Monthly Operating Repts for Mar 1995 for Limerick Nuclear Station
ML20082H974
Person / Time
Site: Limerick  
Issue date: 03/31/1995
From: Henricks D, Muntz J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9504180007
Download: ML20082H974 (12)


Text

.

L.,

u,,,.m e.m.

o...,.

t PECO ENERGY

"; Li;'s '"""""

Sanatoga, PA 19464-0920 l

l

!1 T.S.6.9.1.6 April 13, 1995 Docket'Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 I

U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Limerick Generating; Station Monthly Operating.

Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick-Units 1'and 2 for the month of March 1995 forwarded pursuant to Technical Specification 5.9.1.6.

Very truly yours, dfML James A. Muntz Director - Site Engineering drh l

)

Enclosures cc:

T. T. Martin, Administrator, Region I, USNRC l_

N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS JST056 l'

9504180007 950331 r+-

/

I

'PDR ADOCK 05000352 U

/((/[,

,R-PDR b

,N

i.

i ' '..

i i

Docket No.60-362 1

Attachment to Monthly i

Operating Report for -

)

March 1996 i

i 1-4 i

Limerick Generating Station -

I;

. Unit 1 March 1 through March 31,1996 1

l.

Narrative Summary d Operatirg Exneriences 3

I l

Unit 1 began the month of March at a nominal 100% d rated thermal power (RTP).

On March 12,1996, at 0929 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.534845e-4 months <br />, power was reduced to 92% RTP'for main turbine valve L

testing. Power was restored to 100% RTP at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />.

i Unit 1 ended this operating ' period at 100% of RTP.

11.

Challenges to Main Steam Safety Relief Valves i

l There were no challenges to the Main Steam Safety Relief Valves during the month of March i

4-1 1

i 4

4-l-

3 4

l 1

4 4

J 4

OVER GE DAILV UNET POWER LEVEL

- ' {

DOCKET NO. 50 - 352-UNIT LIMERICK UNIT 1

=...----..............

DATE APRIL 13 1995 COMPANY PECO ENERGY COMPANY

....=_

DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH MARCH 1995

.....=_

, j.

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

~

(MwE-NET) 1 1061 17 1061 2

1069 18 1057 3

1053 19 1062 4

1069 20 1062 5

1065 21 1058 6

1073

,22

.1062 s

7 1050 23.

1054 8

1061 24 -

1063

'9 1065 25

'1062 to 1069 26 1054 11-1065 27 1059

- i 12 1057 28 1058 :

13

.1061 29 1058 14 1057 30 1053 I

15 1053 31

'1057 16 1053 i

. 3 i

%m. i m. m.

..cm m

.___________--_<r, d- -.,

m b,.

ir 4~w

,,.,,,v.-.

t OPERATING DATO CEPORT DOCKET NO. 50 - 352 DATE APRIL 13. 1995 COMPLETED BY PECO ENERGY COMPANY

.... = = - _ _. _ = - - - - _ _ - _.. -.......

DAVID R.

HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610).718-3772 OPERATING STATUS 5

=-

.._..----.....=_ ---

1. UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WERE NO LOAD DROPS
2. REPORTING PERIOD:

MARCH. 1995 GREATER THAN 20% THIS MONTH.

.=........

3.

LICENSED THERMAL POWER (MWT):

3293 4 NAMEPLATE RATING (GROSS MWE):

1092

5. DESIGN ELECTRICAL RATING (NET MWE):

1055 l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1055

(-

=_.

8.

IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7).SINCE.LAST REPORT. GIVE REASONS:

PLEASE SEE THE ATTACHED SHEET FOR REASONS TO CHANGE THE NAM 5 PLATE RATING 9.

POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):

10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE' 11 HOURS IN REPORTING PERIOD 744 2.160 80.304

==

-==

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2.140.5 66.248.8

.....=

13. REACTOR RESERVE SHUTDOWN HOURS-0.0 0.0 0.0

= -.

14 HOURS GENERATOR ON-LINE 744.0 2.122.2 65.147.7

=_

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

=.

=_-

16. GROSS THERMAL ENERGY GENERATED (MWH) 2.448.206 6.955.718' 201.272.256

- _ =.

= - -

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 814.200 2,276.300 65.46G.580

'18.

