a IFERATING DATA REPORT DOCKET NO 50-369 DATE Aoril 14. 1995 4

OPERATIN6 STATUS CONPLETED BY R.A. Willines TELEPHOE 7H-382-5346 i

1. Unit Name: McGuire 1
2. Reporting Period March 1,1995-flarch 31,1995
3. Licensed Thereal Power (Mti:

3411

4. Naseplate Rating (Gross Nel:

1305e Notes #Naeoplate Rating -

5. Design Electrical Rating (Net Me):

!!90 (6ross Wel calculated as

6. Marious Dependable Capacity (Stoss M el

!!71 1450.000 W A :.90 power

7. Itaxinus Dependable Capacity (Net Me):

!!29 NURE6-0020.

factor per Page ill, B. If Changes Dccur in Capacity Ratings (itees Nueber 3 Through 7) Since Last Report. Elve Reasons:

t

9. Power Level To Which Restricted, if Any (Net Me):
10. Reason For Restrictions, If any:

I This Month Yr.-to-late Cuaulative i

!!. Hours In Reporting Period 744.0' 2160.0 116856.0

12. Number Of Hours Reactor Was Critical 744.0 2129.7 82489.1
13. Reactor Reserve Shutdown Hours -0-- -
14. Hours Generator On-Line 744,0 2120.5 B1633.1
13. Unit Reserve Shutdown Hours

--0--

--0--

16. Bross Thersal Energy Benerated (191) 2533681 7182428 2550M854
17. 6ross Electrical Energy Generated ( MH) 876999 2490091 87641814
18. Net Electrical Energy Benerated ( MH) 845595 2397323 837M691 j
19. Unit Service factor 100.0~

98.2 69.9 l

20. Unit Availability Factor 100.0 98.2 69.9

)

21. Unit Capacity Factor (Using MDC Natl 100.7 98.3 62.4
22. Unit Capacity Factor (Using DER Wet) 96.3 94.1 60.7
23. Unit Forced Outage Rate 0.0 1.8 14.2 i
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachl:

1 None

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units In Test Status (Prior to Coseercial Operationi:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9504180047 950414 PDR ADOCK 05000369 R

PDR

.~

_ ~.

Lj OPERATIN6 MTA REPORT 30CKET NO 50-M9 tAlti liramire 1 MTE Asril 14. 1995 ColFLETED BY R.A. Williams

.TELEPHOE - 704-382-5346-MONTH March. 1995 '

l E_

AYERAGE MILY POER LEYEL E

AVERAGE MILY P0llER LEVEL (m*t t

( m

  • ti l

1 11M 17 11M i

2 11M 18 -

11M 3

1139 19 11M 4

113B 20 -

' ilM i

5 1138 21 ilM '

6 1139 22 11M 7

1141 23 1134 8

1141 24 1132 l

9 1139 25 1131 =

l 10 1139 26 1133 1140 27 1133

]

l 12 1139 28 1132 I

'l la 11M 29 1132 14 1130 30 1132 15 1137 31 1127

-l 1

16 1139 l

~

DOCKET NO.,

50-3E9 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME nwu Anr., 1 DATE. vela */30___

REPORT MONTH March 1995 COMPLETED BY x.

a.

wAAAAans TELEPHONE t ium j -J e e-s_J e o 3

(4)

(5)

(1)

{2)

E HOD T

A OF LICENSE CAUSE AND CORRECTIVE N

Y S

SHUT EVENT SYS-O P

DURATION O

DOWN REPORT TEM COMPONENT ACTION TO-DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S

bxhibitG-Instructions ethod:

Forced eason:

1-Manual for Preparation.of Data S~ Scheduled A-Equipment Failure (Explain)

B-Maintenance or test 2-Manual Scram Ent U Sneets For Licensee C-Refueling 3-Automatic Scram Eyent Report-(LER)

D-Regulatory Restriction 4-Other (Explain)

-File (NUREG-0161)

E-Ogerator Training-& License Examination bxhibitI-Same-Source-r$t$

E H-O her (Explain) (Explain)

-~...

l DOCKET: 50-369 UNIT:.McGuire 1 Date:

04/14/95 i

NARRATIVE

SUMMARY

MONTH: March 1995 McGuire Unit 1 began the month of March' operating at 100% full power. The unit

.l l

eperated at or near 100% full' power for the entire month.

i i

i i

l c

i i

k I

l Prepared by: R. A. Williams Telephone: (704)-382-5346 t

i MONTHLY REFUELING INFORMATION REOUEST I

l 1.

' Facility names McGuire,

' Unit 1 2.

Scheduled next refueling shutdown: December 1995 3.

Scheduled' restart following refueling: January 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a j

technical specification change or other licence amendment?

f If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and j

l supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, j

i significant changes in design or new operating procedures),

j i

l 7.

Number of Fuel assemblies (a) in the core lil I

(b) in the spent fuel pools ill

8. Present licensed fuel pool capacity: 1111 Size of requested or planned increases ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 j

DUKE POWER COMPANY DATE: Aoril 14, 1995 i

Name of

Contact:

R.

