MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20209E0891999-07-0707 July 1999 TS Change Request 269 for License DPR-16,changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5281999-06-18018 June 1999 Application for Amend to License DPR-16,modifying TSs to Reflect Installation of Addl SFP Storage Racks.Proprietary & non-proprietary Version of Rev 4 to HI-981983,encl. Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20195D0631999-06-0303 June 1999 TS Change Request 226 to License DPR-16,permitting Plant Operation with Three Operable Recirculation Loops ML20206H9541999-04-28028 April 1999 LAR 251 for License DPR-16,requesting Approval to Handle Loads Up to & Including 45 Tons in Reactor Bldg During Power Operations ML20205P8481999-04-15015 April 1999 TS Change Request 267 to License DPR-16,modifying Number of Items in Sections 2 & 3 of Ts,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0581998-12-23023 December 1998 Application for Amend to License DPR-16 Changing TS Pages 3.8.2 & 4.8-1 to Specify Surveillance Frequency of Once Per Three Months ML20195C6451998-11-10010 November 1998 TS Change Request 264 to License DPR-16,revising TS 5.1.A by Removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7141998-11-0505 November 1998 TS Change Request 266 to License DPR-16,modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20153H1391998-09-19019 September 1998 LAR 263 to License DPR-16,revising TS Section 5.4.8 of Plant Ufsar,Incorporating Use of Freeze Seal as Temporary Part of Reactor Coolant Pressure Boundary ML20151V5051998-09-0303 September 1998 TS Change Request 259 to License DPR-16,requesting TS 3.4.A.10.e & 3.5.A.2.e,contained in App a of Facility License,Be Revised to Incorporate Condensate Storage Tank Level Limit of Greater than 35 Feet ML20237D9551998-08-21021 August 1998 TS Change Request 255 to License DPR-16,removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 as Noted ML20236T1141998-07-23023 July 1998 Application for Amend to License DPR-16,changing TS Contained in App a to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4951998-07-21021 July 1998 TS Change Request 256 to License DPR-16,permitting Alternative to Requirement to Perform Control Rod Drive Scram Time Testing W/Reactor Pressurized Prior to Resuming Power Operation.W/Certificate of Svc ML20236T4751998-07-21021 July 1998 TS Change Request 257 to License DPR-16,making Several Changes to Section 6 of Tech Specs & Make Other Changes of Administrative Nature ML20236H1981998-06-29029 June 1998 Rev 1 to TS Change Request 230 to License DPR-16,deleting Requirements That Biennial EDG Insp & Station Battery Capacity Tests Be Done While Plant Is Shutdown & Increasing Per Cent of Rated Power to Be Reached During Diesel Testing ML20248K2781998-05-28028 May 1998 Application for Amend to License DPR-16,requesting That TS 4.5.A.1 Be Revised Such That First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2691997-12-23023 December 1997 Rev 1 to TS Change Request 253 for License DPR-16,reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2431997-12-10010 December 1997 Application for Amend to License DPR-16,consisting of TS Change Request 171,modifying TS Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198P3491997-10-30030 October 1997 Proposed Amended Page 4 for LAR 252,reflecting Latest Rev Levels of Plant Security Contingency Plan & Security Training & Qualification Plan ML20217H8741997-10-10010 October 1997 TS Change Request 253 to License DPR-16,changing Trade Name of Owner & Operator of Plant ML20135C1521996-11-27027 November 1996 TS Change Request 224 to License DPR-61,inserting Page 8 of No Significant Hazards Determination Inadvertently Omitted ML20135C1911996-11-27027 November 1996 TS Change Request 232 to License DPR-16,changing Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3371996-11-12012 November 1996 Application for Amend to License DPR-16,consisting of Change Request 224,implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0391996-10-31031 October 1996 Application for Amend to License DPR-16,requesting Deletion of Tech Spec Table 3.5.2 Which Lists Automatic Primary Containment Isolation Valves ML20129A5501996-10-10010 October 1996 Application for Amend to License DPR-16,revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20129C0611996-10-10010 October 1996 