PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)841-4502 JOHN S. KEMPER December 12, 1983 V tf E +R ESID E NT ENG4NkE RS%G AND RESE ARCH Mr. J. B. Stolz,' Chief Docket Nos. 50-277 Operating Branch No. 4 50-278 Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 Subj ect:

Peach Bottom Atomic Power Station, Units 2 & 3 Mark I Program - Torus Attached Piping File:

GOVT 1-1 (NRC)

Dear.Mr. Stolz:

This letter confirms the meeting that was held in our offices on September 23, 1983 and attended by Philadelphia Electric, Bechtel, NRC, and Franklin Research Center personnel (see Attachment I).

.At the meeting, Philadelphia Electric and Bechtel presented information regarding the torus attached piping at Peach Bottom which completes the Mark I activities for Peach Bottom. The specific items discussed at the meeting were the following:

1.

Scope of analyses and the components evaluated 2.

Loading Combinations 3.

Analysis Methods 4.

Acceptance Criteria 5.

Conclusions 6.

Modifications Required All modifications for Unit 3 have been completed. The only Unit 3 activities remaining are the completion of equipment nozzle evaluations and as-built reconciliation of the modifications. Work on Unit 2 modifications is in progress and will be completed by the end of the next refueling outage (currently scheduled to start February 20, 1984).

A preliminary copy of the addendum to the Plant Unique Analysis Report covering the torus attached piping has been informally transmitted to your Mr. H. Shaw. 2ne rinal report will be transmitted after the Unit 2 modifications are completed. Submittal of the final report is tentatively scheduled for June, 1984.

At the conclusion of the meeting, your Mr. H. Shaw summarized the NRC's position as follows:

8312150189 831212

@l PDR ADOCK 05000277 P

PDR I

k

e..

e

' ,e.

-1.

All the NRC's questions regarding the Mark I program and torus attached ~ piping had been answered.

L'

~

2. -

It is recognized that the final report would be subnitted af ter all modifications and evaluations are completed.

3.-

The' preliminary results regarding torus' attached piping are acceptable.

' We understand that these comments will enable the NRC to complete

this portion of the, Mark I program.

Sincerely,.

. Copy to:

H. Shaw, NRC-

\\

ii-

ATTACH}ENT I Attendance List for September 23, 1983 Meeting Name Organization D. W. Baldwin Philadelphia Electric Co.

D. M. O'Rourke Philadelphia Electric Co.

J. F. O'Rourke Philadelphia Electric Co.

H. W. Vollmer Philadelphia Electric Co.

M. Khlafallah Bechtel Power Corp.

R. Palaniswamy Bechtel Power Corp.

H. Shaw U.S. Nuclear Regulatory Commission A. K. Le Franklin Research Center N. Subramonian Franklin Research Center S. Triole Franklin Research Center 6/4

. _..