PECO ENERGY "; Li;'s '"""""
Sanatoga, PA 19464-0920 l
l
!1 .,
T.S.6.9.1.6 April 13, 1995 Docket'Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 l
l I
U. S. Nuclear Regulatory Commission l Attn: Document Control Desk Washington, DC 20555 !
Subject:
Limerick Generating; Station Monthly Operating.
Report For Units 1 and 2 ,
Enclosed are the monthly operating reports for Limerick-Units 1'and 2 for the month of March 1995 forwarded pursuant to Technical Specification 5.9.1.6. .
Very truly yours, ;
dfML -
James A. Muntz <
Director - Site Engineering drh l l
I Enclosures
)
cc: T. T. Martin, Administrator, Region I, USNRC l_
N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS JST056 l' 9504180007 950331 r+- / I
'PDR ADOCK 05000352 U
,R- PDR , /((/[,
b _
,N
i.; - ,
i ' '. .
i -
i
... Docket No.60-362 1
Attachment to Monthly i Operating Report for -
) March 1996 i
i 1-4 i Limerick Generating Station -
I; . Unit 1
! March 1 through March 31,1996 1
! l. Narrative Summary d Operatirg Exneriences ,
3 I
Unit 1 began the month of March at a nominal 100% d rated thermal power (RTP).
l
,! On March 12,1996, at 0929 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.534845e-4 months <br />, power was reduced to 92% RTP'for main turbine valve L testing. Power was restored to 100% RTP at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />.
i Unit 1 ended this operating ' period at 100% of RTP.
! 11. Challenges to Main Steam Safety Relief Valves i
l There were no challenges to the Main Steam Safety Relief Valves during the month of March i
4-1 1
i 4
4-l-
3 4
l 1
4 4
J 4
OVER GE DAILV UNET POWER LEVEL . , .
-'{
DOCKET NO. 50 - 352- .
UNIT LIMERICK UNIT 1
=...---- ..............
DATE APRIL 13 1995 .
COMPANY PECO ENERGY COMPANY
....=_ _ _ _ - ........... . ,
DAVID R. HENRICKS !
REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH MARCH 1995
.....=_
, j.
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
~
(MWE-NET) (MwE-NET) 1 1061 17 1061 2 1069 18 1057 3 1053 19 1062 4 1069 20 1062 5 1065 21 1058 6 1073 ,22 .1062 s 7 1050 23. 1054 8 1061 24 - 1063
'9 1065 25 '1062 to 1069 26 1054
-i 11- 1065 27 1059 12 1057 28 1058 :
13 .1061 29 1058 ;
14 1057 30 1053 I 15 1053 31 '1057 16 1053 i
.3 i
%m._i_m._m.__._.cm__ m .___________--_<r, d- - ., - m b,. ir -- , ,, 4~w . ,- .. -,, ,. ,, < . , , . . , .._...#-.. . , _ , - ,,.,,,v.-.
t OPERATING DATO CEPORT .
DOCKET NO. 50 - 352 .
DATE APRIL 13. 1995 COMPLETED BY PECO ENERGY COMPANY .
. . . . = = - _ _ . _ = - - - - _ _ - _ . . - . . . . . . .
DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610).718-3772 OPERATING STATUS
=- .._..----.....=_ --- _ - -
- 1. UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WERE NO LOAD DROPS
- 2. REPORTING PERIOD: MARCH. 1995 GREATER THAN 20% THIS MONTH.
--- __ .=........
- 3. LICENSED THERMAL POWER (MWT): 3293 4 NAMEPLATE RATING (GROSS MWE): 1092
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1055 l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1055
=_. ______- _
(-
- 8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7).SINCE.LAST REPORT. GIVE REASONS:
PLEASE SEE THE ATTACHED SHEET FOR REASONS TO CHANGE THE NAM 5 PLATE RATING
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE' 11 HOURS IN REPORTING PERIOD
==
744 2.160 80.304
- == .. .. ...--. --- ........
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2.140.5 66.248.8
.-. .....__ .....=
- 13. REACTOR RESERVE SHUTDOWN HOURS- 0.0 0.0 0.0
...-. = - . _ --..... ......-
14 HOURS GENERATOR ON-LINE 744.0 2.122.2 65.147.7
=_ . . . . - - --
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
..... =. ......_ =_- __- _ - - -
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.448.206 6.955.718' 201.272.256
___ - _ = . _ = - - ......___
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 814.200 2,276.300 65.46G.580
'18. NET ELECTRICAL ENERGV GENERATED (MWH) 788.638 2.200.614 62.844.620 PAGE 1 OF '2
~ .;-
~
OPEQQTING DGTO CEPOSV (CONT 3NUED) ' DOCKET NO. 50 - 352[ ..
DATE APRIL 13 1995~ ' '
THIS MONTH VR-TO-DATE COMULATIVE'
- 19. UNIT SERVICE FACTOR 100.0 98.2 81.1
- 20. UNIT AVAILABILITV FACTOR 100.0 98.2 61.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.5 96.6- T4.2 *
.== .--------....
