Monthly Operating Repts for Mar 1995 for Limerick Nuclear Station
ML20082H974
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/31/1995
From: Henricks D, Muntz J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9504180007
Download: ML20082H974 (12)


Text

. . . _ __

u,,,.m e .m. o...,.

L .,

t .,

PECO ENERGY "; Li;'s '"""""

Sanatoga, PA 19464-0920 l

l

!1 .,

T.S.6.9.1.6 April 13, 1995 Docket'Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 l

l I

U. S. Nuclear Regulatory Commission l Attn: Document Control Desk Washington, DC 20555  !

Subject:

Limerick Generating; Station Monthly Operating.

Report For Units 1 and 2 ,

Enclosed are the monthly operating reports for Limerick-Units 1'and 2 for the month of March 1995 forwarded pursuant to Technical Specification 5.9.1.6. .

Very truly yours,  ;

dfML -

James A. Muntz <

Director - Site Engineering drh l l

I Enclosures

)

cc: T. T. Martin, Administrator, Region I, USNRC l_

N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS JST056 l' 9504180007 950331 r+- / I

'PDR ADOCK 05000352 U

,R- PDR , /((/[,

b _

,N

i.; - ,

i ' '. .

i -

i

... Docket No.60-362 1

Attachment to Monthly i Operating Report for -

) March 1996 i

i 1-4 i Limerick Generating Station -

I; . Unit 1

! March 1 through March 31,1996 1

! l. Narrative Summary d Operatirg Exneriences ,

3 I

Unit 1 began the month of March at a nominal 100% d rated thermal power (RTP).

l

,! On March 12,1996, at 0929 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.534845e-4 months <br />, power was reduced to 92% RTP'for main turbine valve L testing. Power was restored to 100% RTP at 1026 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.90393e-4 months <br />.

i Unit 1 ended this operating ' period at 100% of RTP.

! 11. Challenges to Main Steam Safety Relief Valves i

l There were no challenges to the Main Steam Safety Relief Valves during the month of March i

4-1 1

i 4

4-l-

3 4

l 1

4 4

J 4

OVER GE DAILV UNET POWER LEVEL . , .

-'{

DOCKET NO. 50 - 352- .

UNIT LIMERICK UNIT 1

=...---- ..............

DATE APRIL 13 1995 .

COMPANY PECO ENERGY COMPANY

....=_ _ _ _ - ........... . ,

DAVID R. HENRICKS  !

REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH MARCH 1995

.....=_

, j.

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

~

(MWE-NET) (MwE-NET) 1 1061 17 1061 2 1069 18 1057 3 1053 19 1062 4 1069 20 1062 5 1065 21 1058 6 1073 ,22 .1062 s 7 1050 23. 1054 8 1061 24 - 1063

'9 1065 25 '1062 to 1069 26 1054

-i 11- 1065 27 1059 12 1057 28 1058 :

13 .1061 29 1058  ;

14 1057 30 1053 I 15 1053 31 '1057 16 1053 i

.3 i

%m._i_m._m.__._.cm__ m .___________--_<r, d- - ., - m b,. ir -- , ,, 4~w . ,- .. -,, ,. ,, < . , , . . , .._...#-.. . , _ , - ,,.,,,v.-.

t OPERATING DATO CEPORT .

DOCKET NO. 50 - 352 .

DATE APRIL 13. 1995 COMPLETED BY PECO ENERGY COMPANY .

. . . . = = - _ _ . _ = - - - - _ _ - _ . . - . . . . . . .

DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610).718-3772 OPERATING STATUS

=- .._..----.....=_ --- _ - -

1. UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WERE NO LOAD DROPS
2. REPORTING PERIOD: MARCH. 1995 GREATER THAN 20% THIS MONTH.

--- __ .=........