NET ELECTRICAL ENERGV GENERATED (MWH) 788.638 2.200.614 62.844.620 PAGE 1 OF '2 l

4

~

OPEQQTING DGTO CEPOSV (CONT 3NUED)

' DOCKET NO. 50 - 352[

~

DATE APRIL 13 1995~

THIS MONTH VR-TO-DATE COMULATIVE'

19. UNIT SERVICE FACTOR 100.0 98.2 81.1
20. UNIT AVAILABILITV FACTOR 100.0 98.2 61.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.5 96.6-T4.2

.==

7 22.. UNIT CAPACITY FACTOR (USING DER NET) 100.5 96.6 74

23. UNIT FORCED OUTAGE RATE O.0 1.8 4.2' 24 SHUTDOWNS SCHEDULED OVER NEXT-6 MONTHS (TVPE DATE A DURATION OF EACH):

A 4 DAY PLANNED OUTAGE (TENTATIVE) IS SCHEDULED ON MAY 8-11.1995 FOR BOP ISSUES: DRAIN COOLER REPAIR AND CONDENSER CLEANING.

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

'26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITV MID' APRIL 85 4/13/85 COMMERCIAL OPERATION

'1ST OTR 86 2/01/86 f.

i PAGE 2 OF 2 t

4

-.x

i

[

OPEllATING DATA REPORT (ADDITIONAL PAGE) l Ooeratina Status I-l 8.

If changes occur in capacity ratings (items number 3 through 7) since last report, l

give reasons:

3 i

i The Nameplate Rating (Gross MWe), item Number.4, has been changed l

from 1138 MWe to 1092 MWe.1138 MWe represents the gross output with j

the Turbine Control Valves Wide Open (VWO). Umerick's Unit 1 licensed ~

i maximum reactor power will not produce enough steam to operate at VWO, therefore the nameplate rating has been adjusted to 1092 MWe.1092 MWe

{

represents the output derived from the turbine manufacture's heat balance j

st the licensed maximum reactor power. The Limerick Unit 2 Nameplate l

Rating has already been established at its maximum reactor power rating j

following the Power UpRate last month.

t t

i I

i

.i l

l i~

i 4

l i

1 i-t

,m--

y w

w

UNIV SHUTDOWNS CND POCER CEDUCTIONS DOCCIET NO. 50 - 332 UNIT NAME LIMERICK UNIT 1 DATE APRIL ~ 13, 1995 REPORT MONTH MARCH. 1995 COMPLETED BY PECO ENERGV COMPANY DAVID R.

HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772

--- _---....-------.---_=

_ ----==

. - - - - - - - - - - - -.. - = _ - _ -

METHOD OF LICENSEE SYSTEM ' COMPONENT

'CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE-(1)

(HOURS)

(2)

REACTOR (3)

REPORT *

(4)

(5)

PREVENT RECURRENCE

= _ _ _.

_=-

...----=

54 950312 S

000.0 B

4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 92% FOR MAIN TURBINE VALVE-TESTING.

(1)

(2)

(3)

(4)

[

F - FORCED REASON METHOD EXHIBIT'G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)-

1-- MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

- EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4--

OTHER (EXPLAIN)

FILE'(NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION P - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE 9

l l

Docket No. 50-353 Attachment to Monthly 1

Operating Report for i-March 1995 i

1 Umorick Generating Station 3

l Unit 2 March 1 through March 31,1995 -

i 1.

Narrative Summary d Onoratino Experiences Unit 2 began the month d March at a nominal 100% of rated thermal power (RF),

i On March 2,1996, at 1011 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.846855e-4 months <br />, power was reduced to 80% RTP for performance of t:mwer ARTS MELLA testing. Power was restored to 100% RTP at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> l

On March 19,1996, at 0202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br />, power was reduced to 90% RTP for main turbins valve testing.' Power was restored to 100% RTP at 0346 hours0.004 days <br />0.0961 hours <br />5.720899e-4 weeks <br />1.31653e-4 months <br /> Unit 2 ended this operating period at 100% of RTP.

i il.

Challenoes to Main Steam Safety Relief Valves 1

i' There were no challenges to the Main Steam Safety Relief Valves during the month of March.

1 l.

l i

I' 4

s f

i i

1 1

aa.-

e i!

, _ ~

OVEE GE DQILV UNIT POWEQ' LEVEL DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2~

DATE APRIL 13 1995

.~

COMPANY PECO ENERGY COMPANY DAVID R.

HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 7tP3772 MONTH MARCH 1995 DAY AVERAGE DAILV POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET)

-1 1137 17 1131 2

1121 18

-1126 3

1129 19

'1132 4

4 1145 20 1132 5

1141

'21 1128 6

1148-22 1132 1-7 1120 23 1124 8

1139 24 1128 9

1135 25

'1128 10 1140 26

.1124 11 1135 27

'1128 12 1136.

