Monthly Operating Rept for Mar 1995 for River Bend Station
ML20082H970
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/31/1995
From: Bolke T, James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-95-0095, RBF1-95-95, RBG-41421, NUDOCS 9504180006
Download: ML20082H970 (6)


Text

..

L j Entergy oper-tions,Inc. I River Bend Station

!* 5485 U.S. Highway 61

*e Egyggav P.O. Box 220

~#

l EREEEWHI St. Francisville, LA 70775

'- . Tel 504 336 6225 1 Fax 504 635 5068

]

1 James J. Fisicaro j Director Nuclear Safety l

l April 10,1995 U.S. Nuclear Regulatory Commission l Document Control Desk M/S P1-37 Washington, DC 20555 l

Subject:

River Bend Station - Unit 1 Docket No. 50-458 I

l Monthly Operating Repon File No.: G9.5, G4.25 RBG- 41421 RBF1-95-0095 l

l Gentlemen:

In accordance with River Bend Station (RBS) Technical Specification 6.9.1.6, enclosed is the March 1995 Monthly Operating Repon for RBS - Unit 1.

Sincerely,

.hw2 W har44.r-KDG/

enclosure 1S0055 i

9504180006 950331 PDR ADDCK 05000458

%s@d{j l R PDR .)

i l

hfarch 1995 Monthly Operating Report April 10,1995 RBG-41421 RBF1-95-0095 Page 2 of 2 cc: U. S. Nuclear Regulatory Commission -

Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P.O. Box 1051 St. Francisville, LA 70775 INPO Records Center 1100 Circle 75 Parkway Atlanta, GA 30339 Chester R. Oberg PUCT 7800 Shoal Creek Blvd., Suite 400N Austin, TX 78757 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CN 06107 Cajun Electric Power Co-op, Inc.

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO. R-95-03 DATE April 10.1995 COMPLETED BY T. J. Bolke TITLE Eneineer III TELEPHONE 504-346-8651 ext. 2940 MONTH March.1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net) (MWe-Net)

1. 941.8 17. 936.3
2. 942.8 18. 937.2
3. 940.6 19. 937.2
4. 835.5 20. 932.5
5. 932.7 21. 931.4
6. 929.8 22, 929.8
7. 934.8 23. 927.9
8. 943.2 24. 932.2
9. 943.0 25. 933.7
10. 937.8 26. 929.0
11. 935.8 27. 932.9
12. 934.6 28. -

937.2

13. 933.3 29. 938.0
14. 934.9 30. 937.3
15. 935.4 31. 940.8
16. 935.3

DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO. R-95-03 DATE April 10.1995 COMPLETED BY T. J. Bolke TITLE Engineer III TELEPHONE 504-346-8651 ext. 2940 PAGE I OF 2_.

OPERATING STATUS

1. REPORTING PERIOD: March.1995 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 2894 i

MAX. DEPEND CAPACITY (MWe-Net): 236 DESIGN ELECTRICAL RATING (MWe-Net): 236

. 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): N/A l 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS YR TO CUMU-MONTH DATE LATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160.0 58656.2
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 2160.0 55599.1
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2.145.034 6.232.536 149.305.549
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 738.507 2.151.824 50.533.879.

l 11. NET ELECTRICAL ENERGY GENERATED (MWH) 693.707 2.020.183. 47.295.915 i-

l

, DOCKET NO. 50/458 l RIVER BEND STATION UNIT 1 REPORT NO. R-95-03 DATE April 10.1995 i l

COMPLETED BY T. J. Bolke  !

TITLE Engineer HI l TELEPIsONE 504-346-8651 ext. 2940 l

PAGE 2 OF 2 OPERATING STATUS THIS YR TO CUMU.

MONTH DATE LATIVE

12. REACTOR SERVICE FACTOR 100.0 100.0 71.6 13 REACTOR AVAILABILITY FACTOR 100.0 100.0 71.6 l l l
14. UNIT SERVICE FACTOR 100.0 100.0 69.3 j
15. UNIT AVAILABILITY FACTOR 100.0 100.0 69.3
16. UNIT CAPACITY FACTOR (USING MDC) 99.6 99.9 64.2
17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 99.6 99.9 64.2
18. UNIT FORCED OUTAGE RATE 0.0 0.0 13.7 l 19. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACII):

NO SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS

20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

N/A l

l r

~ '

UNIT SHUTDOWNS AND POWER REDUCTIONS TIME TIAE START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /

NO. DATE OCCURRENCE OCCURRENCE (HOURS) COMAENTS NOTE (1) NOTE (2) NOTE (3)

None SUhBIARY:

NOTE (1) TYPE OF OCCURRENCE: ENTER CODE DOCKETNO. 50/458 F: FORCED RIVER BEND STATION UNIT 1 S: SCHEDULED NOTE (2) REASON FOR OCCURRENCE: ENTER CODE REPORT NO. R-95-03 A: EQUIPAENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS /COMhENTS)

B: MAINTENANCE OR TEST REPORT MONTH March.1995 C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION DATE ADril 10.1995 F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) T. J. Bolke H: OTHER (EXPLAIN IN CORRECTIVE ACTIONS /CONBENTS) OMPLETED Y NOTE (3) hETHOD OF SHIJTTING DOWN REACTOR OR REDUCING POWER- ENTER ONE  !  !

$1GNATURE I. MANUAL

2. MANUAL SCRAM Engineer III
3. AUTOMATIC SCRAM TITLE
4. OTHER(EXPLAIN IN CORRECTIVE ACTION /CONBENTS)

TELEPHONE: 504-346-8651 ext. 2940

[

_ _ _ _ _ _ _ _