Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1383, Responds to NRC Request for Addl Info Re RCIC & RWCU Motor Operated Valves Identified in Generic Ltr 89-10,Suppl 3,per + (12:01:21, 14 December 2024)
- 05000440/LER-1991-014, :on 910726,RWCU Isolation Occurred Due to High Differential Temp Signal During Decontamination Activity. Caused by Personnel Error.Event Discussed During Continuing Training for Health Physics Personnel + (12:01:23, 14 December 2024)
- 05000366/LER-1983-121-03, /03L-0:on 831104,review Determined That Core Max Fraction of Limiting Power Density Exceeded Fraction of Thermal Rated Power by 0.4%.Caused by High Core Flux Peak During Control Rod Adjustment.Aprms Adjusted + (12:01:25, 14 December 2024)
- 05000266/LER-1995-002-01, :on 950313,undervoltage Relays Inadvertently Actuated During Mod Work Re Installation of Addl Edgs.Caused by Loose Wire Pulled Out of Wire Lug.Wire Relugged & Relanded + (12:01:27, 14 December 2024)
- ML20082J036 + (12:01:28, 14 December 2024)
- ML20082J035 + (12:01:28, 14 December 2024)
- 05000373/LER-1983-137-01, /01T-0:on 831113,DW Nitrogen Suction Downstream Isolation Valve 11N001B Found Manually Blocked Open.Exact Cause Not Determined.Valve Immediately Repositioned. Handwheels Will Be Removed + (12:01:30, 14 December 2024)
- ML20082J030 + (12:01:31, 14 December 2024)
- 05000331/LER-1991-007, :on 910806,inadvertent Inboard High Pressure Coolant Injection Steamline Isolation Occurred.Caused by Personnel Error.Rcic Speed Sensors Replaced & RCIC Turbine Insulation Pad Stenciled + (12:01:36, 14 December 2024)
- ML20082J025 + (12:01:37, 14 December 2024)
- ML20082J024 + (12:01:38, 14 December 2024)
- ML20082J023 + (12:01:38, 14 December 2024)
- 05000331/LER-1991-008, :on 910807,automatic Emergency Diesel Generator Start Occurred.Caused by Momentary Emergency Bus Undervoltage During Electrical Storm.Rwcu Sys Placed Back in Svc + (12:01:40, 14 December 2024)
- ML20082J018 + (12:01:44, 14 December 2024)
- 05000440/LER-1991-013, :on 910723,tech Spec Violation Occurred Due to Missed Main Steam Line Flow High Isolation Actuation Instrumentation Surveillance.Caused by Personnel Error. Requalification Training Program Established + (12:01:46, 14 December 2024)
- 05000366/LER-1983-112-03, /03L-0:on 831028,RHR Testable Check Valve B (2E11-F050B) Found Open & Would Not Close.Caused by Personnel Installing Air Supply Lines Backwards.Lines Corrected + (12:01:48, 14 December 2024)
- ML20082J007 + (12:01:49, 14 December 2024)
- ML20082J006 + (12:01:50, 14 December 2024)
- ML20082J003 + (12:01:51, 14 December 2024)
- ML20082J000 + (12:01:52, 14 December 2024)
- ML20082H999 + (12:01:52, 14 December 2024)
- 05000321/LER-1983-103-03, /03L-0:on 831025,filter Paper for Air Particulate Monitor 1D11-K631 Would Not Advance.Caused by Tear in Paper. Paper Advanced Beyond Tear & Rethreaded + (12:01:54, 14 December 2024)
- JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles + (12:01:55, 14 December 2024)
- 05000281/LER-1983-050-03, /03L-0:on 831027,w/unit at Full Power,Charging Pump Svc Water Pump 2-SW-P-10B Lost Sufficient Discharge Pressure.Caused by Clogged in-line Strainer.Fine Mesh in Strainer Removed + (12:01:57, 14 December 2024)
- ML20082H994 + (12:01:58, 14 December 2024)
- ML20082H989 + (12:01:59, 14 December 2024)
- U-601874, Forwards Clinton Power Station Semiannual Radioactive Effluent Release Rept for Jan-June 1990 & Clinton Power Station Unit 1 Offsite Dose Calculation Manual + (12:02:00, 14 December 2024)
- ML20082H986 + (12:02:00, 14 December 2024)
- ML20082H985 + (12:02:01, 14 December 2024)
- ML20082H981 + (12:02:02, 14 December 2024)
- ML20082H984 + (12:02:02, 14 December 2024)
- ML20082H979 + (12:02:03, 14 December 2024)
- ML20082H977 + (12:02:03, 14 December 2024)
- HL-4825, Monthly Operating Repts for Mar 1995 for Ei Hatch Nuclear Plant + (12:02:04, 14 December 2024)
- ML20082H974 + (12:02:05, 14 December 2024)
- ML20082H973 + (12:02:05, 14 December 2024)
- RBG-41421, Monthly Operating Rept for Mar 1995 for River Bend Station + (12:02:06, 14 December 2024)
- ML20082H968 + (12:02:07, 14 December 2024)
- ML20082H965 + (12:02:07, 14 December 2024)
- ML20082H963 + (12:02:08, 14 December 2024)
- ML20082H964 + (12:02:08, 14 December 2024)
- BECO-LTR-95-047, Monthly Operating Rept for Mar 1995 for Pilgrim Nuclear Power Station + (12:02:09, 14 December 2024)
- ML20082H958 + (12:02:10, 14 December 2024)
- ML20082H955 + (12:02:11, 14 December 2024)
- ML20082H954 + (12:02:12, 14 December 2024)
- ML20082H950 + (12:02:13, 14 December 2024)
- ML20082H949 + (12:02:14, 14 December 2024)
- 05000416/LER-1983-168-03, /03L-0:on 831023,during Attempts to Operate RCIC Steam Line Warmup Valve F076,breaker Repeatedly Tripped.Caused by Burnt Off Insulation on Motor Winding. Motor Rotated Out of Insulation + (12:02:15, 14 December 2024)
- FVY-83-119, Responds to IE Bulletin 83-06.No Evidence Found That Nonconforming Matl Supplied by Tube-Line Corp Facilities Provided for Use at Facility + (12:02:16, 14 December 2024)
- ML20082H937 + (12:02:17, 14 December 2024)
- ML20082H934 + (12:02:18, 14 December 2024)
- ML20082H920 + (12:02:18, 14 December 2024)