A. Williams Phone (7041-382-5346

OPERATING DATA REPORT DOCKET NO 50-370 DATE April 14. 1995 OPERATING STATUS COMPLETEDBY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Name McGuire 2
2. Reporting Period March 1, 1995-March 31, 1995
3. Licensed Thereal Power (Mt):

3411

4. Naseplate Rating (Gross We):

1305e Notes aNaseplate Rating

5. Design Electrical Rating (Wet MWe):

1180 (Gross Me) calculated as

6. Maximus Dependable Capacity (6ross Me):

1171 1450.000 MVA :.90 power

7. Maxinus Dependable Capacity (Net MWe):

!!29 factor per Page til,

8. If Changes Occur in Capacity Ratings (Items Nueber 3 Through 7) Since Last NUREG-0020.

R; ort. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cusulative

!!. Hours In Reporting Period 744.0 2160.0 97152.0

12. Number Of Hours Reactor Was Critical 772.8 1918.1 75470.9
13. Reactor Reserve Shutdown Hours

~0- -

--0--

14. Hours Generator On-Line 722.8 1872.0 74456.7 l

13.UnitReserveShutdownHours - -0--

16. Gross Thersal Energy Generated (MWH) 2445829 6243384 244088798
17. Gross Electrical Energy Generated (MWH) 854928 2184560 85232158
18. Net Electrical Energy Generated (MWW) 824336 2099432 81721778
19. Unit Service Factor 97.1 86.7 76.6
20. Unit Hvailability Factor 97.1 86.7 76.6
21. Unit Capacity Factor (Using MDC Net) 98.1 86.1 73.7
22. Unit Capacity Factor (Using DER Net) 93.9 82.4 71.3
23. Unit Forced Outage Rate 2.9 1.1 6.5
24. Ehutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 1

25. If Shut Down At End Of Report Period. Estiaated Date of Startup April 06 1995 l
26. Units In Test Status (Prior to Ceasercial Operation):

Forecast Achieved l

l INITIAL CRITICALITY INITIAL ELECTRICITY l

COMMERCIAL OPERATION l

c.

OPERATill6 DATA REPORT 90CKET110

$0-370 Ull!T k8uire 2 -

BATE Asril 14. 1995'-

ColFLETEI BY R,A,Willians TEL PHollE 704-302-5346' i

110llTH March. 1995 MI, -

AYERA6E DAILY PDilER LFVEL M1

. AVERAGE DAILY poler LEVEL l

(flie-Ilet)

(Mlle-tiet) 1

~1151 17 1151

-2 1150 18 1148 -

l 3

1151

- 19 1149 i.

4

!!50 20 1150 9

1151

'21 1150 6-

-1152 22 1149 7

1154 23 1147 ~

8

'1153 24 1145 i

9 1152 25 1145 -

10 1152 26 11 4 11 1153 27 1148 '

l 12 1153 28 1146 l

13 1152 29 11M 14 1151 30 1018 13 1149 31 0

i i

16 1151 l-I l

-i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.53-370 UNIT NAME nusuixm, e DATE ve/14/vp

+

REPORT MONTH March 1995 COMPLETED BY x.

a.

williams TELEPHONE tiusj-J54-3Jeb I

(1)

{2) g (4)

(5)

E HOD

.T A

OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION-4-P 95-3-30'

-F B

2 95-3-31 F

21.25 A-1 CF VALVEX RESIDUAL HEAT REMOVAL CONTROL VALVE LEAK.

I i.

i i

t t

(1 (2

(3)

(4) hibit G ~ - Instructions Forced eason-

. Method:

E 1-Manual for Preparation of Data

'A-Equipment FailureB-Maintenance or test (Explain)

S Scheduled 2-Manual Scram EntW Sneets For Licensee Event Report (LER (NNEG-0161) )

C-Refueling 3-Automatic Scram D-Regulatory R9striction 4-Other (Explain)

File E-Operator haining & License Examination

.F-Administrative-(5)

G-Operator Error Exhibit I.- Same Source

. H-Other -(Explain) (Explain) m c--,

.aw

.r-


_,_-_____n

~.

DOCKET: 50-370 UNIT: McGuire 2 I

Date:

04/14/95 NARRATIVE

SUMMARY

MONTH March 1995 McGuire Unit 2 began the month of March operating at 100% full power. The_ unit-i cperated at or near 100%' full power until 03/30/95 at 1625, when the unit decreased' I

power due to a residual heat removal control valve leak. The unit held from 2020 to 2052 at 66% powerLdue to nuclear instrumentation calibration. On 03/31/95 the unit-was taken off-line at 0245 due to a residual heat removal. control valve leak. The unit M : off-line the remainder of the month.

i 1

i I

?

i

-i a

l l

I l

Prepared by: R. A. Willians Telephones (704)-382-5346 i

i 1

J.e e

i i

MONTHLY REFUELING INFORMATION REOUEST 1.-

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown: Aoril 1996 3.

-Scheduled restart following refueling: May 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT..

)

1 4

4.

Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?

If yes, what will these be?

l If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for. submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: lli f

(b) in the spent fuel pools 111

?

I

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increases ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: Acril 14, 1995 l

Name of

Contact:

R.

A. Williams Phone: 17041-382-5346 j