NRC) on July 9, 2009, in a public meeting [Reference 3] addressing NRC questions regarding responses to GL 2004-02 [Reference 41 and subsequently participated in a public A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
U. S. Nucdear Regutatory Commission TXX-09128 Page 2 10/13/2009 phone call on August 10, 2009 [Reference 61 to conclude the discussion of the NRC request for additional information from the public meeting. Luminant Power provided additional information in response to RAI 24 and RAI 37 regarding Secondary Line Breaks to the NRC on September 10, 2009
[Reference 5]. During the August 10th phone call with the NRC, Luminant Power agreed to provide a video of Comanche Peak fiber transport testing to the NRC. Luminant Power provided the video of the Comanche Peak fiber transport testing to the NRC on October '12, 2009 [Reference 7]. The enclosure to this letter provides the Luminant Power Engineering Report for Generic Safety Issue (GSI)-191 containing revised sections addressing the RAIs provided in Reference 4.
This letter contains no new or revised licensing commitments regarding Comanche Peak Units 1 and 2.
Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.
I state under penalty of perjury that the foregoing is true and correct.
Executed on October 13, 2009.
Sincerely, Luminant Generation Company LLC Rafael Flores By:
Fred W. Madden Director, Oversight & Regulatory Affairs Enclosure
- Engineering Report ER-ESP-001 c -