ML20081B134
| ML20081B134 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/17/1983 |
| From: | Foster D GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| GN-266, NUDOCS 8310270315 | |
| Download: ML20081B134 (1) | |
Text
e Georgia Power Company 333 Pedmont Avenue Attanta. Georg:a 30308 TeWohone 404 526-7726 0 I ' ' 3 h 7.
tfSNR0 Ma ting Address:
U MIA Post office Box 4545 AT t l * '
Atlanta Georg;a 30302 L
B3 0CT 21 M0 : $90rgia Power D. O. Foster the sauthem ekxtnc system Vice Pres: dent and General Manayr Vogtie Project October 17, 1983 United States Nuclear Regulatory Commission File:
X7BG03-M42 Office of Inspection and Enforcement Log:
GN-266 Region II-Suite 3100 101 Marietta Street Atlanta, Georgia 30303
Reference:
Vogtle Electric Generating Plant-Units 1 and 2 50-424, 50-425; Defective Weld Wire Attention:
Mr. James P. O'Reilly Gentlemen:
In previous correspondence concerning the above referenced subject, Georgia Power indicated the expected date for a final report was not known and that the NRC could expect an interim report from Georgia Power Company on October 14, 1983.
Georgia Power Company will complete the engineering evaluation and notify the NRC of the conclusions reached regarding the report-ability of this concern by October 28, 1983.
This letter contains no proprietary information and may be placed in the NRC Public Document Room upon reciept.
Yo s
F e
DOF/REF/cc enclosure xc:
U.
S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 xc:
R. J. Kelly R. H. Pinson E. D. Groover R.
E. Conway B. M. Guthrie L.
T.
Gucwa G.
F. Head R. A. Thomas M. Malcom J.
T.
Beckham Jr.
J. A.
Bailey G. Bockhold D.
N. MacLemore O. Batum P.
D.
Rice D.
E. Dutton H. H. Gregory III J.
L. Vota
,3gyJCIAI. fg p>,1 W.
F. Sanders C. W. Hayes
[1D 8310270315 831017 7
PDR ADOCK 05000424 S
l lg PDR