28 1128 13 1132 29 1128 14 1133

' 30 1124 15

1128 31 1124 16 1123

-.. m-

_-_---__._ru1mr___>w,am w -a m

e w

dp swq

-1' tb'**W*-

-9*d e

eta m'w-:-

e se

OPERATING DQTQ REPORT DOCKET NO. 50 - 353

..s.

DATE APRIL 13 1995 COMPLETED BY.PECO ENERGV. COMPANY

. DAVID R.

HENRICKS REPORTS ENGINEER.

SITE ENGINEERING -

LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 2

. NOTES: THERE WERE NO LOAD DROPS

2. REPORTING PERIOD MARCH. 1995 GREATER THAN 20% THIS MONTH.

3.

LICENSED THERMAL POWER (MWT):

3458

- 4.. NAMEPLATE RATING (GROSS MWE) :

1163

5. DESIGN ELECTRICAL RATING (NET MWE)'s 1115

.[

6. MAXIMUM DEPENDABLE CAPACITV'(GROSS MWE): 115 7.

MAXIMUM DEPENDABLE CAPACITV (NET MWE):

1115

- l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

9.

POWFP. LEVEL' TO WHICH RESTRICTED, IF ANV (NET MWE):

10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH:

YR-TO-DATE

. CUMULATIVE 11 HOURS IN REPORTING PERIOD

'744 2.160 45.816-

12. NUMBER : OF HOURS REACTOR WAS CRITICAL 744.0 1.640.4 41.003.4
13. REACTOR RESERVE SMUTDOWN HOURS.

0.0

'O.O

-0.0 14 HOURS GENERATOR ON-LINE 744.0 1.532.8 40,137.7

15. : UNIT. RESERVE SHUTDOWN HOURS 0.0;

. 0.0 OO-

~16.

GROSS THERMAL ENERGY GENERATED (MWH) 2.569.104-~

4 062.255

'126.291.838 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 867.200-

'1.342.200 41.725.780

18. NET ELECTRICAL ENERGY GENERATED (MWM) 841.460 1,289.217 43,191.417-PAGE 1 OF'2 L

._-___L__.__--__....,..~.-

a-

.._, g..

m_

~.

..__.._m..

.._..-~.m._..___.m...

.m.___.---._.m.

..___._.m.m_...

.m OPERATING DATO GEPORT (CONTINUED)

'DOCCIET NO. 50 - 353 b

DATE APRIL 13 1995

~

f THIS MONTH

'YR-TO-DATE CUMULATIVE 4

19. UNIT SERVICE FACTOR 100.0

~71.0

- 87.6

=.-

20.-UNIT AVAILABILITV FACTOR 100.0 71.0-87.6 21.: UNIT CAPACITY FACTOR-(USING MDC NET) 101.4

54. 5 '.

83.1

22. UNIT CAPACITY FACTOR (USING DER NET) 101.4 54.5 83.1
23. UNIT FORCED OUTAGE RATE O.0

-4 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF.EACH):

25. IF-SHUTDOWN'AT END OF REPORT' PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY

-08/12/89

.08/12/89.

/I INITIAL ELECTRICITY 09/01/89

-'09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90-1 6

s I

g s

4 i

.p

.{

u.

J PAGE 2 OF 2 i

f t-i-

4-d' 4,

4-i i

i 1

?

.?

-- l 1

....m...

n.

___.1.m.__,___..______m.._-

_._;.__m___.

.n

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 e'

UNIT NAME LIMERICK UNIT 2 DATE APRIL 13, 1995 t

REPORT MONTH MARCH. 1995 COMPLETED BY PECO ENERGY-COMPANY DAVID R.

HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MET D OF LICENSEE.lSYSTEM COMPbMENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT l CODE CODE ACTION TO

- NO.

DATE' (1)

(HOURS)

(2)

REACTOR (3)

REPORT

  • I (4)

(5)

PREVENT RECURRENCE

~ - -

C3 950302 5

000.0 B

4 N/A RC FUELXX RLACTOR POWER WAS REDUCED TO 80% FOR THE PEOFORMANCE OF POWER ARTS MELLA TESTING.

' 41 950319-5 000.0 B

4 N/A HA VALVEX RE/.CTOR POWER WAS REDUCED TO 90% FOR l

MA1M TURBINE VALVE TESTING.

l.

(1)

(2)

(3)

(4)

F-FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT-FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF-DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

~ ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN) t H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE' T

u.

e.~-

- -, _ _., - -. _ _ -