Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082N878 + (11:40:04, 14 December 2024)
- ML20082N873 + (11:40:05, 14 December 2024)
- ML20082N875 + (11:40:05, 14 December 2024)
- ML20082N871 + (11:40:06, 14 December 2024)
- ML20082N869 + (11:40:10, 14 December 2024)
- ML20082N857 + (11:40:10, 14 December 2024)
- 05000266/LER-1995-003-01, :on 950325,inadvertent EDG Start.Caused by Error Made by Test Engineer.Edg Was Shutdown & Restored to Normal stand-by Mode + (11:40:12, 14 December 2024)
- ML20082N829 + (11:40:13, 14 December 2024)
- 05000278/LER-1995-001-02, :on 950323,Unit 3 Scram on Low Condenser Vacuum Due to Loss of Steam Jet Air Ejector.Scram & PCIS Group Ii/Iii Isolation Logics Were Reset + (11:40:14, 14 December 2024)
- 05000354/LER-1995-005, :on 950320,unplanned Manual Reactor Scram Due to Loss of Both Reactor Recirculation Pumps While in Operational Condition 1.Design Change Was Created to Eliminate MG Set Motor Breaker Trip + (11:40:16, 14 December 2024)
- ML20082N810 + (11:40:18, 14 December 2024)
- ML20082N797 + (11:40:19, 14 December 2024)
- ML20082N801 + (11:40:19, 14 December 2024)
- ML20082N781 + (11:40:20, 14 December 2024)
- ML20082N759 + (11:40:25, 14 December 2024)
- ML20082N745 + (11:40:31, 14 December 2024)
- ML20082N756 + (11:40:31, 14 December 2024)
- ML20082N742 + (11:40:32, 14 December 2024)
- ML20082N743 + (11:40:32, 14 December 2024)
- ML20082N733 + (11:40:33, 14 December 2024)
- NG-95-1458, Documents Results of Visual Exam of Core Spray Sparger,As Requested by NRC Bulletin 80-13.No Indications of Cracks or Structural Failures Found + (11:40:33, 14 December 2024)
- ML20082N649 + (11:40:40, 14 December 2024)
- ML20082N657 + (11:40:40, 14 December 2024)
- ML20082N637 + (11:40:41, 14 December 2024)
- ML20082N643 + (11:40:41, 14 December 2024)
- B15191, Responds to NRC Re Violation Noted in Insp Rept 50-336/95-02 on 950101-0207.Corrective Actions:Reinforced Individual Responsibility & Facility TS & Surveillance Procedures Reviewed + (11:40:42, 14 December 2024)
- ML20082N622 + (11:40:43, 14 December 2024)
- ML20082N615 + (11:40:43, 14 December 2024)
- ML20082N608 + (11:40:44, 14 December 2024)
- ML20082N613 + (11:40:44, 14 December 2024)
- HL-4831, Ei Hatch Nuclear Plant Units 1 & 2 Annual Rept Plant Radioactive Effluent Releases Jan-Dec 1994 + (11:40:45, 14 December 2024)
- ML20082N592 + (11:40:47, 14 December 2024)
- RBG-35-501, Special Rept:On 910805,non-valid Failure of Div II Diesel Generator Occurred.Caused by Vibration Switch Malfunction. Switch Removed & Sent to Cooper Industries Enterprise Div for Insp + (11:40:47, 14 December 2024)
- ML20082N580 + (11:40:48, 14 December 2024)
- ML20082N579 + (11:40:48, 14 December 2024)
- ML20082N577 + (11:40:49, 14 December 2024)
- BECO-91-113, Forwards Semiannual Rept for Long Term Program,Per Section VA of Plan for Long Term Program-Pilgrim Nuclear Power Station, Including Schedules for a & B Regulatory Items, Commitment Descriptions & Progress Since Last Update + (11:40:50, 14 December 2024)
- ML20082N567 + (11:40:50, 14 December 2024)
- ML20082N566 + (11:40:51, 14 December 2024)
- ML20082N564 + (11:40:52, 14 December 2024)
- ML20082N563 + (11:40:52, 14 December 2024)
- ML20082N562 + (11:40:55, 14 December 2024)
- ML20082N559 + (11:40:55, 14 December 2024)
- ML20082N555 + (11:40:56, 14 December 2024)
- ML20082N558 + (11:40:56, 14 December 2024)
- ML20082N554 + (11:40:57, 14 December 2024)
- ML20082N553 + (11:40:59, 14 December 2024)
- ML20082N552 + (11:41:00, 14 December 2024)
- ML20082N550 + (11:41:01, 14 December 2024)
- ML20082N549 + (11:41:02, 14 December 2024)
- ML20082N545 + (11:41:03, 14 December 2024)