-e p
Northem States Power Company l
Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 April 20,1995 U S Nuclear Regulatory Commission 10 CFR Part 50 Attn: Document Control Desk Section 50.90 Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 Ucense No. DPR-22 Revision 1 to License Amendment Request Dated June 8,1994 Standby Gas Treatment and Secondary Containment Technical Specifications in our License Amendment Request dated June 8,1994, Monticello proposcd c.%ng9s to section 3.7/4.7, Standby Gas Treatment System, conceming the surveillance requirement to operate the Standby Gas Treatment System monthly as well as revised performance j
requirements for the Standby Gas Treatment System filters and process stream inline electric i
heaters. The proposed amendment included revised Standby Gas Treatment System and Secondary Containment limiting conditions for operation specified in section 3.7 to establish consistency. Changes were also proposed for the Secondary Containment capability surveillance requirement specified in section 4.7.
In subsequent discussions with the NRC Staff, we leamed of enhancements and corrections to our pending amendment request. The purpose of this revision to our License Amendment j
Request dated June 8,1994 is to resolve these items.
Monticello feels strongly that the proposed changes requested in our June 8,1994 Ucense Amendment Request, with the minor changes presented in this submittal, provide significant improvements in the Monticello Technical Specifications goveming the Standby Gas Treatment System (SGTS). These improvements result from providing improvements for ensuring operational readiness of the SGTS system, as well as establishing consistency with related Technical Specification requirements. The proposed changes provide for consistency in testing frequency between SGTS automatic initiation testing and the related automatic initiation testing for primary containment isolation valves. The proposed changes also establish consistency between the SGTS Limiting Condition for Operation action requirements and related requirements in the Monticello Technical Specification for Secondary Containment.
Enhancements are provided in the proposed changes for ensuring the operational readiness of the SGTS system via improved surveillance requirements and performance requirements.
This revision incorporates NRC staff comments by the following changes:
1.
Deletion of the 18 month frequency requirement has been revised such that this deletion pertains only to surveillance requirement 4.7.B.2.b(3).
f 9504250414 950420 PDR ADOCK 05000263 Ug p
PDR l, ey
' I '.
.)
NORTHERN STATES POWER COMPANY April 20,1995 Page 2 2.
Modification of the limiting condition for operation is requested for specification 3.7.C.4, concoming Secondary Containment.
3.
The bases section for Standby Gas Treatment and Secondary Containment has been revised to reflect the method used to extrapolate secondary containment capability test data to calm wind conditions, i
This revision replaces in its entirety our June 8,1994 License Amendment Request. Changed i
inforrnation presented in Exhibit A is identified by a side bar. This changed information has no i
Impact on the original determination of no significant hazards.
Please contact Marvin Engen, Sr Licensing Engineer, (612-295-1291) if you require further information related to this request.
r I
NYbn M
William J Hill Plant Manager Monticello Nuclear Generating Plant c:
Regional Administrator-Ill, NRC NRR Project Manager, NRC i
Resident inspector, NRC State of Minnesota l
Attn: Kris Sanda Attachments: Affidavit to the US Nuclear Regulatory Commission Exhibit A - Evaluation of Proposed Changes Exhibit B - Proposed Changes Marked Up on Existing Technical Specification Pages Exhibit C - Revised Technical Specification Pages J