3. LICENSED THERMAL POWER (MWT): 3293 4 NAMEPLATE RATING (GROSS MWE): 1092
5. DESIGN ELECTRICAL RATING (NET MWE): 1055 l
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1055

=_. ______- _

(-

8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7).SINCE.LAST REPORT. GIVE REASONS:

PLEASE SEE THE ATTACHED SHEET FOR REASONS TO CHANGE THE NAM 5 PLATE RATING

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE' 11 HOURS IN REPORTING PERIOD

==

744 2.160 80.304

- == .. .. ...--. --- ........

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2.140.5 66.248.8

.-. .....__ .....=

13. REACTOR RESERVE SHUTDOWN HOURS- 0.0 0.0 0.0

...-. = - . _ --..... ......-

14 HOURS GENERATOR ON-LINE 744.0 2.122.2 65.147.7

=_ . . . . - - --

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

..... =. ......_ =_- __- _ - - -

16. GROSS THERMAL ENERGY GENERATED (MWH) 2.448.206 6.955.718' 201.272.256

___ - _ = . _ = - - ......___

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 814.200 2,276.300 65.46G.580

'18. NET ELECTRICAL ENERGV GENERATED (MWH) 788.638 2.200.614 62.844.620 PAGE 1 OF '2

~ .;-

~

OPEQQTING DGTO CEPOSV (CONT 3NUED) ' DOCKET NO. 50 - 352[ ..

DATE APRIL 13 1995~ ' '

THIS MONTH VR-TO-DATE COMULATIVE'

19. UNIT SERVICE FACTOR 100.0 98.2 81.1
20. UNIT AVAILABILITV FACTOR 100.0 98.2 61.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.5 96.6- T4.2 *

.== .--------....

22.. UNIT CAPACITY FACTOR (USING DER NET) 100.5 96.6 74 '

23. UNIT FORCED OUTAGE RATE O.0 1.8 4.2' 24 SHUTDOWNS SCHEDULED OVER NEXT- 6 MONTHS (TVPE DATE A DURATION OF EACH):

A 4 DAY PLANNED OUTAGE (TENTATIVE) IS SCHEDULED ON MAY 8-11.1995 FOR BOP ISSUES: DRAIN COOLER REPAIR AND CONDENSER CLEANING.

25. IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP:

'26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED '

INITIAL CRITICALITY 12/19/84 12/22/84 .

INITIAL ELECTRICITV MID' APRIL 85 4/13/85 COMMERCIAL OPERATION '1ST OTR 86 2/01/86 f.

i PAGE 2 OF 2 t

4

- . . . . - - . . _ - _ _ . . - _ . _ . . . . - . . ..---.--_--__.________._-.________-_.x

i

[ OPEllATING DATA REPORT

, (ADDITIONAL PAGE) l Ooeratina Status I-l

8. If changes occur in capacity ratings (items number 3 through 7) since last report, give reasons: 3 l

i i The Nameplate Rating (Gross MWe), item Number.4, has been changed l from 1138 MWe to 1092 MWe.1138 MWe represents the gross output with j the Turbine Control Valves Wide Open (VWO). Umerick's Unit 1 licensed ~

i maximum reactor power will not produce enough steam to operate at VWO,

! therefore the nameplate rating has been adjusted to 1092 MWe.1092 MWe

{ represents the output derived from the turbine manufacture's heat balance j st the licensed maximum reactor power. The Limerick Unit 2 Nameplate l Rating has already been established at its maximum reactor power rating j following the Power UpRate last month.

t t

i '

I ,

i

.i l

l i~

i 4

l i

1 i-t

,m-- ,,- ,- y w w -- ,

UNIV SHUTDOWNS CND POCER CEDUCTIONS DOCCIET NO. 50 - 332 UNIT NAME LIMERICK UNIT 1 DATE APRIL ~ 13, 1995 ,

REPORT MONTH MARCH. 1995 COMPLETED BY PECO ENERGV COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772

--- _---... .-------.---_=

_ ----== -

- - _ _ - - . - - - - - - - _ _ - - - - - - - - . - - - - . . . - - - _ _ . - - - - - - - - - - - - . . - = _ - _ -

METHOD OF LICENSEE SYSTEM ' COMPONENT 'CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE- (1) (HOURS) (2) REACTOR (3) REPORT * (4) (5) PREVENT RECURRENCE

...-...--. _ = _ _ _ . _=- --_ -_---_ - - - _ . ...----=

54 950312 S 000.0 B 4 N/A HA VALVEX REACTOR POWER WAS REDUCED TO 92% FOR MAIN TURBINE VALVE-TESTING.