Application for Amend to License DPR-16,clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20134F4061996-10-0404 October 1996 Application for Amend to License DPR-16,revising TS 2.1.A to Reflect Change in SLMCPR & TS 3.10.C Revising Operating CPR Limit for Stability ML20117E6951996-08-23023 August 1996 Application for Amend to License DPR-16,consisting of TS Change Request,Proposing New pressure-temp Limits Up to 22, 27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corresponding EFPY of Operation ML20115G2011996-07-17017 July 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20113A8521996-06-19019 June 1996 Application for Amend to License DPR-16,Tech Spec Change Request Change Request 242,Rev 1 Re Implementation of 10CFR50,App J,Option B ML20111A3701996-05-0707 May 1996 TS Change Request 247 to License DPR-16,adopting Provisions of STS NUREG-1433,Rev 1,dtd 950407 Which Clarify SR Applicability & Allow Max Period of 24 H to Complete SR Upon Discovery That Surveillance Missed ML20107E7601996-04-15015 April 1996 Application for Amend to License DPR-16,revising Spec 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7621996-03-28028 March 1996 Application for Amend to License DPR-16,modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J5991996-03-25025 March 1996 Application for Amend to License DPR-16,deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J8981996-02-23023 February 1996 Application for Amend to License DPR-16,allowing Implementation of 10CFR50,App J,Option B ML20100H9331996-02-22022 February 1996 Application for Amend to License DPR-16,deleting EDG Insp Requirement & Mod of Spec Re AOT ML20095C0921995-12-0505 December 1995 Application for Amend to License DPR-16,consisting of Change Request 231 Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20094D1341995-10-26026 October 1995 TS Change Request 229,modifying License Condition 2.C.(5) to Eliminate Process Associated W/Obtaining Separate NRC Approvals for Reviewing Insp Results & Obtaining Restart Authorization Prior to End of Each Refueling Outage ML20086A7051995-06-26026 June 1995 Application for Amend to License DPR-16.Amend Would Eliminate Requirement to Perform Reactor Shutdown & Drywell Solely for Purpose of Inspecting Snubbers in Svc for Only 12 Months ML20078M1381994-11-25025 November 1994 Application for Amend to License DPR-16,consisting of TS Change Request 222,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20073F9341994-09-26026 September 1994 LAR 223 to License DPR-16,revising License Condition 2.C.(6) Re Long Range Planning Program ML20072L4701994-08-19019 August 1994 TS Change Request 220 to License DPR-16,updating & Clarifying SRs for Control Rod Exercising & Standby Liquid Control Pump Operability Testing to Be Consistent W/Generic Ltr 93-05 ML20070E3381994-07-0808 July 1994 Application for Amend to License DPR-16,revising TS to Provide Improved Protection to Safety Related Electrical Equipment from Loss of Capability in Event of Sustained Degraded Voltage Condition on Electrical Grid ML20078A7691994-06-24024 June 1994 TS Change Request 221 to License DPR-16,deleting TS 2.3.0 & Associated Bases,Reflecting Removal of Recirculation Flow Scram ML20069Q6751994-06-22022 June 1994 Application for Amend to License DPR-16,consisting of TS Change Request 217,rev 1,clarifying Requirements for Demonstrating Shutdown Margins ML20069M8031994-06-15015 June 1994 TS Change Request 216,revising Setpoints of TS 2.3.D, Reactor High Pressure,Relief Valve Initiation, by Increasing Setpoint Value by 15 Psig for Each Electromatic Relief Valve in ADS ML20070R5101994-05-12012 May 1994 TS Change Request 218 to License DPR-16,revising TS Sections 3.1 & 4.1 for Protective Instrumentation,Associated Bases & Tables to Increase Surveillance Test Intervals & Add Allowable out-of-svc Times ML20029E0431994-05-0606 May 1994 TS Change Request 217 to License DPR-16,clarifying Requirements for Demonstrating Shutdown Margin ML20065M9971994-04-19019 April 1994 TS Change Request 213 to License DPR-16,updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable During Pressure Testing 1999-07-07
[Table view] |
Text
_ _ _ _ - _ _ _ _ _____ _
. s .
l
. f P
GPU NUCLEAR CORPORATION '
OYSTER CREEK NUCLEAR GENERATING STATION t
Operating License :
No. DPR-16 :
1 Technical Specification !
Change Recuest No. 201, Rev. I !