22.. UNIT CAPACITY FACTOR (USING DER NET) 100.5 96.6 74 '
- 23. UNIT FORCED OUTAGE RATE O.0 1.8 4.2' 24 SHUTDOWNS SCHEDULED OVER NEXT- 6 MONTHS (TVPE DATE A DURATION OF EACH):
A 4 DAY PLANNED OUTAGE (TENTATIVE) IS SCHEDULED ON MAY 8-11.1995 FOR BOP ISSUES: DRAIN COOLER REPAIR AND CONDENSER CLEANING.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:
'26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED '
INITIAL CRITICALITY 12/19/84 12/22/84 .
INITIAL ELECTRICITV MID' APRIL 85 4/13/85 COMMERCIAL OPERATION '1ST OTR 86 2/01/86 f.
i PAGE 2 OF 2 t
4
- . . . . - - . . _ - _ _ . . - _ . _ . . . . - . . ..---.--_--__.________._-.________-_.x
i
[ OPEllATING DATA REPORT
, (ADDITIONAL PAGE) l Ooeratina Status I-l
- 8. If changes occur in capacity ratings (items number 3 through 7) since last report, give reasons: 3 l
i i The Nameplate Rating (Gross MWe), item Number.4, has been changed l from 1138 MWe to 1092 MWe.1138 MWe represents the gross output with j the Turbine Control Valves Wide Open (VWO). Umerick's Unit 1 licensed ~
i maximum reactor power will not produce enough steam to operate at VWO,
! therefore the nameplate rating has been adjusted to 1092 MWe.1092 MWe
{ represents the output derived from the turbine manufacture's heat balance j st the licensed maximum reactor power. The Limerick Unit 2 Nameplate l Rating has already been established at its maximum reactor power rating j following the Power UpRate last month.
t t
i '
I ,
i
.i l
l i~
i 4
l i
1 i-t
,m-- ,,- ,- y w w -- ,
UNIV SHUTDOWNS CND POCER CEDUCTIONS DOCCIET NO. 50 - 332 UNIT NAME LIMERICK UNIT 1 DATE APRIL ~ 13, 1995 ,
REPORT MONTH MARCH. 1995 COMPLETED BY PECO ENERGV COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772
--- _---... .-------.---_=
_ ----== -
- - _ _ - - . - - - - - - - _ _ - - - - - - - - . - - - - . . . - - - _ _ . - - - - - - - - - - - - . . - = _ - _ -
METHOD OF LICENSEE SYSTEM ' COMPONENT 'CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE- (1) (HOURS) (2) REACTOR (3) REPORT * (4) (5) PREVENT RECURRENCE
...-...--. _ = _ _ _ . _=- --_ -_---_ - - - _ . ...----=
54 950312 S 000.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 92% FOR MAIN TURBINE VALVE-TESTING.
(1) (2) (3) (4) [
F - FORCED REASON METHOD EXHIBIT'G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)- 1-- MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. - EVENT REPORT (LER)
D - REGULATORY RESTRICTION .
4-- OTHER (EXPLAIN) FILE'(NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION P - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE 9
l -
l .
Docket No. 50-353 1
Attachment to Monthly ;
Operating Report for i- March 1995 i 1 3
Umorick Generating Station l Unit 2 March 1 through March 31,1995 -
i l
! 1. Narrative Summary d Onoratino Experiences
! Unit 2 began the month d March at a nominal 100% of rated thermal power (RF),
i <
- On March 2,1996, at 1011 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.846855e-4 months <br />, power was reduced to 80% RTP for performance of t
- mwer
! ARTS MELLA testing. Power was restored to 100% RTP at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> On March 19,1996, at 0202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br />, power was reduced to 90% RTP for main turbins valve l testing.' Power was restored to 100% RTP at 0346 hours0.004 days <br />0.0961 hours <br />5.720899e-4 weeks <br />1.31653e-4 months <br />
- Unit 2 ended this operating period at 100% of RTP.
i il. Challenoes to Main Steam Safety Relief Valves 1
i There were no challenges to the Main Steam Safety Relief Valves during the month of March.
1 l.
l i
I' 4
s f
i i
1 1
aa.- e i
_ _ . -- , _ ~ , .. , . - , - . - - . - . . , - . - . ,
OVEE GE DQILV UNIT POWEQ' LEVEL .
DOCKET NO. 50 - 353 .
UNIT LIMERICK UNIT 2~
DATE APRIL 13 1995 ; .~
COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 7tP3772 MONTH MARCH 1995 DAY AVERAGE DAILV POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET)
-1 1137 17 1131 2 1121 18 -1126 3 1129 19 '1132 4
4 1145 20 1132 5 1141 '21 1128 6 1148- 22 1132 1-7 1120 23 1124 8 1139 24 1128 9 1135 25 '1128 10 1140 26 .1124 ,
11 1135 27 '1128 12 1136. 28 1128 13 1132 29 1128 14 1133 ' 30 1124 15 : 1128 31 1124 -
16 1123
- _ _ -.._m- _-_---__._ru1mr___>w,am _ , _ _ * - w_-a m_ e w dp swq -1' tb'**W*- -9*d *
- e eta m'w-:- e se
OPERATING DQTQ REPORT .
