- 05000373/LER-1995-006-01, :on 950210,recirculation Flow Units Rod Block Function Was Inoperable Due to Procedure to Test Flow Unit Inadequate.Procedure Revised + (13:22:58, 14 December 2024)
- ML20081B225 + (13:22:59, 14 December 2024)
- 05000275/LER-1983-019-03, Welding Performed on Additive Tank W/O First Draining Tank of Sodium Hydroxide Solution.Caused by Lack of Communication to Field.No Evidence of Cracks or Corrosion Observed + (13:23:01, 14 December 2024)
- ML20081B218 + (13:23:02, 14 December 2024)
- ML20081B217 + (13:23:02, 14 December 2024)
- ML20081B216 + (13:23:03, 14 December 2024)
- ML20081B214 + (13:23:04, 14 December 2024)
- ML20081B213 + (13:23:05, 14 December 2024)
- ML20081B212 + (13:23:05, 14 December 2024)
- ML20081B210 + (13:23:06, 14 December 2024)
- ML20081B207 + (13:23:07, 14 December 2024)
- TAC:52298 + (13:23:07, 14 December 2024)
- ML20081B200 + (13:23:09, 14 December 2024)
- ML20081B206 + (13:23:09, 14 December 2024)
- ML20081B199 + (13:23:10, 14 December 2024)
- ML20081B197 + (13:23:11, 14 December 2024)
- ML20081B191 + (13:23:12, 14 December 2024)
- ML20081B196 + (13:23:12, 14 December 2024)
- ML20081B190 + (13:23:13, 14 December 2024)
- ML20081B187 + (13:23:13, 14 December 2024)
- ML20081B182 + (13:23:14, 14 December 2024)
- ML20081B179 + (13:23:15, 14 December 2024)
- ML20081B180 + (13:23:15, 14 December 2024)
- ML20081B178 + (13:23:16, 14 December 2024)
- ML20081B176 + (13:23:16, 14 December 2024)
- ML20081B175 + (13:23:17, 14 December 2024)
- ML20081B168 + (13:23:18, 14 December 2024)
- ML20081B163 + (13:23:18, 14 December 2024)
- 05000416/LER-1983-145-03, /03L-0:on 830915,Div II Diesel Generator Starting Air Pressure Dropped Below 160 Psig.Windings in Electric Motor Overheated & Shorted.Caused by Incorrect Pressure Signal Tap Location.Motor Replaced + (13:23:20, 14 December 2024)
- ML20081B157 + (13:23:21, 14 December 2024)
- ML20081B153 + (13:23:22, 14 December 2024)
- ML20081B152 + (13:23:23, 14 December 2024)
- ML20081B148 + (13:23:24, 14 December 2024)
- ML20081B139 + (13:23:25, 14 December 2024)
- ML20081B143 + (13:23:25, 14 December 2024)
- ML20081B136 + (13:23:27, 14 December 2024)
- DCL-84-049, Public Version of Emergency Plan Implementing Procedures, Including Procedure EP G-4 Personnel Accountability & Assembly & EP RB-12 Re Mid & high-range Plant Vent Radiation Monitors & Jm Felton 840302 Release Memo + (13:23:28, 14 December 2024)
- ML20081B134 + (13:23:29, 14 December 2024)
- IR 05000266/1983017 + (13:23:30, 14 December 2024)
- ML20081B126 + (13:23:32, 14 December 2024)
- 05000370/LER-1983-049-03, /03L-0:on 830916,investigation of Cabinet Trouble Alarm Revealed Operate Light for Steam Line 2A Radiation Monitor 2EMF-10 Failed & Could Not Be Restored.Caused by Component Failure.Gm Tube Replaced + (13:23:34, 14 December 2024)
- ML20081B124 + (13:23:35, 14 December 2024)
- ML20081B122 + (13:23:36, 14 December 2024)
- ML20081B111 + (13:23:39, 14 December 2024)
- ML20081B107 + (13:23:40, 14 December 2024)
- 05000331/LER-1983-038-03, /03L-0:on 830920,HPCI Turbine Vacuum Pump 1P-233 Motor Discovered Arcing.Probably Caused by Accumulated Oil on Motor Commutator.Motor Cleaned & Commutator Resurfaced + (13:23:42, 14 December 2024)
- 05000263/LER-1983-020-03, /03L-0:on 830920,diesel Generator 11 Turbocharger Auxiliary Lube Oil Pump Motor Bearing Failed.Cause Not stated.Pump-motor Assembly Replaced + (13:23:44, 14 December 2024)
- 05000251/LER-1983-016-01, /01T-0:on 831004,manual Discharge Valves on Containment Spray Pumps 4A & 4B Discovered Locked in Closed Position.Caused by Personnel Error.Valve for Pump 4B Opened + (13:23:46, 14 December 2024)
- 05000373/LER-1983-115-03, /03L-0:on 830927,Barton Model 288A Switches,Dpis 1B21-N037B & DPIS 1B21-N037D,setpoints Found to Slightly Exceed Tech Spec 3.3.5 Values.Cause Undetermined.Setpoints Recalibr + (13:23:48, 14 December 2024)
- ML20081B086 + (13:23:49, 14 December 2024)
- 05000373/LER-1983-114-03, /03L-0:on 830921,DPIS 1B21-NO24B Reactor Water Level Switch Setpoint Exceeded Tech Spec by 2.5 Inches.Cause Undetermined.Switch Found in Proper Order.Switch Recalibr & Returned to Svc on 830921 + (13:23:50, 14 December 2024)