(1) (2) (3) (4) [

F - FORCED REASON METHOD EXHIBIT'G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)- 1-- MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. - EVENT REPORT (LER)

D - REGULATORY RESTRICTION .

4-- OTHER (EXPLAIN) FILE'(NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION P - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE 9

l -

l .

Docket No. 50-353 1

Attachment to Monthly  ;

Operating Report for i- March 1995 i 1 3

Umorick Generating Station l Unit 2 March 1 through March 31,1995 -

i l

! 1. Narrative Summary d Onoratino Experiences

! Unit 2 began the month d March at a nominal 100% of rated thermal power (RF),

i <

On March 2,1996, at 1011 hours0.0117 days <br />0.281 hours <br />0.00167 weeks <br />3.846855e-4 months <br />, power was reduced to 80% RTP for performance of t
mwer

! ARTS MELLA testing. Power was restored to 100% RTP at 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> On March 19,1996, at 0202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br />, power was reduced to 90% RTP for main turbins valve l testing.' Power was restored to 100% RTP at 0346 hours0.004 days <br />0.0961 hours <br />5.720899e-4 weeks <br />1.31653e-4 months <br />

Unit 2 ended this operating period at 100% of RTP.

i il. Challenoes to Main Steam Safety Relief Valves 1

i There were no challenges to the Main Steam Safety Relief Valves during the month of March.

1 l.

l i

I' 4

s f

i i

1 1

aa.- e i

_ _ . -- , _ ~ , .. , . - , - . - - . - . . , - . - . ,

OVEE GE DQILV UNIT POWEQ' LEVEL .

DOCKET NO. 50 - 353 .

UNIT LIMERICK UNIT 2~

DATE APRIL 13 1995  ; .~

COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 7tP3772 MONTH MARCH 1995 DAY AVERAGE DAILV POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET)

-1 1137 17 1131 2 1121 18 -1126 3 1129 19 '1132 4

4 1145 20 1132 5 1141 '21 1128 6 1148- 22 1132 1-7 1120 23 1124 8 1139 24 1128 9 1135 25 '1128 10 1140 26 .1124 ,

11 1135 27 '1128 12 1136. 28 1128 13 1132 29 1128 14 1133 ' 30 1124 15  : 1128 31 1124 -

16 1123

- _ _ -.._m- _-_---__._ru1mr___>w,am _ , _ _ * - w_-a m_ e w dp swq -1' tb'**W*- -9*d *

  • e eta m'w-:- e se

OPERATING DQTQ REPORT .

DOCKET NO. 50 - 353 . .s .

DATE APRIL 13 1995 COMPLETED BY.PECO ENERGV. COMPANY ,

. DAVID R. HENRICKS ,

REPORTS ENGINEER.

SITE ENGINEERING -

LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 ,

OPERATING STATUS 1 UNIT NAME: LIMERICK UNIT 2 . NOTES: THERE WERE NO LOAD DROPS

2. REPORTING PERIOD MARCH. 1995 GREATER THAN 20% THIS MONTH.
3. LICENSED THERMAL POWER (MWT): 3458 4.. NAMEPLATE RATING (GROSS MWE) : 1163
5. DESIGN ELECTRICAL RATING (NET MWE)'s 1115 .[
6. MAXIMUM DEPENDABLE CAPACITV'(GROSS MWE): 115
7. MAXIMUM DEPENDABLE CAPACITV (NET MWE): 1115 - l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWFP. LEVEL' TO WHICH RESTRICTED, IF ANV (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH: YR-TO-DATE . CUMULATIVE 11 HOURS IN REPORTING PERIOD '744 2.160 45.816-