DOCKET NO. 50 - 353 . .s .
DATE APRIL 13 1995 COMPLETED BY.PECO ENERGV. COMPANY ,
. DAVID R. HENRICKS ,
REPORTS ENGINEER.
SITE ENGINEERING -
LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 ,
OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 2 . NOTES: THERE WERE NO LOAD DROPS
- 2. REPORTING PERIOD MARCH. 1995 GREATER THAN 20% THIS MONTH.
- 3. LICENSED THERMAL POWER (MWT): 3458 4.. NAMEPLATE RATING (GROSS MWE) : 1163
- 5. DESIGN ELECTRICAL RATING (NET MWE)'s 1115 .[
- 6. MAXIMUM DEPENDABLE CAPACITV'(GROSS MWE): 115
- 7. MAXIMUM DEPENDABLE CAPACITV (NET MWE): 1115 - l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWFP. LEVEL' TO WHICH RESTRICTED, IF ANV (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH: YR-TO-DATE . CUMULATIVE 11 HOURS IN REPORTING PERIOD '744 2.160 45.816-
- 12. NUMBER : OF HOURS REACTOR WAS CRITICAL 744.0 1.640.4 41.003.4
- 13. REACTOR RESERVE SMUTDOWN HOURS. 0.0 'O.O -0.0 14 HOURS GENERATOR ON-LINE 744.0 1.532.8 40,137.7
- 15. : UNIT. RESERVE SHUTDOWN HOURS 0.0; . 0.0 OO-
~16. GROSS THERMAL ENERGY GENERATED (MWH) 2.569.104-~ 4 062.255 '126.291.838 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 867.200- '1.342.200 41.725.780
- 18. NET ELECTRICAL ENERGY GENERATED (MWM) 841.460 1,289.217 43,191.417-PAGE 1 OF'2
. - . ._ ._ .- -_ _ L _ ._-___L__.__--__....,..~.- . . . . - . . . . . .
.._ a- . . .._, g .. m_ ~ . ..__.._m..
. . . . _ . - .._..-~.m._..___.m... .m.___.---._.m. __._. .. ..___._.m.m_... .m _ . . . ...
OPERATING DATO GEPORT (CONTINUED) 'DOCCIET NO. 50 - 353 --.
b DATE APRIL 13 1995 _
~
-* , f 4 THIS MONTH 'YR-TO-DATE CUMULATIVE ,
- 19. UNIT SERVICE FACTOR 100.0 ~71.0 - 87.6
.- __ .----. ___ =.- ,
20.-UNIT AVAILABILITV FACTOR 100.0 71.0- 87.6 21.: UNIT CAPACITY FACTOR-(USING MDC NET) 101.4 54. 5 '. 83.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.4 54.5 : 83.1
- 23. UNIT FORCED OUTAGE RATE O.0 -4 . 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF.EACH):
- 25. IF-SHUTDOWN'AT END OF REPORT' PERIOD . ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -08/12/89 .08/12/89. /I INITIAL ELECTRICITY 09/01/89 -'09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90-1 6 s I
g s
4 i .p u.
.{
J PAGE 2 OF 2 i
f t-i-
4-d' 4 ,
4-i i
, i 1
.? --
1
- _. _ _ . . . _ _ . ..._...___..__._'_.._. __..._.m..._____ . _ . _ . _ _ . . _.-___n_. ___.1.m.__,___..______m.._- __;._._. . _._;.__m___ . _.n___.___.________.__.._._____.._.- .
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 e' UNIT NAME LIMERICK UNIT 2 DATE APRIL 13, 1995 t REPORT MONTH MARCH. 1995 COMPLETED BY PECO ENERGY-COMPANY DAVID R. HENRICKS REPORTS ENGINEER '
SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MET D OF LICENSEE .lSYSTEM COMPbMENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT l CODE CODE ACTION TO
- NO. DATE' (1) (HOURS) (2) REACTOR (3) REPORT
- I (4) (5) PREVENT RECURRENCE
.--.. . - - _ - - ___- - .-----.. . _ ~ - - ___ _ _
C3 950302 5 000.0 B 4 N/A RC FUELXX RLACTOR POWER WAS REDUCED TO 80% FOR THE PEOFORMANCE OF POWER ARTS MELLA TESTING. ;
' 41 950319- 5 000.0 B 4 N/A HA VALVEX RE/.CTOR POWER WAS REDUCED TO 90% FOR l MA1M TURBINE VALVE TESTING.
- l. -
(1) (2) (3) (4)
F- FORCED REASON .
METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT-FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF-DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ~ ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5) t G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE' T