Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082T184 + (11:24:04, 14 December 2024)
- ML20082T180 + (11:24:05, 14 December 2024)
- ML20082T181 + (11:24:05, 14 December 2024)
- RBG-35-527, Requests Relief from Requirements of Section XI of ASME Boiler & Pressure Vessel Code for Temporary Weld Overlay Repair of Indication in N4A-2 Feedwater Nozzle to safe-end Weld at Facility + (11:24:06, 14 December 2024)
- PLA-1945, Monthly Operating Rept for Oct 1983 + (11:24:07, 14 December 2024)
- 05000341/LER-1991-017, :on 910813,valve Discovered Closed When Group 9 Primary Containment Isolation Logic for Valve Inadvertently Energized.Caused by Personnel Error.Required Reading Given to I&C Personnel + (11:24:08, 14 December 2024)
- 05000315/LER-1983-115-03, /03L-0:on 831019,17 safety-related Fire Doors Intentionally Made Inoperable to Perform Corrective Door Frame Maint.Caused by Maint Performed While Equipment Required to Be Operable + (11:24:10, 14 December 2024)
- ML20082T166 + (11:24:11, 14 December 2024)
- ML20082T163 + (11:24:12, 14 December 2024)
- ML20082T165 + (11:24:12, 14 December 2024)
- ML20082T161 + (11:24:13, 14 December 2024)
- ML20082T157 + (11:24:17, 14 December 2024)
- ML20082T156 + (11:24:17, 14 December 2024)
- ML20082T153 + (11:24:18, 14 December 2024)
- RBG-16-412, Responds to IE Bulletin 83-06, Noncompliance Matls Supplied by Tube-Line Corp. Investigation Underway to Demonstrate That Matls Suitable for Intended Svc.Nonconforming Matl Will Be Replaced + (11:24:18, 14 December 2024)
- RBG-16-284, Provides Corrected Statements Re Chlorination Practices Contained in ,In Response to IE Bulletin 81-03. Util Does Not Intend to Prechlorinate River Water When Water Introduced Into Makeup Water Intake Line + (11:24:19, 14 December 2024)
- ML20082T150 + (11:24:19, 14 December 2024)
- 05000249/LER-1983-041-03, /03L-0:on 831108,while Performing Auto Blowdown Logic Test Dis 250-4,time Delay Relay 287-105A Tripped at 127.6 s, Exceeding Tech Spec Limit.Caused by Instrument Setpoint Drift.Relay Adjusted + (11:24:21, 14 December 2024)
- ML20082T142 + (11:24:22, 14 December 2024)
- ML20082T137 + (11:24:23, 14 December 2024)
- RBG-16-399, Interim Deficiency Rept DR-141 Re Internal Attachment Bolts in Check Valves Supplied by Velan Engineering Co. Investigation Incomplete.Next Rept Will Be Submitted by 840109 + (11:24:23, 14 December 2024)
- ML20082T127 + (11:24:24, 14 December 2024)
- ML20082T125 + (11:24:24, 14 December 2024)
- ML20082T117 + (11:24:27, 14 December 2024)
- ML20082T115 + (11:24:27, 14 December 2024)
- 05000316/LER-1983-110-03, /03L-0:on 831108,breaker for Control Room Pressurization Sys Recirculation Damper Found Open.Cause Could Not Be Determined.Breaker Closed + (11:24:29, 14 December 2024)
- ML20082T112 + (11:24:30, 14 December 2024)
- ML20082T103 + (11:24:30, 14 December 2024)
- ML20082T102 + (11:24:31, 14 December 2024)
- ML20082T094 + (11:24:31, 14 December 2024)
- RBG-16-420, Final Deficiency Rept DR-130 Re air-operated Check Valves Supplied by Atwood & Morrill Co.Deficiency Determined Not Reportable Under 10CFR50.55(e) + (11:24:32, 14 December 2024)
- ML20082T080 + (11:24:33, 14 December 2024)
- RBG-16-361, Interim Deficiency Rept DR-126 Re Standby 480-volt Load Ctrs Supplied by Powell Electric.Interim or Final Status Rept Will Be Provided by 831207 + (11:24:33, 14 December 2024)
- 05000265/LER-1983-019-03, /03L-0:on 831107,battery Failed to Meet Rated Load Capacity While Performing Qts 120-5 24/48 Battery Discharge Test.Caused by End of Svc Life.Batteries 2A & 2B Replaced + (11:24:35, 14 December 2024)
- ML20082T074 + (11:24:36, 14 December 2024)
- ML20082T075 + (11:24:36, 14 December 2024)
- ML20082T069 + (11:24:37, 14 December 2024)
- ML20082T072 + (11:24:37, 14 December 2024)
- ML20082T066 + (11:24:38, 14 December 2024)
- ML20082T054 + (11:24:45, 14 December 2024)
- 05000373/LER-1983-140-03, /03T-0:on 831123,incorrect Jumper Installation Identified,Preventing Automatic Start of Standby Gas Treatment Sys from Div 1 Initiation Signal.Caused by Jumper Installed on Wrong Panel.Jumper Removed + (11:24:46, 14 December 2024)
- RBG-16-398, Interim Deficiency Rept DR-142 Re Bellows Assembly of Relief Valve Supplied by Crosby Valve Co.Interim or Status Rept Will Be Provided by 840112 + (11:24:47, 14 December 2024)
- RBG-16-423, Interim Deficiency Rept DR-124 Re Monorail Sys Supplied by Whiting Corp.Interim or Final Rept Will Be Provided by 840126 + (11:24:48, 14 December 2024)
- ML20082T041 + (11:24:48, 14 December 2024)
- ML20082T032 + (11:24:49, 14 December 2024)
- ML20082T038 + (11:24:49, 14 December 2024)
- 3F1283-15, Forwards Status of Open Items Remaining from Nuclear Safety Task Force Recommendations Re 800226 Transient at Facility + (11:24:50, 14 December 2024)
- ML20082T030 + (11:24:50, 14 December 2024)
- ML20082T025 + (11:24:51, 14 December 2024)
- 05000266/LER-1995-004, :on 950328,loss of Voltage Relays Not Calibr to TS Limits.Caused by Review of Setpoint Changes from Temporary Values to Permanent Was Less than Adequate.Ts 15.3.0 Was Entered at 0703 + (11:24:53, 14 December 2024)
- RBG-16-458, Interim Deficiency Rept DR-135 Re Min Flow Return Lines in Suppression Pool.Interim or Final Status Rept Will Be Provided by 840112 + (11:24:53, 14 December 2024)
- ML20082T019 + (11:24:54, 14 December 2024)