Doc (et No. 50-219 l.
7 i
i i
Applicant-submits, by this Technical Specification Change Request No. 201, Rev. I to the Oyster Creek Nuclear Generating' Station Technical Specifications, a proposed change to page 4.2-1. i r / -
By J. J. f arfon "
esident and Director V'eP) ster Creek ,
i i
SwornandSubscribedtobeforemethisQ9*k day of , 1991.
WE benyPeaseHeser / l My Commiselon tgises /d 93 t t
?
91o9100004 910829 L DR ADOCK0500g9 E
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the matter ) Docket No. 50-219 GPU Nuclear Corporation )
CERTIFICATE OF SERVICE l This is to certify that a copy of Technical Specification Chan,e Request No. 201, Rev. I for Oyster Creek Nuclear Generating Station Technical Specifications, filed with the U.S. Nuclear Regulatory Commission on August 29 , 1991, has this day of Auaust 29 , 1991, been served on the Major of Lacey Township, Ocean County, flew Jersey by deposit in the United States mail, addressed as follows:
The Honorable Debra Madensky I.ayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 1 /
By J. J. I;arft orf Vi e P' e:I dent and Director Oy ter Cl ok l
. 4 0YSTER CREEK NUCLEAR GENERATING STATION OPERATING LICENSE NO. DPR-16 i DOCKET NO. 50-219 .
TECHNICAL SPECIFICATION CHANGE REQUEST NO. 201, Rev. 1 l l
t Applicant hereby requests the Commission to change Appendix A to the above {
captioned license as below, and pursuant to 10 CFR 50.91, an analysis l concerning the determination of no significant hazards considerations is also presented: ;
i
- 1. Section to be Chanaed l Technical Specification Sections 4.2. A, and 4.2.C.1. !
- 2. Extent of Chanoo :
Technical Specification Sections 4.2.A. and 4.2.C.1 are revised to -
delete restriction that the refueling outage interval is not to exceed 20 conths. -
- 3. Chanaes Reuves_ tad The requested change: are shown on attached Technical Specifications ;
page 4.2-1. ;
- 4. Purpose l
Technical Specification Section 4.2.A currently requires a control rud >
withdrawal test to demon trate that the core can be made subcritical with a margin of 0.25% A k, at any time in the subsequent cycle. This .
test is specified to be performed following a refueling outage when !
core alterations were performed, with a clarification that this !
criteria is not to exceed 20 months. :
Technical Specifications Section 4.2.C.1 currently requires scram time testing of all operable control rods with reactor pressure above 800 !
psig. This test is specified to be performed after each major refueling outage and prior to resuming power operation, with a clarification that this interval is not to exceed 20 months. ;
As stated in the current Technical Specification Section 3.2-and 4.2 Bases, the purpose of Technical Specification Section 4.2.A is to verify adequate shutdown margin for reactivity control for the subsequent operating cycle. This test is performed following a j refueling outage with the core in the cold, xenon free condition, which ensures that the criterion is satisfied for the entire subsequent fuel -
cycle. The purpose of Technical Specification Section 4.2.C.1 is to . i verify acceptable control rod scram insertion times for the subsequent >
operating cycles after refueling prior to resuming operations. Review '
of seven (7)_ control rod scram insertion time tests from 1982 to present indicates test acceptance criteria has been consistently satisfied.
i o
1 4.2 REACTIVITY CONTROL l Anglicability: Applies to the surveillance requircments for reactivity control. !
Qbiective: To verify the capability for controlling reactivity.
SoecificatioJ1 .
1 A. Following a reactor refueling when core alterations were performed, sufficient control rods shall be withdrawn to den.onstrate with a margin '
of 0.25% o k that the core can be made subcritical at any time in the '
subsequent fuel cycle with t ie strongest operable control rod fully ;
withdrawn and all other operable rods fully inserted. ,
B. The control rod drive housing support system shall be inspected after reassembly. '
C. 1. After each major refueling outage and 3rior to resuming power l ;
caeration, an operable control rods sla11 be scram time tested from ,
11e fully withdrawn position with reactor pressure above 800 psig.