12. NUMBER : OF HOURS REACTOR WAS CRITICAL 744.0 1.640.4 41.003.4
13. REACTOR RESERVE SMUTDOWN HOURS. 0.0 'O.O -0.0 14 HOURS GENERATOR ON-LINE 744.0 1.532.8 40,137.7
15. : UNIT. RESERVE SHUTDOWN HOURS 0.0; . 0.0 OO-

~16. GROSS THERMAL ENERGY GENERATED (MWH) 2.569.104-~ 4 062.255 '126.291.838 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 867.200- '1.342.200 41.725.780

18. NET ELECTRICAL ENERGY GENERATED (MWM) 841.460 1,289.217 43,191.417-PAGE 1 OF'2

. - . ._ ._ .- -_ _ L _ ._-___L__.__--__....,..~.- . . . . - . . . . . .

.._ a- . . .._, g .. m_ ~ . ..__.._m..

. . . . _ . - .._..-~.m._..___.m... .m.___.---._.m. __._. .. ..___._.m.m_... .m _ . . . ...

OPERATING DATO GEPORT (CONTINUED) 'DOCCIET NO. 50 - 353 --.

b DATE APRIL 13 1995 _

~

-* , f 4 THIS MONTH 'YR-TO-DATE CUMULATIVE ,

19. UNIT SERVICE FACTOR 100.0 ~71.0 - 87.6

.- __ .----. ___ =.- ,

20.-UNIT AVAILABILITV FACTOR 100.0 71.0- 87.6 21.: UNIT CAPACITY FACTOR-(USING MDC NET) 101.4 54. 5 '. 83.1

22. UNIT CAPACITY FACTOR (USING DER NET) 101.4 54.5  : 83.1
23. UNIT FORCED OUTAGE RATE O.0 -4 . 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF.EACH):
25. IF-SHUTDOWN'AT END OF REPORT' PERIOD . ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -08/12/89 .08/12/89. /I INITIAL ELECTRICITY 09/01/89 -'09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90-1 6 s I

g s

4 i .p u.

.{

J PAGE 2 OF 2 i

f t-i-

4-d' 4 ,

4-i i

, i 1

.? --

1

  • _. _ _ . . . _ _ . ..._...___..__._'_.._. __..._.m..._____ . _ . _ . _ _ . . _.-___n_. ___.1.m.__,___..______m.._- __;._._. . _._;.__m___ . _.n___.___.________.__.._._____.._.- .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 e' UNIT NAME LIMERICK UNIT 2 DATE APRIL 13, 1995 t REPORT MONTH MARCH. 1995 COMPLETED BY PECO ENERGY-COMPANY DAVID R. HENRICKS REPORTS ENGINEER '

SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MET D OF LICENSEE .lSYSTEM COMPbMENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT l CODE CODE ACTION TO

- NO. DATE' (1) (HOURS) (2) REACTOR (3) REPORT

  • I (4) (5) PREVENT RECURRENCE

.--.. . - - _ - - ___- - .-----.. . _ ~ - - ___ _ _

C3 950302 5 000.0 B 4 N/A RC FUELXX RLACTOR POWER WAS REDUCED TO 80% FOR THE PEOFORMANCE OF POWER ARTS MELLA TESTING.  ;

' 41 950319- 5 000.0 B 4 N/A HA VALVEX RE/.CTOR POWER WAS REDUCED TO 90% FOR l MA1M TURBINE VALVE TESTING.

l. -

(1) (2) (3) (4)

F- FORCED REASON .

METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT-FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF-DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ~ ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5) t G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE' T

_u. . _ - ._ . . - - . . _ . - - - - - _ - - . _ _ - _ - _ . _ . . _ _ . . - _ . . . _ - - - - _ _ - _ . -- - e.~- . _ . - - - . - . -_ - - - - - , _ _ . , - - . _ _ -