Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000305/LER-1983-030-03, /03L-0:on 831117,sampling Pump for Containment Gaseous & Particulate Radiation Monitor R-11 Failed to Operate.Caused by Bare Wires Shorting Out Paper Drive Fast Speed Motor.Fast & Slow Speed Motors Replaced + (10:50:44, 14 December 2024)
- ML20083G698 + (10:50:45, 14 December 2024)
- 05000361/LER-1983-147-03, /03L-0:on 831121,train a Control Room Fan Failed to Start Automatically on Toxic Gas Isolation Sys Signal. Caused by Spurious Failure of Relay in Unit 2 Power Source. Fan Aligned to Unit 3 Power Source + (10:50:47, 14 December 2024)
- 05000325/LER-1983-061-03, /03L-0:on 831127,reactor Power intermediate-range Monitor C51-IRM-K601H Determined Inoperable Due to Downscale Indications.Caused by Signal Preamplifier Low/High Range Gain of K601H Out of Adjustment + (10:50:49, 14 December 2024)
- ML20083G693 + (10:50:51, 14 December 2024)
- ML20083G691 + (10:50:51, 14 December 2024)
- 05000370/LER-1983-082-03, /03L-0:on 831126,surveillance Test on Ice Condenser Intermediate Deck Door Not Performed.Door Declared Inoperable.Caused by Operator Error.Test Performed Satisfactorily on 831128 + (10:50:53, 14 December 2024)
- 05000305/LER-1983-031-03, /03L-0:on 831121,during Full Power Operation,Irpi Channel for Rod J-10 Removed from Svc for Maint.Caused by Remote Indicator Span Drifting High.Indicator Span Recalibr + (10:50:56, 14 December 2024)
- 05000275/LER-1983-027-03, /03L-0:on 831117,diesel Generator 1-2 Air Receiver 1-2a Fell Below Min Pressure Setpoint.Caused by Starting Air Compressor 1-2A Internal Relief Valve Not Reseating.Relief Valve Replaced + (10:50:58, 14 December 2024)
- 05000362/LER-1983-102-03, /03L-0:on 831116,channel a of post-LOCA Hydrogen Monitor Failed & Declared Inoperable.Caused by Shorted Capacitor in Circuit Board Resulting in Blown Fuse.Circuit Board & Fuse Replaced + (10:51:00, 14 December 2024)
- 05000362/LER-1983-105-03, /03L-0:on 831119 & 29,mini-purge Exhaust Containment Isolation Valve 3HV9825 Failed to Close within Max Isolation Time.Caused by Imbalance Between Opening Air Supply Pressure & Closing Spring Tension + (10:51:02, 14 December 2024)
- 05000362/LER-1983-109-03, /03L-0:on 831111,qualified Safety Parameter Display Sys Channel a Began Intermittently Failing & Declared Inoperable.Caused by Failed Power Supply to Plasma Display.Power Supply Replaced + (10:51:04, 14 December 2024)
- ML20083G678 + (10:51:05, 14 December 2024)
- ML20083G679 + (10:51:05, 14 December 2024)
- ML20083G673 + (10:51:06, 14 December 2024)
- ML20083G665 + (10:51:07, 14 December 2024)
- ML20083G662 + (10:51:07, 14 December 2024)
- ML20083G659 + (10:51:10, 14 December 2024)
- ML20083G657 + (10:51:11, 14 December 2024)
- ML20083G653 + (10:51:12, 14 December 2024)
- ML20083G652 + (10:51:12, 14 December 2024)
- ML20083G651 + (10:51:13, 14 December 2024)
- 05000305/LER-1983-032-03, /03L-0:on 831201,containment Spray Pump Breaker 1B Failed to Close When Requested During Monthly Pump & Valve Surveillance Test.Cause Unknown.Pump Monitored + (10:51:15, 14 December 2024)
- 3F1283-36, Advises That Util Will Use Nsa/Impell Rept, Methodologies for Classification of Low Level Radwaste from Nuclear Power Plants, in Order to Comply W/Requirements of 10CFR61. Revised Process Control Program Due by 840229 + (10:51:16, 14 December 2024)
- ML20083G641 + (10:51:16, 14 December 2024)
- ML20083G631 + (10:51:17, 14 December 2024)
- 05000416/LER-1983-183-03, /03L-0:on 831123,control Room Standby Fresh Air Unit B Found W/Flow Rate in Excess of Tech Spec Limit.Caused by Inadequate Retest Following Maint Work.Damper Limit Switches Readjusted + (10:51:18, 14 December 2024)
- ML20083G627 + (10:51:19, 14 December 2024)
- ML20083G626 + (10:51:20, 14 December 2024)
- ML20083G620 + (10:51:21, 14 December 2024)
- ML20083G624 + (10:51:21, 14 December 2024)
- ML20083G618 + (10:51:22, 14 December 2024)
- 05000315/LER-1983-120-03, /03L-0:on 831203,Fire Door 471 (Control Rod Drive Room Access Door),Would Not Latch Properly.Caused by Latch & Strike Plate Misalignment.Strike Plate Adjusted + (10:51:23, 14 December 2024)
- ML20083G616 + (10:51:24, 14 December 2024)
- ML20083G608 + (10:51:30, 14 December 2024)
- ML20083G606 + (10:51:31, 14 December 2024)
- ML20083G605 + (10:51:31, 14 December 2024)
- 05000315/LER-1983-090, Forwards Updated LER 83-090/03X-1 & LER 83-120/03L-0 + (10:51:32, 14 December 2024)
- ST-HL-AE-1034, Forwards Response to Generic Ltr 83-10C Re TMI Action Item II.K.3.05, Automatic Trip of Reactor Coolant Pumps. Response to Item 1.2 Will Be Provided by 840515 + (10:51:33, 14 December 2024)
- ML20083G593 + (10:51:33, 14 December 2024)
- ML20083G587 + (10:51:34, 14 December 2024)
- ML20083G592 + (10:51:34, 14 December 2024)
- RBG-16-670, Forwards Response to Environ Rept - OL Stage,Review Question E460.1 Re Radwaste Mgt Sys.Info Forwarded Per Generic Ltr 82-14 + (10:51:35, 14 December 2024)
- ML20083G581 + (10:51:36, 14 December 2024)
- ML20083G584 + (10:51:36, 14 December 2024)
- DCL-84-002, Requests Authorization to Perform Precriticality Hot Sys Testing & to Achieve Criticality & Conduct Low Power Testing by 840201.Heatup Tests in Modes 4 & 3 Will Be Completed by 840131.Certificate of Svc Encl + (10:51:37, 14 December 2024)
- ML20083G575 + (10:51:38, 14 December 2024)
- ML20083G564 + (10:51:38, 14 December 2024)
- ML20083G563 + (10:51:39, 14 December 2024)
- ML20083G562 + (10:51:39, 14 December 2024)
- ML20083G559 + (10:51:40, 14 December 2024)