- 2. Following each reactor scram from rated pressure, the mean 90% !
insertion tim shall be determined for eight selected rods. If the [
mean 90% insertion time of the selected control rod drives does not ,
fall within the range of 2.4 to 3.1 seconds or the measured scram !
time of any one drive for 90% insertion does not fall within the range of 1.9 to 3.6 seconds, an evaluation shall be made to provide reasonable assurance that proper control rod drive performance is maintained.
- 3. Following any outage not initiated by a reactor scram, eight rods shall be scram tested with reactor pressure above 800 psig provided these have not been measured in six months. The same criteria of 4.2.C(2) shall apply.
D. Each partially or fully withdrawn control rod shall be exercised at least once each week. This test shall be performed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in the event of power operation is continuing with two or more inoperable control rods or in the event power operation is continuing with one fully or partially withdrawn rod which cannot be moved and for which control rod drive mechanism damage has not been ruled out. The surveillance need not be completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if the number of inoperable rods has been reduced to less than two and if it has been demonstrated that control rod drive mechanism collect housing failure is not the cause of an immovable control rod.
E. Surveillance of the standby liquid control system shall be as follows:
- 1. Pump operability 0nce/ month
- 2. Boron concentration 0nce/ month determination Corrected: 12/24/84 0YSTER CREEK 4.2-1 Amendment No.: 13, 75, 144 l
.be J These results confirm that control rod scram insertion time does not
- n v . r. , significantly degrade with operating cycle length. Additionally,
- m W:
Technical Specification Section 4.2.D requires that each partially or
- N fully withdrawn control rnd be exercised at least once each week. This surveillance serves as a periodic check agatast deterioration of the
.s
'gs. control rod system and provides additional assurance of control rod operability.
C Yhe 20 month surveillance interval restriction for these tests is not
~
d NM.) relevant since the purpose of these tests is to verify acceptable 4f reactivity contro; parameters, following refueling activities for the st.bsequent operating cycle. Therefore, the proposed change to delete this restriction has no effect on tne requirements for reactivity
,fe;,;+ c' for the subsequent operating cycle. This change does not tivolve any change to the actual surveillance requirements, ner does it
- involve any change to the limits and restrictiore on plant operations. The reliability of systems and components relied upon
- o prevent or mitigste the consequences of accidents previoutly avaluated is not 6 graded, Assurance of cdequate reactivity centrol for the subsequent operating cycle is maintained. This _
change does not involve anv change to system or muipr.nnt configuration. Therefore, th's chang does ,at increase the probability of occurrence or the :enser:ecces of an Occident previously evaluated.
- 2. Operation of the facility in accordance with the propt ri amendment would not create the possibility of a new or .ti.fferent kind of accident from any accident previously evaluated. The proposed amendment removes the 20 month interval restriction on survillance perhrmed following refueling activities which verify acceptable reactivity control for t'ne subsequent operating cycle.
This change does not invola any change to the actual surveillance requirements, nor does it '.n w;ve any change to the limits and restrictions on plant operation. This change does act involve r ~
change to system or equipment configuration. Assurance of adequate reactivity control for the subsequent operating cycle is a maintained.
9 u\: ..
- 3. Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety. The proposed amendment removes the 20 month interval restriction on surveillance performed following refueling i
activities which verify acceptable reactivity control for the subsequent operating cycle. This change does not involve any change to +he actual survei.!ance requirements, nor does it involve an, .hange to the limits and restrict 4.aqs on plant
, operation. The reliability of syst ems a,$d components is not degraded. Assurance of adequate ra activity control for the
- subsequent operating cycle is maintained. Therefore, it is concluded that operation of the facility in accordance with the proposed amendment does not involve a significant reduction in a margin of safety.
The proposed deletion of the 20 month interval restriction is not relevant to the purpose of the Technical Specification surveillance. Implementation of the proposed amendment will maintain the required level of assurance of adequate reactivity control for subsequent operating cycle. Thus, operation of the facility in accordance with the proposed amendment involves no
< significant hazards considerations.
6.0 IMPLEMENTATION It is requested that the amendment authorizing this change become effective upon issuance.